Pre-Project Safety Assessment Form
Pre-Project Hazard Assessment
Project:
Project Manager (PM):
Building:
General Contractor (GC):
Contractor responsible to communicate all hazard information to all workers at all sub-contract tiers.
No project work shall start without each of the permit items in hand.
Permitting
Building permit (attach to notes)
Owner hazardous materials (hazmat) survey
(attach to notes)
DEP demolition permit (AQ06) (attach to notes)
Cambridge/Boston Fire Department (C/BFD)
demolition permit (attach to notes)
Fall Protection
Ladders
Scaffolding
Roof Work
Other (add details to notes)
Notes:
Revision Date: 05/26/2022 Page 2 of 5
Copyright © 2022 The President and Fellows of Harvard College
To request this document in an alternative format contact [email protected]
Hot Work
Permits - C/BFD Hot Work letter Fire Watch (C/BFD/Contractor) (as required by C/BFD,
contractor minimum)
Notes:
Hazardous Materials
Hazardous Materials Identified? Yes No
Check all that apply:
Asbestos
Lead
Presumed-PCBs
Universal Waste
Soil
Laboratory space clean (chemical/radiation)
Report any new findings to Project Manager and EH&S
Notes:
Revision Date: 05/26/2022 Page 3 of 5
Copyright © 2022 The President and Fellows of Harvard College
To request this document in an alternative format contact [email protected]
Cranes
Fill out/receive inspection reports, etc.
Other: Personal Lifts
Police Detail (C/BPD/HUPD)
C/BPD by contractor, HUPD by E&C
Notes:
Housekeeping
Dust Control HEPA Filters
Mopping
Lab Sink Protection
Fans
Noise Control Odor Control
Trash Removal/Pest
Mitigation
Notes:
Revision Date: 05/26/2022 Page 4 of 5
Copyright © 2022 The President and Fellows of Harvard College
To request this document in an alternative format contact [email protected]
Electrical Safety
Lockout Tagout
GFCI
Temp Lighting
Cord Caps
No Live Work
Notes:
Other
Fire Alarm Shutdowns
Other Shutdowns
Confined Spaces (add
details to notes)
Excavation Safety
Proper Penetration Sealing
Sprinkler Shutdowns
Personal Protective
Equipment (PPE) required
Structural Modification (add
details to notes/PE review)
Injury/Incident Notification
Other (add details to notes)
Notes:
Revision Date: 05/26/2022 Page 5 of 5
Copyright © 2022 The President and Fellows of Harvard College
To request this document in an alternative format contact [email protected]
Pre-Project Review Meeting Attendees and Distribution
Meeting Date:
Name
Signature
Date
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Please circle attendee number to identify Competent Person.
Hazard Note should include reference to hazard specific Competent Person.
Contractor to manage ongoing safety communication as project conditions develop or change.