Buildings Department
Practice Note for Mandatory Building
and Window Inspection Schemes
PNBI-7
Building Inspection Report
Pursuant to section 12(2) of the Building (Inspection and Repair) Regulation
(B(I&R)R), a registered inspector (RI) must, within 7 days after completion of a prescribed
inspection in respect of a building, submit an inspection report to the Building Authority
(BA). The RI is also required under section 30(1)(a) of the B(I&R)R to deliver a copy of
the inspection report to the person for whom the prescribed inspection is carried out.
2. Guidelines on preparing an inspection report have been given in the Code of
Practice for the Mandatory Building Inspection Scheme and the Mandatory Window
Inspection Scheme. The following reference documents are provided to facilitate the
preparation of inspection report:
(a) Checklists for preparing an inspection report for different building elements
(Appendix A);
(b) Sample inspection report on projections (balcony / verandah) (Appendix
B); and
(c) Sample inspection report on common parts and external walls (Appendix
C).
3. The reference documents listed above are for general guidance and are not
meant to be exhaustive. The RI may include other items as necessary. The checklists
should be used for assuring that essential information is included in the inspection
report. The checklists are however NOT required to be submitted to the BA.
4. To facilitate record management, the RI should submit to the BA a separate
non-rewritable DVD-ROM containing a copy of the inspection report in PDF file format
of 200dpi resolution together with a hard copy of the inspection report.
5. To ensure due administration of the Buildings Ordinance (BO), the BA carries
out random audit checks on inspection reports submitted. The BA will consider taking
prosecution and/or disciplinary actions against RI who blatantly or repeatedly
contravenes the requirements of the BO and its subsidiary regulations.
( YU Tak-cheung )
Building Authority
Ref. : BD GR/1-125/101/0 (II)
First issue : April 2016
Last revision : April 2018
This revision : August 2020 (AD/MBI) (Paragraph 3(b) of Appendix C amended)
Appendix A
(PNBI-7)
Checklists for preparing an inspection report
for different building elements
The requirements for inspection report are generally stipulated in the Buildings
Ordinance (BO), the Building (Inspection and Repair) Regulation and related regulations, the
Code of Practice for the Mandatory Building Inspection Scheme and the Mandatory Window
Inspection Scheme (the Code) and PNBIs. To ensure that all the essential information is
contained in the inspection report, the following checklists are provided for RI’s reference:
Checklist
No.
Title
SC1 Master Checklist for Inspection Report
SC2 Checklist for External Wall
SC3 Checklist for Structural Elements
SC4 Checklist for Fire Safety Provisions
SC5 Checklist for Drainage System
SC6 Checklist for Unauthorized Building Works(UBW) / Change in Use
SC7 Checklist for Curtain Wall
SC8 Checklist for Cantilevered Projecting Structures
SC9 Checklist for Balcony/Verandah
Checklist No. SC1
Master Checklist for Inspection Report
The inspection report is prepared for the following MBIS notice served under section 30B of
the Buildings Ordinance (BO):
30B(3) : Prescribed Inspection in respect of the common parts of a building
30B(4) : Prescribed Inspection in respect of the external wall of a building/premises
30B(5) : Prescribed Inspection in respect of the projections of a premises
30B(6) : Prescribed Inspection in respect of the signboards of a building
1.
Have following building information been
obtained?
Yes
and
Reported
No or Not
Applicable
refer to the
report at
- OP date;
- Original and current usage;
- Number of storeys and units;
- Approved floor plans where available;
- Principal construction materials;
- Salient information of previous inspection and
repair;
- Name of Owners’ Corporation and management
company.
2.
Reference documents
- Have the approved building, structural,
drainage, alteration and addition plans been
obtained and listed out in the report?
- Have the plans and details of minor works been
obtained and listed out in the report?
- Have the plans and documents submitted to the
BA under section 39C of the BO for validation
of prescribed building or building works (i.e.
signboard, supporting frame for A/C unit,
drying racks and window canopies) been
obtained and listed out in the report?
- Have Fire Safety Directions been received?
- Are there any information and records of
previous large scale repair works?
Checklist No. SC 1 P. 1 / 4
3.
Method Statement for Building Inspection
- Apart from visual inspection, have any other
tests conducted?
Brief Description :_________________
- If RI’s representative is appointed to assist RI to
ascertain the extent of the defects, have the
particulars, qualifications and experience of the
RI’s representative been provided in the report?
4.
Inspection Result
- Have the checklists for the following building
elements been completed (if applicable)?
Checklist for External Wall (No. SC2)
Checklist for Structural Elements (No. SC3)
Checklist for Fire Safety Provisions (No. SC4)
Checklist for Drainage System (No. SC5)
Checklist for Unauthorized Building Works /Change
in Use (No. SC6)
Checklist for Curtain Wall (No. SC7)
Checklist for Cantilevered Projecting Structures
(No. SC8)
Checklist for Balcony/Verandah (No. SC9)
- Have “Inspection Forms for MBIS” been
provided in the report?
- Have the photos for each elevation of the
building been provided?
- Have the summary of all building defects and
deficiencies in table form been provided?
The table shall be accompanied by annotated
photos and marked up plans, where necessary,
or inspection results accompanied by annotated
Yes
No or Not
refer to the
and Applicable
report at
Reported
Checklist No. SC 1 P. 2 / 4
photos showing conditions of the building
inspected where rectification and repair works
are not required.
- In case that a defect extending from common
parts or external walls to individual flats is
identified and the RI intends to draw BD’s
attention to it, is the record included in the
report?
5.
Summary and Assessment
- Have a concise summary and assessment of the
conditions of the whole building and its major
elements been provided?
- Is detailed investigation proposed?
Detailed investigation may be required when
there are any serious defects, not arising from
normal deterioration, constituting structural
instability or serious health hazard, or where the
extent or cause of the defects cannot be
ascertained in the inspection.
- If there are any building components and areas
which required regular maintenance,
replacement or management for maintaining
safety until the next cycle of inspection, has
advice on the need for regular maintenance and
replacement of building components been
provided?
6.
Repair Proposal
- Have marked-up plans for repair works been
provided?
The mark up plan, where appropriate, should
show the demarcation of the different types of
rectification and repair works to be carried out
under the MWCS (specifying the class, type,
and item) or works requiring prior approval of
plans and consent to the commencement of
works from the Building Authority (BA).
Yes
No or Not
and Applicable
Reported
Repair is
not
required
refer to the
report at
Checklist No. SC 1 P. 3 / 4
- Has the method statement for rectification and
repair works including details of the proposed
methods, materials, specifications and
precautionary measures been provided?
- Has the proposal of proof tests been provided?
- If RI’s representative will be appointed in repair
stage in accordance with section 6.4 of the
Code, have particulars, qualifications and
experience of the RI’s representative been
provided?
7.
Recommendation for Improvement/Upgrading Works
- Has recommendation for
improvement/upgrading works such as those
under the purview of the FS(CP)O or FS(B)O
been provided?
Yes
No or Not
and Applicable
Reported
refer to the
report at
Checklist No. SC 1 P. 4 / 4
_____
_____
_____
_____
_____
_____
_____
_____
Checklist No. SC2
Checklist for External Wall
1.
Sufficient Visual Inspection
- Has sufficient visual inspection been carried out
from a close distance to all external walls
(including protective barriers, parapets and
balustrades) and has hammer tapping been
carried out at representative area? (PNBI-6
refers)
2.
If item 1 above could not be met:
- Would re-inspection be carried out at repair
stage?
- Have any tests been carried out?
(e.g. infrared thermography)
- Any recent records of building conditions?
3.
Defects on the External Wall Finishes & Rendering
- Are there any cracks or spalling observed?
- Are there any loose or missing tiles/rendering
observed?
- Apart from the above defects, are there any
other defects observed?
Brief Description :_________________
4.
Defects on the Fin/Grilles/Cladding/Appendages
- Are there any defects observed?
Examples:
a. Dilapidation;
b. Rust or corrosion of metallic parts or fixing;
c. Cracks or signs of distress;
d. Loose or defective fixing; and
e. Deformation or displacement.
(4/2018)
Yes
No or Not
and Applicable
Reported
Not
sufficient.
However, more
information
will be/ have
been obtained
in item (2) to
support the
observation
Details
refer to the
report at
Page No.
Checklist No. SC 2 P. 1 / 1
_____
_____
_____
_____
_____
_____
Checklist No. SC3
Checklist for Structural Elements
1.
Sufficient Visual Inspection
- Has sufficient visual inspection been carried out
from a close distance to structural elements and
has hammer tapping been carried out at
representative area?
(Cantilevered slab type structure shall be fully
exposed for inspection while other structure
shall be at least 30% exposed for inspection.)
2.
If item 1 above could not be met:
- Would re-inspection be carried out at repair
stage?
- Have any other tests been carried out?
(e.g. infrared thermography)
- Any recent records of structural conditions?
3.
Defects on Structural Elements
- Are there any defects observed?
Examples:
a. Dampness;
b. Rust stains or corrosion of reinforcement;
c. Cracks or signs of distress;
d. Spalling;
e. Delamination;
f. Exposed reinforcement;
g. Voids and honeycombing;
h. Deformation or displacement; and
i. Abnormal separation of the building from
adjoining buildings.
4.
Cantilevered Projecting Structures
- Are there any cantilevered projecting
structures?
Canopy
Balcony / Verandah
Fins
Yes
No or Not
and Applicable
Reported
Not
sufficient.
However,
more
information
will be/ have
been obtained
in item (2) to
support the
observation
Details refer
to the report
at Page No.
Checklist No. SC 3 P. 1 / 2
Features
A/C Platform
Drying Racks
Planter boxes
- Has/Have checklist(s) for cantilevered
projecting structures been completed?
(please refer to No. SC8 for cantilevered
projecting structures and No. SC9 for Balcony
and Verandah)
_____
Checklist No. SC 3 P. 2 / 2
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
Checklist No. SC4
Checklist for Fire Safety Provisions
Yes and
No or Not
Reported Applicable
1.
Sufficient Visual Inspection
- Has sufficient visual inspection from a close
Not
distance at representative areas been carried
sufficient
out?
2.
Fire Safety Direction
- Have Fire safety directions under the FS(CP)O or
Not
FS(B)O been received?
received
If “Yes”, have upgrading works been
In
completed?
progress
3.
Mean of Escape
- Are there any defective or missing exit signs?
- Are there any inadequate lighting?
- Are there any defective balustrades and handrails
in staircases and escape routes?
- Are there any door swing obstructing means of
escape?
- Are there any blocked or obstructed means of
escape?
- Are there any defective treads?
- Apart from the above defects, are there any other
defects observed?
Brief Description :_________________
4.
Means of Access for Fire Fighting and Rescue
- Is there any blocked means of access to building,
particularly along rear lane?
- Is there any blocked or obstructed means of
access within building such as access to the
fireman’s lift lobby on G/F?
- Is there any dilapidated emergency vehicular
access?
Details refer
to the report
at Page No.
Checklist No. SC 4 P. 1 / 2
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
- Are there any defects in the integrity of the
fireman’s lift lobby, such as any unauthorised
opening in the enclosure wall, insufficient
ventilation or obstruction to the fireman’s lift?
- Apart from the above defects, are there any other
defects observed?
Brief Description :_________________
5.
Fire Resisting Construction
- Are there any defective or dilapidated materials
resulting in inadequate fire resisting construction?
- Are there any ventilation ducts or other building
services passing through compartment walls or
floors breaching the requirements of fire resisting
construction?
- Are there any broken hinges or glass panels in
fire doors?
- Are there any defective or non-provision of self-
closing mechanism in fire doors?
- Are there any broken or dilapidated fire doors or
fire resisting glazing?
- Is there any inadequate fire resistance of fire door
or glazing?
- Are there any non-emergency services such as
electric wires, cables and meters in the escape
staircases and lobbies, without adequate fire
protection?
- Are there any damaged staircase enclosure such
as walls, windows and doors including those for
the protected lobby?
- Is there any obstruction to fire dampers or fire
shutters for compartmentation?
- Is there any defective or blocked staircase top
vents?
- Apart from the above defects, are there any other
defects observed?
Brief Description :_________________
Yes and
No or Not
Reported Applicable
Details refer
to the report
at Page No.
Checklist No. SC 4 P. 2 / 2
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
Checklist No. SC5
Checklist for Drainage System
Yes
No or Not
and Applicable
Reported
1.
Sufficient Visual Inspection on Building Drainage System
- Has sufficient visual inspection from a close
Not
distance at representative areas of the drainage
sufficient.
However,
pipe been carried out?
more
information
will be/ have
been obtained
in item (2) to
support the
observation
- For any common drainage pipes inside private
No
premises, has sufficient inspection from a close
common
drainage
distance of the drainage pipes with minimum
pipes inside
every 3 floor been carried out?
private
premises
2.
If item 1 above could not be met:
- Would re-inspection be carried out at repair
stage?
- Have any other tests been carried out?
(e.g. CCTV)
- Any recent records of drainage pipes
conditions?
3.
Inspection on Underground Drainage System
- Has CCTV been carried out?
- Any recent records of underground drainage
conditions?
- Have any other methods been carried out to
inspect the underground drainage?
4.
Defects observed
- Is there any visible leakage or potential leakage
such as rusty support, dislocation of pipe joints?
- Are there any blockages or overflow from the
drainage system?
Details refer
to the report
at Page No.
Checklist No. SC 5 P. 1 / 2
_____
_____
_____
_____
- Are there any discharge or untreated trade
effluent, including hot water, into the drainage
system or to external parts of the building or
open area?
- Is there any misconnection to the public
drainage systems?
(e.g. Discharge of foul or waste water to the
surface water drainage system or external parts
of the building or open areas, or discharge of
surface water to the foul water system)
- Are there any misconnected drain pipes
affecting sanitary or hygienic condition of the
building?
- Apart from the above defects, are there any
other defects observed?
Examples:
a. Corrosion, leakage, deformation,
displacement, damage and blockage of drain
pipes and traps;
b. Corrosion, loosening or breaking of metal
brackets;
c. Damage or blockage of manhole/septic tank;
d. Broken of surface channel, gullies and catch
pits;
e. Missing drain pipes or grating at the top of
ventilation pipes; and
f. Deterioration or missing of mica flap in the
fresh air inlet.
Yes
No or Not
and Applicable
Reported
Details refer
to the report
at Page No.
Checklist No. SC 5 P. 2 / 2
_____
_____
Checklist No. SC6
Checklist for
Unauthorized Building Works(UBW)/Change in Use
1.
UBW identified:
- Are there any unauthorised structures in the
common parts and on roof top, flat roof, yard,
lane or street?
- Are there any unauthorised projections and
signboards erected on the exterior of the
building?
- Are there any unauthorised alterations or
additions affecting fire safety?
Examples:
Doors, gates or roller shutters obstructing
escape routes;
Unprotected openings at enclosure walls of
exit routes or compartment walls, floors and
ceilings;
Structures on refuge floors;
Door openings from cocklofts to exit
staircases in single-staircase buildings;
Alteration to escape routes, protected lobbies
or fire resisting construction resulting in
deficiencies in fire safety;
Structures on main or flat roofs resulting in
inadequate means of escape;
Structures on main or flat roofs resulting in
deficiency in fire resisting construction such
as inadequate fire separation between the
structures concerned and the main or flat roof
designated as a refuge floor;
Change in provision of fireman’s lift or lobby
of the fire fighting and rescue stairway; and
Removal of fire doors, fire shutters or other
fire resisting construction.
- Are there any unauthorised alterations or
additions of structural system?
- Are there any unauthorised alterations or
additions of drainage system?
Yes
No or Not
Details refer
and
Reported
Applicable
to the report
at Page No.
_____
_____
_____
- Is there any unauthorised alteration of external
_____
walls or parapets?
Checklist No. SC 6 P. 1 / 2
- Is there any unauthorised removal or alteration
of provisions for barrier free access for people
with disability?
- Are there any alterations or additions to
balconies, canopies or other approved
projections of the building?
- Are there any signs of suspected subdivision of
flats?
Examples:
Presence of many flat door openings, door
bells, electricity meters or drain pipe
connections.
- Is there any unauthorized change in use
affecting structural or fire safety?
Examples:
Storage of hazardous materials;
Exceeding the approved capacity in terms of
means of escape and/or imposed load of a
room or storey.
2.
Assessment to the UBW/Change in Use
- Does the UBW/Change in Use constitute
obvious hazard or danger to life or property?
- Is the parent structure overloaded and shows
serious signs of distress?
- Do the UBWs constitute serious environmental
nuisance or health hazard?
- Are there any UBW under construction during
inspection?
Details refer
Yes
No or Not
to the report
and Applicable
at Page No.
Reported
_____
_____
_____
_____
No
_____
No
_____
No
_____
No
_____
Checklist No. SC 6 P. 2 / 2
_____
_____
_____
_____
_____
_____
Checklist No. SC7
Checklist for Curtain Wall
1.
Sufficient Visual Inspection
- Has sufficient visual inspection from a close
distance at representative areas been carried
out?
- If obvious defects were found on the
corresponding external surfaces, has
sufficient visual inspection of the curtain
wall from internal areas been carried out?
2.
If item 1 above could not be met:
- Would re-inspection be carried out at repair
stage?
- Have any other tests been carried out?
- Any recent records of conditions?
3.
Defects observed
- Are there any defects observed?
Examples:
Cracked, loose, broken or missing glass
panes;
Corroded or loose fixings;
Defective sealants;
Defective fire stop;
Defective locking devices bar hinges;
Signs of water leakage behind curtain
wall.
Yes
No or Not
and Applicable
Reported
Not
sufficient.
However, more
information
will be/ have
been obtained
in item (2) to
support the
observation
Not
sufficient.
However, more
information
will be/ have
been obtained
in item (2) to
support the
observation
Details refer
to the
report at
Page No.
Checklist No. SC 7 P. 1 / 1
_____
Checklist No. SC8
Checklist for Cantilevered Projecting Structures
1.
Type of Cantilevered Projecting Structures
Canopy / Fins / Features / A/C Platform / Drying Rack / Planter
Box*
(Please refer to Checklist No. SC9 for inspection of
Balcony/Verandah)
2.
Sufficient Visual Inspection
- Has sufficient visual inspection from a close
distance at representative areas been carried
out?
(Cantilevered slab type structure shall be fully
exposed for inspection while other structure
shall be at least 30% exposed for inspection.)
3.
Cantilevered slab canopy projecting over street
(Not applicable for other type of projections)
- Has the concrete cover at suitable locations at
the root of the canopy immediately adjoining
the parent structure been opened up with site
measurement taken for below?
i. Screeding thickness
ii. Cover of the reinforcement
iii. Size of the reinforcement
- Have information from building records as
below been verified on site?
i. Span
ii. Thickness of slab
4.
RC Elements
- Are there any cracks or sign of distress along
the support of cantilevered slab? (item no.
in
the Diagram 1)
Details
Yes
No or
refer to the
and Not
report at
Reported Applicable
Page No.
Not
_____
sufficient
_____
_____
Checklist No. SC 8 P. 1 / 3
- Apart from the above defects, are there any
other defects observed? (item no.
and
in
the Diagram 1)
Examples:
a. Defective tiles/rendering;
b. Cracks or spalling;
c. Delamination;
d. Exposed reinforcement;
e. Voids and honeycombing; and
f. Deformation or displacement.
5.
Metal Elements
- Is there any rust or corrosion observed?
- Apart from the above defects, are there any
other defects observed?
Examples:
a. Dilapidation;
b. Loose or defective fixing; and
c. Deformation or displacement.
6.
Surface Drainage (item no. in the Diagram 1)
- Are there any leaking or broken drainage pipe?
- Are there any defects observed in the supporting
frame?
- Are there any blockages observed?
- Apart from the above defects, are there any
other defects observed?
Brief Description :_________________
7.
Unauthorised Building Works
- Are there any unauthorised building works?
Details: thickened finishes/
Change in use/ or
____________________*
- Have the building works found deviated from
the building records constituted obvious hazard
or danger?
Details
Yes
No or
refer to the
and Not
report at
Reported Applicable
Page No.
_____
_____
_____
_____
_____
_____
_____
_____
_____
Checklist No. SC 8 P. 2 / 3
- Have the deviations caused the structure
overloaded or seriously impaired the safety of
the structure?
8.
Assessment
- Is there any overloading to the cantilevered
projecting structure observed?
- Is the cantilevered projecting structure safe?
- Is further testing or detailed investigation
recommended? (Reference shall be made to
Section 4.3.1 of the Code)
* Delete where appropriate
Details
Yes
No or
refer to the
and Not
report at
Reported Applicable
Page No.
_____
No
_____
No
_____
No
_____
Canopy / Fins / Features / A/C Platform
Diagram 1 : Inspection Items for Cantilevered Projecting Structures
Soffit of the Structure Surface of the Structure
Support of the Structure Drainage System
Checklist No. SC 8 P. 3 / 3
Checklist No. SC9
Checklist for Balcony/Verandah
1.
Sufficient Visual Inspection
- Has sufficient visual inspection from a close
distance at representative areas been carried
out?
(Cantilevered slab type structure shall be fully
exposed for inspection while other structure
shall be at least 30% exposed for inspection.)
2.
RC Elements
- Are there any cracks or sign of distress along
the support of cantilevered slab? (item
in
Diagram 1)
- Apart from the above defects, are there any
other defects observed? (items
,
and
in Diagram 1)
Examples:
a. Defective tiles/rendering;
b. Cracks and spalling;
c. Delamination;
d. Exposed reinforcement;
e. Voids and honeycombing; and
f. Deformation or displacement.
3.
Metal Railing / Glass balustrade (items &
in Diagram 1)
- Is there any rust or corrosion observed?
- Apart from the above defects, are there any
other defects observed?
Examples:
a. Dilapidation;
b. Loose or defective fixing;
c. Deformation or displacement;
d. Cracked, loose, broken or missing glass
panels; and
e. Defective sealants.
Details
Yes
No or Not
refer to the
and Applicable
report at
Reported
Page No.
Not sufficient
_____
_____
_____
_____
_____
Checklist No. SC 9 P. 1 / 3
4.
Surface Drainage (item in Diagram 1)
- Are there any leaking or broken drainage
pipe?
- Are there any defects observed in the
supporting frame?
- Are there any blockages observed?
- Apart from the above defects, are there any
other defects observed?
Brief Description :_________________
5.
Unauthorized Building Works
- Are there any unauthorised building works?
Details: change of parapet/
enclosure with wall/
thickened finishes (item in
Diagram 1)
Change in use/ or
____________________*
- Have the building works found deviated from
the building records constituted obvious
hazard or danger?
- Have the deviations caused the structure
overloaded or seriously impaired the safety of
the structure?
6.
Assessment
- Is there any overloading to the
balcony/verandah observed?
- Is the balcony/verandah safe?
- Is further testing or detailed investigation
recommended? (Reference shall be made
Section 4.3.1 of the Code)
* Delete where appropriate
Details
Yes
No or Not
refer to the
and Applicable
report at
Reported
Page No.
_____
_____
_____
_____
No
_____
discrepancies
were observed
Not applicable
_____
Not applicable
_____
No
_____
No
_____
No
_____
Checklist No. SC 9 P. 2 / 3
Diagram 1: Inspection Items for Balcony (also applies to Verandah)
Ceiling of the Balcony/Verandah Drainage System Thickened finishes
Support of the Balcony/Verandah RC Parapet (internal surface) Glass balustrade
Surface of the Balcony/Verandah Metal Railing
(4/2018)
Checklist No. SC 9 P. 3 / 3
Appendix B
(PNBI-7)
Sample Inspection Report
Mandatory Building Inspection Scheme
Inspection Report on Projections (Balcony / Verandah)
Flat 8, 9/F, Block A, Square Tower, Wan Chai
Statutory Notice No. :
UMB/50C199/1401-999/0055
Name of RI:
Lau YIM
Certificate of registration number:
Date of expiry of registration:
Signature of RI:
Date of Report:
RI (E) 555/1232
7.7.2017
My Signature
16.2.2015
Cover Page
MBIS Inspection Report for Projections
Statutory Notice No: UMB/50C199/1401-999/0055
1. Summary
1.1 I carried out the prescribed inspection personally as required by
the above statutory notice for the projections including a
balcony
Note1
on 10 February 2015.
Note 1: List of possible items: balcony / verandah
1.2 In my opinion the above premises has been rendered dangerous
or is liable to become dangerous, and a prescribed repair is
required to be carried out to render the building safe / in my
opinion the above premises is safe and no prescribed repair is
required.
1.3 There are unauthorised building works (UBWs) in the above
premises, however, in my opinion, the UBWs do not constitute
any obvious hazard or danger. I have informed the owner and
recommend him/her to consider rectifying and removing the
UBWs.
2. Building Information
Building Information
(Details)
Date of Occupation Permit:
3 April 1960
Approved usage:
*domestic/commercial/industrial use
Current usage:
The balcony has been enclosed with
windows and become part of the
kitchen
Structural arrangement of the
projection:
It is reinforced concrete
cantilevered slab structure/
: Denotes possible items
1 / 9
MBIS Inspection Report for Projections
Statutory Notice No: UMB/50C199/1401-999/0055
reinforced concrete cantilevered
beam and slab structure/ reinforced
concrete column and beam structure
Salient information of previous
inspection and repair:
The owner has no record of any
repair since he has owned the
premises 10 years ago / Spalling
occurred about 3 years ago and
repaired accordingly.
3. Reference Documents
I have reviewed the following documents:
(a) Approved building, structural, drainage, alteration and addition
plans:
Drawing Title
Drawing No.
Date of Approval
GBP for 9
th
Floor
GBP 9/1000
3 Sept 1959
RC Detail for 9
th
Floor
RC 6/101
29 Dec 1959
(b) Plans and details of minor works carried out under the simplified
requirements:
Minor Works
Minor
Description
Date of
No. Works Items Completion
MW131103415
1.6
Alteration of
protective barrier
7 Jul 2013
: Denotes possible items
2 / 9
MBIS Inspection Report for Projections
Statutory Notice No: UMB/50C199/1401-999/0055
4. Method Statement for Building Inspection
I have used the following methods and carry out the following tests to
inspect the projections of the premises:
Inspection Method
Scope of Inspection
Visual Inspection
Whole place including ceiling, floor slab,
inside and outside of
metal railing, inside of
RC parapet.
Hammer Tapping
Whole place including ceiling, floor slab,
inside of RC parapet.
5. Inspection Results
I have personally carried out inspection for the projections of the above-
mentioned premises, including checking the structure and related
drainage pipe and outlet of the projections. Inspection Form is provided
in Section 9.1.
The cantilevered span of the balcony is about 1100 mm and the
structural depth of the concrete slab is about 150 mm, which conform to
the approved drawings. The thickness of finishes on top of the slab is
30mm. The weight of finishes should not cause any overloading.
No ponding, seepage, cracks or other defects were noted.
No cracks were found along the support of the balcony.
I have found the following defects: (Please refer to Section 9.2 for the
photos and details)
(a) Corroded metal railings were noted.
(b) Spalling at the ceiling of balcony was noted.
: Denotes possible items
3 / 9
MBIS Inspection Report for Projections
Statutory Notice No: UMB/50C199/1401-999/0055
Other Examples:
The floor drain at the balcony was blocked.
Spalling on the internal surface of parapet.
6. Record of UBWs identified
I have not found any UBWs in the projection(s).
I have identified the following UBWs:
(a) Protective barrier has been altered/floor screed is thickened/
additional partition walls are installed/external walls have been
added/external walls have been altered, that is/are different from
the approved plans.
In my opinion, the UBWs do not constitute any obvious hazard or
danger. I have informed the owner and recommend the owner to
consider rectifying and removing the UBWs.
7. Assessment of Conditions
My assessment of the conditions of the projections is given below:
Based on the inspection results and in my opinion, the projections of
this premises are liable to become dangerous and prescribed repair is
required to be carried out to render the building safe. The repair
proposal is provided in Section 8.
In my opinion the projections of this premises are safe. No
prescribed repair is required.
I have copied this report to the owner and explained the content of it to
the owner.
: Denotes possible items
4 / 9
MBIS Inspection Report for Projections
Statutory Notice No: UMB/50C199/1401-999/0055
8. Proposal of the Prescribed Repair
The owner should appoint a registered contractor to carry out the
following prescribed repair works and the works should be supervised
by a Registered Inspector.
Item of Prescribed
Repair Works
Minor Works
Items
(If Applicable)
Proposed Methods,
Materials,
Specifications and
Proposal of Proof
Tests
Repair of protective
barrier
2.5
To be carried out in
accordance with
Section 5.3.6 of the
Code of Practice for the
Mandatory Building
Inspection Scheme and
the Mandatory Window
Inspection Scheme (the
Code).
Patch repair for
concrete
2.17
To be carried out in
accordance with
Appendix VI- A(I) and
B of the Code.
: Denotes possible items
5 / 9
MBIS Inspection Report for Projections
Statutory Notice No: UMB/50C199/1401-999/0055
9. Records of Defects and Deficiencies
9.1 Inspection form
Building Address: Flat 8, 9/F, Block A, Square Tower, Wan Chai Report Page No.: 7
MBIS Notice No:
Name of RI:
Date of Inspection:
UMB/50C199/1401-999/0055
Lau YIM
10 February 2015
Time
Afternoon
Weather Condition:
Fine
Inspection of Projections
Element Type
Location Assessment,
Description and
Follow-up Actions
Photo No.
Remarks
Condition of
Defects
Prescribed
Repair
Required?
Other
Slab
Floor slab of
balcony
No defects or
deficiencies
No
001
Slab
Ceiling of
balcony
Cracks (width
about
0.5mm) and
spalling were
observed
Yes
002
Protective
barrier
At the balcony
Corroded metal
railings were
observed
Yes
003
Drainage
System
At the balcony
No defects or
deficiencies
No
004
UBWs:
Type
Location Description
Any
obvious hazard
or danger ?
Photo No.
Remarks
Protective
Barrier
At the balcony
The protective
barrier was altered
from metal
balustrade to glass
balustrade
No
005
Owner was
informed and
recommended to
consider rectifying
and removing the
UBWs
6 / 9
MBIS Inspection Report for Projections
Statutory Notice No: UMB/50C199/1401-999/0055
9.2 Annotated photos and marked up plans for building defects and deficiencies
Location Plan
Floor Plan
Floor Plan
Elevation
Elevation
7 / 9
MBIS Inspection Report for Projections
Statutory Notice No: UMB/50C199/1401-999/0055
Photos Descriptions
Photo 1
Photo
No defects or
deficiencies.
Photo 2
Photo
Cracks (width about
0.5mmand spalling as
shown in the red circles
were observed.
8 / 9
MBIS Inspection Report for Projections
Statutory Notice No: UMB/50C199/1401-999/0055
Photo 3
Photo
Corroded metal railings
were noted.
Photo 4
Photo
No defects or
deficiencies.
Photo 5
Photo
The protective barrier is
dif
ferent from the
approved plans.
(4/2018)
9 / 9
Appendix C
(PNBI-7)
Sample Inspection Report
Mandatory Building Inspection Scheme
Inspection Report on Common Parts and
External Walls
Building name:
Building address:
Lot number:
MBIS notice number:
Square Tower
Block A, Square Tower, Wan Chai
I.L. 530
UMB/5OC199/1401-999/0001
RI signature
Name of RI:
Registration number:
Date of expiry of:
of registration
Date of report:
My Signature
Lau YIM
RI (E) 555/132
7.7.2019
16.2.2017
Cover page
(Rev. 8/2020)
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
1. Summary
1.1 I carried out the prescribed inspection personally as required by the above
statutory notice for the common parts / external walls of the subject building
on 10 February 2017. *I also engaged representatives (particulars,
qualifications and experience at Annex A) to assist me in ascertaining the
extent of the defects.
1.2 In my opinion, *the above building has been rendered dangerous or is liable
to become dangerous, and a prescribed repair is required to be carried out to
render the building safe/the above building is safe and no prescribed repair
is required.
1.3 *There are unauthorised building works (UBWs) in the above building.
However, in my opinion, the UBWs do not constitute any obvious hazard or
danger. I have informed the IO/owner(s) and advised him/her/them to
consider removing the UBWs.
2. Building Information
Building Information No. of storeys:
No. of units:
Latest set of approved floor plans at
Annex B
Date of Occupation Permit: 3 April 1960
Approved usage: *domestic/commercial/industrial use
Current usage: Same as above
Principal construction materials: External walls: reinforced concrete with
mosaic tile/rendering finish
Structural frame: reinforced concrete
floors, beams and columns
Salient information of previous
inspection and repair:
No record of repair is available
Name of Incorporated Owners: The Incorporated Owners of Square
Tower
Name of management company: Square Tower Property Management
Limited
*: Denotes possible items
1
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
3. Reference Documents
I have reviewed the following documents:
(a) Latest sets of approved building, structural, drainage, alteration and
addition plans:
Drawing No.
A01 to A20
S01 to S30
D01 to D20
Drawing Title
Building plans
Structural plans
Drainage plans
Date of Approval
3.9.1959
29.12.1959
30.3.1960
(b) Plans and details
requirements:
of minor works carried out under the simplified
Minor Works No. Minor
Works
items
Description Date of
Completion
MWXXXXXXXXX 1.14 Erection of supporting
structure for a radio
base station for
telecommunications
services in the form of
an equipment cabinet
on roof of the building
7.7.2014
(c) Plans and documents submitted to the BA under section 39C of the BO:
Validation
Scheme
Submission No.
Description Date of
Submission
to the BA
XXXXXXXX Unauthorised metal supporting
frame for an air-conditioning
unit on external wall at Flat A,
5/F
2.6.2011
(d) Fire Safety Directions (FSDn) served by the BD on the building owners:
*: Denotes possible items
2
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
FSDn No. Date of FSDn
BD/FS/TCB1/00001/14 16.9.2016
(e) Other relevant documents:
Documents Description
N/A N/A
4. Method Statement for Building Inspection
I have inspected the various types of building elements by the following methods
and tests:
Building elements Method/test
External elements and other
physical elements
*Visual inspection and/or hammer-tapping,
infrared thermography or other feasible
means
(For clarity, the method adopted for different
elements may be separately listed.)
Structural elements
*Cantilevered Slab Canopy
(CSC) facing Tai Yuen Street
*Visual inspection and or hammer-tapping,
cover meter survey, crack width measurement
or other feasible means
Investigation has been conducted in
accordance with the inspection and
assessment requirements as stated in the
amendment in March 2017 to Part B of
Section 3.4.2 of the Code of Practice for
Mandatory Building Inspection Scheme and
Mandatory Window Inspection Scheme
2012 (CoP)
Fire safety elements Visual inspection
Drainage system Above-ground: visual inspection
*Underground: visual inspection and/or
CCTV survey
*: Denotes possible items
3
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
UBWs Visual inspection
5. Inspection Results
(a) RIs representative engaged
in inspection (if any):
See Annex A for the particulars,
qualifications and experience of the
representative
(b) Photos of each elevation: See Annex C
(c) Daily inspection records
and summary of all
building defects and
deficiencies or inspection
results:
See Annex D – summary table
See Annex E – annotated photo record
See Annex F – mark-up plans
(d) Record of defects: Extending from common parts or external
walls to individual flats (Sections 3.3.3 and
3.4.3 of CoP refer): Nil
Flat entrance door of private premises
(Section 3.5.3 of CoP refers): Flat A, 1/F
Results of all tests carried out during the
inspection stage: Testing carried out during
Detailed Investigation for CSC refer to
Annex H
(e) FSDn The upgrading works required by the FSDn
have not yet been completed
(f) Record of all UBWs
identified (Section 3.7.3 of
CoP refers)
See Annex D – summary table
See Annex E – annotated photo record
See Annex F – mark-up plans
(g) Report on signs of
suspected subdivision of
flats (Section 3.7.1 of CoP
refers)
*Signs of suspected subdivision of flats
were noted at Flat A, 3/F, with 2 individual
entrance doors to the flat (see photo F004 in
Annex E)
6. Assessment
My assessment of the conditions of the building is given below:
* Based on the findings of the building inspection and detailed investigation, in
*: Denotes possible items
4
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
my opinion, the building is liable to become dangerous and prescribed repair is
required to be carried out to render the building safe. The repair proposal is
provided in Section 7.
* In my opinion, the building is safe. No prescribed repair is required.
* CCTV survey has been conducted for the underground drainage. Damaged
underground drain pipes identified in the survey should be replaced. Please
refer to the CCTV survey report in Annex G.
* Investigation has been carried out for the CSC facing Tai Yuen street and
assessment has been conducted in accordance with sections 4.3.3 and 4.3.4 of the
CoP to ascertain the safety of the canopy . No remedial work is considered
necessary before the next cycle of inspection. Please refer to the investigation
report and structural assessment in accordance with the requirement of the CoP
in Annex H.
* The conditions of the CSC facing Tai Yuen Street require regular maintenance
for maintaining safety until the next cycle of inspection. The owners have been
advised on the need for regular maintenance of such CSC.
* The UBWs identified in Section 5 item (f) above do not constitute any obvious
hazard or danger. Nevertheless, the owners have been advised to remove such
UBWs.
I have copied this report to the IO/owners and explained the content of it to them.
7. Repair Proposal
IO/owners should appoint a registered contractor to carry out the following
prescribed repair works and the works should be supervised by a Registered
Inspector.
Item of Prescribed
Repair Works
Minor Works
Items (if
applicable)
Proposed Methods, Materials,
Specifications and Proposal of
Proof Tests
Repair for tiles and
rendering
2.34 To be carried out in accordance
with Appendix IV of the CoP.
*: Denotes possible items
5
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Patch repair of concrete 2.17
To be carried out in accordance
with Appendix V-A(I) and B of the
CoP.
Repair of above-ground
drainage
2.30
Defective/misconnected drain
pipes to be rectified in accordance
with the approved drainage plans.
Repair of underground
drainage
1.25 Damaged underground drain pipes
as shown on the CCTV survey
report to be replaced, materials
used to be in accordance with the
approved drainage plans.
Removal of corroded
drying racks
3.30
To be carried out in accordance
with Section 5.3.5 of the CoP.
I am appointed for both building inspection and supervision of building repair
works and I have formed a supervision team to provide supervision on my behalf
in accordance with section 6.4 of the CoP. Particulars, qualifications and
experience of my representatives in the supervision team are given in Annex I.
The owners may also wish to take this opportunity to carry out other
improvement or upgrading works (which are outside the scope of the MBIS
notice) concurrently as detailed below:
(a) *Enclosure of E/M services inside protected corridors/fire staircases as
required under the FSDn by fire resisting enclosures; and
(b) *Replacement of waterproofing system at roof.
*: Denotes possible items
6
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Annex A
Particulars of RIs Representative engaged
in Prescribed Inspection
(Relevant documents to be enclosed under this Annex as appropriate)
7
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Annex B –
Latest Set of Approved Floor Plans
(Relevant documents to be enclosed under this Annex as appropriate)
8
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Annex C –
Photos of Each Elevation
(Relevant photos to be enclosed under this Annex as appropriate)
9
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Annex D –
Summary Tables
10
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Form 1 – External Elements and Other Physical Elements
Building Address: Block A, Square Tower, Wan Chai Report Page No.:
MBIS Notice No.
UMB/5OC199/1401-999/0001
Name of Registered Inspector:
Lau YIM
Date of Inspection: 10.2.2017
Time: 10:00 to 17:00 Weather Condition: Sunny
Inspection of External Elements and Other Physical Elements
Follow-up
Location Actions
Element type
Defect
Type*
Required
Photo No.
Remarks
Floor
Elevation
Internal
Common Parts
Repair
Others
Tiles 2/F North
Elevation
3 E010
Extent of tile
delamination to
be ascertained
at the repair
stage
Metal
gate
G/F South
Elevation
11 E001
Defective hinge
of metal gate to
be replaced
Rendering 3/F
4/F
Ceiling
of stair
1 E018
Other locations
E002E009,
No defects or
E011E017,
deficiencies
E019E021
* Defect Types:
1 Loose or missing tiles and rendering 7 Displacement of cladding panels
2 Cracks 8 Cracked or loose cladding panels
3 Bulging, bowing, separation, delamination, etc. 9 Defective sealing joints
4 Stains 10 Corrosion of fixing anchors or metal frames
5 Deterioration 11 Defective components such as hinges, track,
6 Spalling guide rail and stopper
12 Others (please specify)
11
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Form 3 – Structural Elements
Building Address: Block A, Square Tower, Wan Chai Report Page No.:
MBIS Notice No.
UMB/5OC199/1401-999/0001
Name of Registered Inspector:
Lau YIM
Date of Inspection: 10.2.2017
Time: 10:00 to 17:00 Weather Condition: Sunny
Inspection of Structural Elements
Location Element
Defect
Type*
Follow-
up Actions
Required
Photo No.
Remarks
D1
Repair
Others
1/F Cantilevered
slab canopy
S008
No defects or
deficiencies
(
Open up at 2
locations (Section
3.4.2(A) of CoP
refers))
1/F Cantilevered
beam & slab
type canopy
S009
No defects or
deficiencies
(
Concealed by
false ceiling.
Not less than 30%
of the concealed
area has been
removed (Section
3.4.2(B) of CoP
refers))
Flat A, 3/F Drying racks,
planter box
and window
canopy
2, 3, 4 S010
12
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
4/F
staircase
Beam 3 S005
R/F Slab at 2, 4 S007
staircase
ceiling of
stairhood
Other
S001-S004,
No defects or
locations
S006
deficiencies
Legend: DI Detailed Investigation
* Defect Types:
1 Dampness
2 Rust stains/Corrosion of reinforcement, structural
steel or bolts
3 Cracks
4 Spalling
5 Delamination
6
7
8
9
Exposed reinforcement
Voids and honeycombing
Deformation or displacement
Others (please specify)
13
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Form 4 – Fire Safety Elements
Building Address: Block A, Square Tower, Wan Chai Report Page No.:
MBIS Notice No.
UMB/5OC199/1401-999/0001
Name of Registered Inspector:
Lau YIM
Date of Inspection: 10.2.2017
Time: 10:00 to 17:00 Weather Condition: Sunny
Inspection of Fire Safety Elements
Location Element
Defect
Type*
UBWs
Type**/Un-
authorised
Change in
Use***
Follow-up Actions
Required
Photo No.
Remarks
Repair/
Reinstatement
Others
Flat A,
1/F
door
7
-
F002
3/F
staircase
wall
8
-
F004
5/F
staircase
door
3
F006
Roof
F
F007
Other
F001,
No defects or
locations F003, deficiencies
F005
* Defect Types: ** UBWs Types:
1
Staircase enclosure or protected lobby doors
A
Door openings from cocklofts to exit staircase
removed
B
Unprotected openings in exit staircase or
2
Defective balustrades and handrails in staircases
compartment walls, floors and ceilings
and escape routes
C
Structures on refuge floors
3
Wrong swinging direction of doors
D
Alteration to escape routes
4
Change in provision of firemans lift
E
Doors, gates or roller shutters obstructing escape
5
Blocked access to and within building, or
routes
inadequate emergency vehicular access
F
Inadequate fire resistance of fire door
6
Inadequate fire fighting lift lobby
G
Structures on main or flat roofs resulting in
7
Doors/seals/materials with inadequate fire
inadequate means of escape
resisting construction
H
Change in fire construction materials
8
Openings or building services breaching the
I
Insufficient number of exits
integrity of fire resisting construction
J
Structures blocking exits
9
Defective or missing signs
K
Others (please specify)
10
Inadequate lighting
11
Others (please specify)
***
Unauthorised Change in Use
L
Change in use for storage of hazardous materials
M
Change in use resulting in exceeding the
approved capacity of a room or storey
N
Others (please specify)
14
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Form 5– Drainage System
Building Address: Block A, Square Tower, Wan Chai Report Page No.:
MBIS Notice No.
UMB/5OC199/1401-999/0001
Name of Registered Inspector:
Lau YIM
Date of Inspection: 10.2.2017
Time: 10:00 to 17:00 Weather Condition: Sunny
Inspection of Drainage System
Location Element
Defect
Type*
UBW
Type**
Follow-up
Actions
Required
Photo No.
Remarks
DI
Repair
Others
External
Surface
1
D001
wall facing water pipes
Tai Yuen D007
Street
G/F rear lane
Surface
channel
2
D001
Cracked and broken
corner
Kitchen at
Additional
A
D003
Suspected
2/F, Flat A pipe unauthorised waste
pipe connected to
surface water system
Roof
Surface
D008
No defects or
channel, deficiencies
ventilating
pipes
* Defects
1
Corrosion, leakage, deformation, displacement or
surface damage of pipe
2
Damage of manhole or broken of surface
channel, gullies and catch pits
3
Blockage of pipe, manhole, surface channel,
gullies or catch pits
4
Corrosion, loosening or breaking of metal
brackets
5
Missing grating of ventilating pipe
6
Deterioration of mica flap in fresh air inlet
7
Misconnected common drain affecting sanitary
condition of building or affecting public health
8
Others (please specify)
** Unauthorised drainage works
A
Expedient connection of foul or waste water to
surface water drainage system
B
Discharge of foul or waste water to external of
building or open areas
C
Discharge of untreated trade effluent into drainage
system
D
Discharge of untreated trade effluent to external of
building or open space
E
Other (please specify)
15
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Form 6 – UBW
Building Address: Block A, Square Tower, Wan Chai Report Page No.:
MBIS Notice No.
UMB/5OC199/1401-999/0001
Name of Registered Inspector:
Lau YIM
Date of Inspection: 10.2.2017
Time: 10:00 to 17:00 Weather Condition: Sunny
UBW
Location Floor Flat
Details of UBWs
Condition
of
UBWs*
Remarks
Types
Photo No
Block A
G/F
A
SF(B/H)
U001
F
Owner was advised to
remove the UBWs
Ditto
1/F
B
FRS
U002
F
Owner was advised to
remove the UBWs
Ditto
4/F
A
DR
U003
F
Owner was advised to
remove the UBWs
Ditto
5/F
B
FR
U004
P
Owner was advised to
remove the UBWs
Ditto
R/F
-
O
U005
G
Prefabricated Structure,
owner was advised to
remove the UBWs
* Good (G), Fair (F) or Poor (P)
Types of UBWs:
A/C
-
A/C(e): Air conditioner rack projecting more
DR
-
Dilapidated drying rack
than 600mm from external wall
FR
Flower rack
-
A/C(a): Abandoned or dilapidated air conditioner
MF
-
Abandoned or dilapidated metal frame
metal frame
MC
-
Metal cage
SP
-
Projecting structures of solid construction
FRS
-
Flat roof structure
SF
-
SF(S/E): Shop front extension projecting more
YS
-
Yard structure
than 300mm from external wall
RTS
-
Roof top structure
-
SF(B/H): Bulkhead of lightweight shop front
UU
-
UBW fixed on another UBW, or
decoration projecting more than 600mm from
2-storey UBW
external wall
UA
-
Unauthorised alteration of structural
PC
-
PC(e): Corrugated metal sheet canopy projecting
elements
more than 500mm from external wall
CSB
-
Structures on or attached to approved
-
PC(a): Abandoned or dilapidated corrugated
cantilevered slab balconies
metal sheet canopy
AW
-
Unauthorised alteration of external
-
PC(r): Retractable canopy projecting more than
walls or parapets
2000mm from external wall
DF
-
Removal or alteration of provisions for
-
PC(s): Canopies of solid construction
barrier free access
O
-
Others (please specified)
16
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Annex E –
Annotated Photo Record
17
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo E001
Photo
Defective hinge of
metal gate at G/F to be
replaced
Photo E002
Photo
No defects or
deficiencies
* * *
* * *
* * *
* * *
18
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
* * *
* * *
* * *
* * *
Photo No. Descriptions
Photo E009
Photo
No defects or
deficiencies
Photo E010
Photo
Bulging of tiles at 2/F
19
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo E011
No defects or
deficiencies
Photo
* * *
* * *
* * *
* * *
Photo E017
No defects or
deficiencies
Photo
20
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No.
Descriptions
Photo E018
Photo
Loose rendering at 3/F
– 4/F
Photo E019
Photo
No defects or
deficiencies
* * *
* * *
Photo E021
No defects or
deficiencies
Photo
21
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo S001
No defects or
deficiencies
Photo
* * *
* * *
* * *
* * *
Photo S004
No defects or
deficiencies
Photo
22
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No.
Descriptions
Photo S005
Photo
Crack (width about
1mm) was observed at
4/F staircase
Photo S006
Photo
No defects or
deficiencies
Photo S007
Photo
Spalling and
reinforcement
corrosion (as shown in
the red circles) were
observed at R/F
staircase
23
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo S008
Photo
No defects or
deficiencies
Photo S009
Photo
No defects or
deficiencies
Photo S010
Photo
Corroded drying racks
and c
racks and
spalling at planter box
and window canopy at
Flat A, 3/F
24
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo F001
Photo
No defects or
deficiencies
Photo F002
Photo
Door with inadequate
FRC at Flat A, 1/F
Photo F003
Photo
No defects or
deficiencies
25
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo F004
Photo
Opening formed on
the wall of 3/F
staircase
Photo F005
Photo
No defects or
deficiencies
Photo F006
Photo
Wrong swing
direction of door at
5/F staircase
26
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo F007
Photo
Inadequate fire
resistance of fire door
at R/F
27
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo D001
Photo
Cracked and broken
surface channel at G/F
Defective surface
water pipes
Photo D002
Photo
Defective surface
water pipes
Photo D003
Photo
Defective surface
water pipes
Suspected
unauthorised waste
pipe connected to
surface water system
at 2/F
28
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo D004
Defective surface
water pipes
Photo
Photo D005
Defective surface
water pipes
Photo
Photo D006
Defective surface
water pipes
Photo
29
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo D007
Defective surface
water pipes
Photo
Photo D008
No defects or
deficiencies
Photo
30
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo U001
Photo
Bulkhead of
lightweight shop front
decoration projecting
more than 600mm
from external wall of
Flat A, G/F
Photo U002
Photo
Flat roof structure at
Flat B, 1/F
Photo U003
Photo
Dilapidated drying
rack at Flat A, 4/F
31
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Photo No. Descriptions
Photo U004
Photo
Flower rack at Flat B,
5/F
Photo U005
Photo
Prefabricated structure
at R/F
32
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Annex F –
Mark-up Plans
33
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Mark-up Plans
North Elevation
South Elevation
34
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Mark-up Plans
G/F Plan
1/F Plan
2/F Plan
35
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Mark-up Plans
3/F Plan
4/F Plan
5/F Plan
36
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Mark-up Plans
Roof Plan
37
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Annex G –
CCTV Survey Report for Underground
Drainage
(Relevant documents to be enclosed under this Annex as appropriate)
38
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Annex H –
Investigation Report and Structural
Assessment for CSC facing Tai Yuen Street
(Relevant documents to be enclosed under this Annex as appropriate)
39
MBIS Inspection Report
Statutory Notice No: UMB/5OC199/1401-999/0001
Annex I –
Particulars of RIs Representatives in
Supervision Team for Prescribed Repair
(Relevant documents to be enclosed under this Annex as appropriate)
40