CONDOMINIUM AND COOPERATIVE MILESTONE INSPECTION,
STRUCTURAL INTEGRITY RESERVES, AND MANDATORY RESERVE CHECKLIST
NOTE: This checklist is solely intended to assist in determining whether inspection and reserve requirements enacted by SB 4D (2022) apply to a
given condominium or cooperative. Even if the new requirements imposed by SB 4D (2022) are inapplicable, other provisions of Chapters 718 and
719 relating to maintenance and reserves may apply.
STEP 1: Submit and maintain accuracy of building inventory list with DBPR.
a. Has the Association, no later than January 1, 2023, filed and kept current information with the
DBPR including the number of buildings on the condominium or cooperative property that are
three stories or higher in height, the total number of units in all such buildings, the addresses of all
such buildings, and the counties in which all such buildings are located?
NO Prepare and file immediately. Proceed to Step 2.
YES Confirm information current. Proceed to Step 2.
STEP 2: Determine whether milestone inspections, structural integrity reserve studies, and mandatory
reserves are required:
a. Does the condominium contain any buildings three or more stories in height?
NO NO milestone inspection, structural integrity reserve study, or mandatory
reserves required. No further action is required.
YES milestone inspection, structural integrity reserve study, and mandatory reserves
may be required, continue to Step 2, section b.
b. Do any buildings with three (3) or more stories contain more than three single family units?
NO NO milestone inspection, structural integrity reserve study, or mandatory
reserves required. No further action is required.
YES Milestone inspections, structural integrity reserve studies, and mandatory
reserves required. Proceed to Step 3.
STEP 3: Determine whether Developer complied with turnover milestone inspection, structural integrity
reserve study, and mandatory reserve requirements:
a. Has turnover occurred?
NO No turnover milestone inspection or structural integrity reserve study due until
turnover (but other timelines apply). Proceed to Step 4.
YES Turnover milestone inspection or structural integrity reserve study due. Proceed
to Step 3, section b.
b. If turnover occurred May 26, 2022 or later, did the developer provide a milestone inspection and
structural integrity reserve study at turnover?
NO Demand developer provide milestone inspection and structural integrity reserve
study. Proceed to Step 4.
YES No demand to developer needed. Proceed to Step 4.
STEP 4: Determine milestone inspection filing deadlines (other than turnover):
a. Was a certificate of occupancy issued for any building prior to July 1, 1992?
NO Proceed to Step 4, section b to determine first deadline.
YES First milestone inspection filing due December 31, 2024 and every 10 years
thereafter. See worksheet enclosed herewith. Proceed to Step 5 to determine structural
integrity reserve study deadlines.
b. For buildings with certificate of occupancy issued July 1, 1992 or after, is the building located
within three miles of coastline?
NO The initial milestone inspection for each building will be due by December 31
st
of the year that the building turns thirty (30) years of age based on the certificate of
occupancy and every ten (10) years thereafter. See worksheet enclosed herewith. Proceed
to Step 5 to determine structural integrity reserve study deadlines.
YES The initial milestone inspection will be due by December 31
st
of the year the
building turns twenty-five (25) years of age based on the certificate of occupancy and every
ten (10) years thereafter. See worksheet enclosed herewith. Proceed to Step 5 to determine
structural integrity reserve study deadlines.
Step 5: Determine structural integrity reserve study deadlines:
a. Does the Association already have a structural integrity reserve study, prepared by licensed
architect and engineer and meeting other statutory requirements
1
for the required components
which is less than ten years old? (Required components include roof, load-bearing walls or other
primary structural members, floor, foundation, fireproofing and fire protection systems, plumbing,
electrical systems, waterproofing and exterior painting, windows, any other item with deferred
maintenance or replacement expense in excess of $10,000 which, if not performed would
negatively impact the aforementioned components)
NO First structural integrity reserve study due by December 31, 2024.
YES Structural integrity reserve study due 10 years from date of prior structural
integrity reserve study.
1
See Sec. 718.103, Florida Statutes.
Step 6: Ensure timely compliance!
a. Retain and consult appropriate experts to comply with milestone inspection, structural integrity
reserve studies, and mandatory reserve requirements.
b. Retain milestone inspection, structural integrity reserve studies in official records and on web
site (if web site required).
c. See Shumaker, Loop & Kendrick, LLP Client Alert and SB 4D (2022) for further information.
d. Review other potentially applicable inspection and reserve requirements set forth in Chapters
718/719 or governing documents.
CONDOMINIUM AND COOPERATIVE MILESTONE INSPECTION,
STRUCTURAL INTEGRITY RESERVES, AND MANDATORY RESERVE WORKSHEET
NOTE: This worksheet is solely intended to assist in determining whether inspection and reserve requirements enacted by SB 4D (2022) apply to
a condominium or cooperative. Even if the new requirements imposed by SB 4D (2022) are inapplicable, other provisions of Chapters 718 and 719
relating to maintenance and reserves may apply.
General Condominium/Cooperative Information
Name of Condominium/Cooperative:
County(ies):
Total Number of Buildings: Total Number of Buildings over 3 Stories in Height
2
:
For any buildings over 3 Stories in Height, how many contain more than 3 single family units
3
?
Individual Building Information and Deadlines
Instructions: Fill out the below information for each building which is over 3 stories in height AND which contains more
than 3 single family units.
Building Number/Address:
Date Certificate of Occupancy Issued: Total Number of Units:
Certificate of Occupancy (the “CO”) was issued prior to July 1, 1992. Proceed to Chart One A for
Milestone Inspection Deadlines, then proceed to Chart Two for Structural Integrity Reserve Study
Deadlines.
Certificate of Occupancy (the “CO”) was issued on or after July 1, 1992. Proceed to Chart One B for
Milestone Inspection Deadlines, then proceed to Chart Two for Structural Integrity Reserve Study
Deadlines.
CHART ONE. Milestone Inspection Deadlines (due every 10 years after initial due date).
A. Certificate of Occupancy was issued prior to July 1, 1992.
First Milestone Inspection
Due Date
Second Milestone
Inspection Due Date
Third Milestone
Inspection Due Date
Fourth Milestone
Inspection Due Date
December 31, 2024
December 31, 2034
December 31, 2044
December 31, 2054
2
If this number is zero, no milestone inspections, structural integrity reserve study, or mandatory reserves are required.
3
If this number is zero, no milestone inspections, structural integrity reserve study, or mandatory reserves are required.
B. Certificate of Occupancy was issued after July 1, 1992.
First Milestone
Inspection Due Date
Second Milestone
Inspection Due Date
Third Milestone
Inspection Due Date
Fourth Milestone
Inspection Due Date
If Building is NOT
located within 3 miles
of coastline:
December 31, 20___
(year CO was issued
plus 30 years)
December 31, 20___
(previous due date plus
10 years)
December 31, 20___
(previous due date plus
10 years)
December 31, 20___
(previous due date plus
10 years)
If Building is located
within 3 miles of
coastline:
December 31, 20___
(add 25 years to year
CO was issued)
December 31, 20___
(previous due date plus
10 years)
December 31, 20___
(previous due date plus
10 years)
December 31, 20___
(previous due date plus
10 years)
CHART TWO. Structural Integrity Reserve Study Deadlines (due every 10 years after initial due date).
First Structural
Integrity
Reserve Study
Due Date
Second
Structural
Integrity
Reserve Study
Due Date
Third
Structural
Integrity
Reserve Study
Due Date
Fourth
Structural
Integrity
Reserve Study
Due Date
The Condominium or Cooperative has,
within the last 10 years, a structural
reserve study for all required
components:
Roof
Load-bearing walls or other primary
structural members
Floor
Foundation
Fireproofing and fire protection
systems
Plumbing
Electrical systems
Waterproofing and exterior painting
Windows
Other item with deferred maintenance
or replacement expense in excess of
$10,000, which, if not performed, would
negatively impact the aforementioned
components
________ ___,
20___
(add 10 years to
date of last
structural reserve
study)
________ ___,
20___
(add 10 years to
date of last
structural reserve
study)
________ ___,
20___
(add 10 years to
date of last
structural reserve
study)
________ ___,
20___
(add 10 years to
date of last
structural reserve
study)
The Condominium or Cooperative does
NOT have, within the last 10 years, a
structural reserve study for all
required components
December 31,
2024
December 31,
2034
December 31,
2044
December 31,
2054