Information package for obtaining a building permit
To apply for a building permit, you must be a licensed contractor or the legal property
owner. (Commercial permits may be obtained by an owner if the job does not exceed
$75,000 and property is an individuals name)
Electrical, Mechanical, Plumbing and the Roofing subcontractors must be listed at the
time of application. Contractors/subcontractors must be registered with the Building
Department. The permit application must be signed by the licensed contractor
(instructions can be found on our website)
Powers of Attorney are NOT accepted for the permit application.
If you apply as an owner/builder, the building must be for your own use and occupancy.
It may not be for sale or lease. If you sell or lease the building you have built as an
owner builder within (1) one year after construction is completed, the law will presume
that you have built it for sale or lease, which is a violation of Florida State Statute
489.103 (7).
It is the owner/builders responsibility to make sure the employees working for them
have the required licenses from the state and/or county municipal licensing ordinances.
Any person working on the building who is not licensed must work under the
owner/builders direct supervision and must be employed by them. The owner/builder
must provide workers compensation as prescribed by Florida law as well as comply
with the IRS requirements concerning F.I.CA. and withholding taxes.
You may not hire an unlicensed contractor to perform the work.
Homeowners who hire unlicensed contractors face several potentially costly penalties.
The Department of Business and Professional Regulation can issue an order to stop
construction and can levy a five-thousand dollar ($5,000.00) fine for aiding and abetting
unlicensed contractors.
2
City of Palm Coast Important Phone Numbers
Area Code 386
Community Development Department 986-3736
(land development, planning, zoning questions, plats, general property questions)
Building Division 986-3780
(general permitting, plan review and inspections including fire)
Inspection Request Line 986-4747
Zoning Division 986-3751
(setbacks, aesthetic requirements, landscaping)
Construction Management and Engineering 986-3794
(commercial development, right of way, driveways, drainage, roadways)
Code Enforcement 986-3764
(enforcement of ordinances, tree removal, wildfire mitigation, animal control, NOT building codes,)
Business Tax Receipt 986-3766
St Johns River Water Management District 329-4874
Compliance support@sjrmd.com
(SJRWMD encourages you to contact them
prior to any clearing of your property)
************************************************
In addition to the requirements of a permit, there may be
additional restrictions applicable to this property that may be
found in the public records of this county, (including covenants
and restrictions; there may be additional permits required from
other governmental entities such as water management districts,
state agencies or federal agencies.
************************************************
3
Table of Contents for Requirements
.
Single family/Duplex Page 4
Green Build Single Family / Duplex Page 5
Additions/Renovations
Including screen enclosures Page 6
Screen Enclosure/Aluminum Page 7
Windows/Doors /Garage doors
Electric/Mechanical/Plumbing
Demolition Page 7
Pools, Spas and Solar Pages 9 & 10
Fence/Walls Page 11
Docks/Boathouse/Boatlifts Page 12
Seawall Page 13
Beautification Right Of Way Page 14
Deck Page 15
Patio / Slab / Pavers Page 16
Shed/Accessory structure Page 17
Signs Page 18
Irrigation Page 19
Roofing Page 20
Hurricane Shutters Page 21
Driveway Page 22
Generator Page 23
Gas Propane/piping Page 24
Fire Permits Page 25
Telecommunication towers Page 26
Commercial Pages 27 & 28
Lot clearing/ re-grading Page 29 & 30
When a survey is required:
The foundation survey must provide indicate setbacks and finished floor elevation.
The final survey must provide setbacks, finished floor elevations, and topographic information.
4
Single family Residence / Duplex (see next page for green building)
Permit application signed by the licensed
contractor if a contractor is hired.
Construction Drawings - One set of signed and
sealed construction drawings. (Include truss
package, layout and fastening schedule)
Product Approval Spec Sheet (detail/installation
sheets to be in field at time of inspections)
Color/Material information - Provide colors of all
architectural features on elevation plans or on a
separate attached paper, complete with manufacturer
name and color description (including, but not
limited to roof, exterior wall, trim, door, garage,
brick, quoins, stone/rock, decorative shutters).
Energy Calculations - One set of energy
calculations.
Water and Sewer Receipt with stamped approved
site plan attached. (prior approval from utility)
Roofing worksheet
Warranty Deed - One copy of a recorded warranty
deed
Construction Lien Law affidavit (provided by
contractor if job is valued over $2500.00)
Owner/Builder disclosure this is required when
an owner is obtaining a permit.
Early Power Affidavit
Notice of Commencement a certified copy of the
recorded notice of commencement is required for
any job $2500.00 or greater prior to the first
inspection. (it is not required to submit for the
permit)
Site Plans - One site plan indicating the dimensions
and setbacks from all structures to the property lines.
Include patios, driveways, walkways, (materials and
surface treatments).
Boundary Survey - One copy of a sealed boundary
survey indicating current flood zone by a licensed
surveyor.
Elevation Certificate required if property lies
within an A” flood zone
Landscape Detail Plans - One landscape detail
plans showing the location of existing historic,
specimen, understory, shade trees, and proposed
trees. Include tree sizes, sod type, shrub size, type,
and automatic irrigation system (if required). Plans
must include foundation plantings for front, side
street and rear structures facing saltwater canals,
freshwater canals, lakes, golf courses and public
right of ways.
Tree Survey - One tree survey. (Survey to be no
more than 24 months old and shall identify all
protected trees by species name, and the size of the
trunk measured a the diameter at breast height).
One driveway detail plans equivalent in detail to the
City of Palm Coast residential culvert detail
available on the city website. (DWG NO 002-
270605).
One sealed topographic surveys referencing
1988 NAVD datum/lot grading plan (see
Stormwater req.) The survey should include the
driveway width at the property line and at the
edge of pavement and the distance from the
proposed driveway flare to any road intersection
within 75feet.
Grade elevation profile drawing is required
when the proposed structure is on a saltwater
canal lot.
A foundation survey is required prior to
vertical construction
A final survey is required prior to final
inspection
Boundary Survey, Landscape Detail
Plans, and Tree Survey may be inclusive
on one plan and must be labeled as such
and is to be separate from the
construction drawings.
5
GREEN BUILDING - Single family Residence / Duplex
Permit application signed by the licensed
contractor if a contractor is hired.
Construction Drawings - One set of signed and
sealed construction drawings. Include product
approval.
Green Home Certification Checklist Florida
Green Building Coalition, Inc. Schedule A , Version
6.00
Color/Material information - Provide colors of all
architectural features on elevation plans or on a
separate attached paper, complete with manufacturer
name and color description (including, but not limited to
roof, exterior wall, trim, door, garage, brick, quoins, stone/rock,
decorative shutters).
Energy Calculations - One sets of energy
calculations.
Water and Sewer Receipt
Roofing worksheet
Warranty Deed - One copy of a recorded warranty
deed
Construction Lien Law affidavit (provided by
contractor if job is valued over $2500.00)
Owner/Builder disclosure this is required when
an owner is obtaining a permit.
Early Power Affidavit
Notice of Commencement a certified copy of the
recorded notice of commencement is required for
any job $2500.00 or greater prior to the first
inspection. (it is not required to submit for the
permit)
Site Plans - One site plan indicating the dimensions
and setbacks from all structures to the property lines.
Include patios, driveways, walkways, (materials and
surface treatments).
Boundary Survey - One copy of a sealed boundary
survey indicating current flood zone by a licensed
surveyor.
Landscape Detail Plans - One landscape detail
plans showing the location of existing historic,
specimen, understory, shade trees, and proposed
trees. Include tree sizes, sod type, shrub size, type,
and automatic irrigation system (if required). Plans
must include foundation plantings for front, side
street and rear structures facing saltwater canals,
freshwater canals, lakes, golf courses and public
right of ways.
Tree Survey - One tree survey. (Survey to be no
more than 24 months old and shall identify all
protected trees by species name, and the size of the
trunk measured a the diameter at breast height).
One driveway detail plans equivalent in detail to the
City of Palm Coast residential culvert detail
available on the city website. (DWG NO 002-
270605).
Three (3) sealed topographic surveys referencing
1988 NAVD datum/lot grading plan (see
Stormwater req.) The survey should include the
driveway width at the property line and at the
edge of pavement and the distance from the
proposed driveway flare to any road intersection
within 75feet.
Grade elevation profile drawing is required
when the proposed structure is on a saltwater
canal lot.
A foundation survey is required prior to vertical construction
A final survey is required prior to final inspection
6
Additions/Renovations/ Screen Enclosures with solid roof
(screening existing porches/sunrooms/Florida rooms)
If the slab is existing, a letter from an engineer must be submitted verifying the
existing slab is adequate to support the new structure
Permit application signed by the licensed
contractor if a contractor is hired.
Construction Drawings - One set of signed and
sealed construction drawings to include truss
package, layout and fastening schedule. Plans
must include the elevation drawings of any/all
sides being aesthetically changed by the
addition. Existing floor plan and the proposed
floor plan labeling all rooms including the
intended ‘use’ of the proposed area, (plans
MUST display means of egress) wall sections,
bearing and shear walls, footings and re-
enforcement, roof slope, overhang and method
of ventilations mechanical diagram, (if no AC it
to be provided, indicate method of heating)
electrical diagram (including interconnected
smoke detectors) door and window load
calculations from the manufacturer.
Product Approval Spec Sheet
Color/Material information - Provide colors
of all architectural features on elevation plans or
on a separate attached paper, complete with
manufacturer name and color description
(including, but not limited to roof, exterior wall,
trim, door, garage, brick, quoins, stone/rock,
decorative shutters).
Energy Calculations - One set of energy
calculations if area is to be heat/cooled.
Roofing worksheet
Warranty Deed must be recorded.
Construction Lien Law affidavit (provided by
contractor if job is valued over $2500.00)
Owner/Builder disclosure this is required
when an owner is obtaining a permit.
Notice of Commencement a certified copy of
the recorded notice of commencement is required for
any job $2500.00 or greater prior to the first
inspection. (it is not required to submit for the
permit)
Site Plans - One site plan indicating the size,
dimensions and locations of the proposed
addition and the setback dimensions from all
existing structures to the property lines. Include
patios, driveways, walkways, material and
surface treatments.
Landscape Detail Plans One landscape detail
plan indicating tree protection or removal
requirements. If trees are not to be removed,
you must write No trees to be removed”. A
tree removal permit may be required. Plant
types, sizes, quantities, and locations (if
applicable) sodded, mulched and undisturbed
areas. The plans must include existing and
proposed foundation plantings for front, side
street and rear structures facing saltwater canals,
freshwater canals, lakes, golf courses, and
public right of ways.
If a foundation survey for the concrete involved in your project is not on file in our
office, a foundation survey will be required prior to any vertical construction.
7
A final survey will be required prior to the final inspection.
Screen Enclosure/Aluminum
If the slab is existing, a letter from an engineer must be submitted verifying the
existing slab is adequate to support the new structure.
Permit Application - signed by the licensed contractor if contractor is to obtain permit.
Recorded Warranty Deed
Construction Drawings - One set of signed and sealed engineering drawings. All drawings must include
the House/addition elevation drawings of any/all sides being aesthetically changed by the addition. Include
intended use of proposed area.
Construction lien law affidavit (provided by contractor if job is valued over $2500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
Site Plan - One site plan indicating the size, dimensions, and proposed location. Include setback
dimensions from all existing structures to the property lines. Include patios, driveways, walkways, materials
and surface treatments to be used.
Landscape Plan One landscape detail plan indicating tree protection or removal requirements. If trees
are not to be removed, you must write No trees to be removed”. A tree removal permit may be required.
Plant types, sizes, quantities, and locations (if applicable) sodded, mulched and undisturbed areas. The
plans must include existing and proposed foundation plantings for front, side street and rear structures
facing saltwater canals, freshwater canals, lakes, golf courses, and public right of ways.
If a foundation survey for the concrete involved in your project is not on file in our
office, a foundation survey will be required prior to any vertical construction.
8
Window/Door/Garage Door replacement
Permit Application - signed by the licensed contractor if contractor is to obtain permit.
__ Product Approval Spec Sheet (detail/installation sheets to be in field at time of inspections)
Recorded Warranty Deed
Floor layout indicating locations of replacement(s)
Construction lien law affidavit (provided by contractor if job is valued over $2500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
Electrical/Mechanical/Plumbing
Permit Application - signed by the licensed contractor if contractor is to obtain permit.
Recorded Warranty Deed
Two sets of Drawings (AC Equipment change-outs must submit system verification (AHRI))
Site Plan one site plan if necessary
Construction lien law affidavit (provided by contractor if job is valued over $2500.00, Mechanical if over $7500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any
electric/plumbing job $2500.00 or greater and any mechanical job $7500.00 or greater, prior to the first inspection. (it
is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
Demolition
Permit Application - signed by the licensed contractor if contractor is to obtain permit.
Recorded Warranty Deed
One set of Construction Drawings (not needed for disconnect / reconnects, AC change outs)
Site Plan One site plan indicating area to be demolished
Construction lien law affidavit (provided by contractor if job is valued over $2500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any
electric/plumbing job $2500.00 or greater and any mechanical job $7500.00 or greater, prior to the first inspection. (it
is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
9
Swimming Pools
Permit application - signed by the licensed contractor if contractor is to obtain permit.
Warranty Deed
Construction Drawings - One set of construction drawings. Signed and sealed drawings for pool
construction may be filed in a master file. This will eliminate the need to submit signed and sealed
drawings individually when submitting for a permit. (one time $225.00 charge)
Total Dynamic Head Calculation Worksheet OR signed and sealed calculations.
Aluminum Enclosure Drawings - One set of enclosure plans if the pool is to be enclosed. Signed and
sealed drawings for the aluminum enclosure may be filed in a master file. This will eliminate the need to
submit signed and sealed drawings individually when submitting for a permit. (one time $225.00 charge)
Construction Lien Law affidavit (provided by contractor if job is valued over $2500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit
Site Plan One site plan indicating the size, deck dimensions, the overall deck square footage (including
pool area) and setback dimensions from pool deck/enclosure to the property lines. Site plans must include
all equipment and door pads. Individual structures such as mechanical equipment and umps shall be
screened by property owner with visual buffer planting, when visible from right of ways, parking areas, or
adjacent properties. In lieu of a visual buffer planting, solid decorative fencing or walls may be installed to
screen from public view. Plants used shall be native or shall be vegetarian that conserves water, is adaptable
to local conditions, and is drought tolerant.
Landscape Plan One landscape detail plans indicating tree protection or removal requirements. If trees
are not to be removed, you must write No trees to be removed”. A tree removal permit may be required.
Plant types, sizes, quantities, and locations (if applicable) sodded, mulched and undisturbed areas. The
plans must include existing and proposed foundation plantings for front, side street and rear structures
facing saltwater canals, freshwater canals, lakes, golf courses, and public right of ways. No larger than 8 ½ x
14
Topographic Survey - One signed and sealed topographic survey (less than 12 months old) using 1988
NAVD Datum, with a lot grading plan to comply with Stormwater Requirements effective November 1,
2007.
A final survey to include topographic (to include drainage) information must be
submitted prior to the final inspection.
10
Above Ground Pools
Permit application
Site Plan - One site plans indicating the setback dimensions from pool deck/enclosure to the property lines.
No larger than 8 ½ x 14
o Water meter pit and pep tank panel located on site plan
o If a fence is to be included with the permit, the location, color, material, and height of fence must
be included on the site plan. Screening for fences along rear or side lot lines abutting a right of
way, golf course, or saltwater canal shall be facilitated by setting the fence back a minimum of
three (3) feet from the property line and installing shrubs or vines on the outside of the fence for
softening and enhancement. This requirement also applies to any fence facing the front or side
corner of the property. This requirement applies to all types of fencing.
Manufacturer’s Drawings - One copy of the manufactures drawings for the pool assembly.
Construction Lien Law affidavit (provided by contractor if job is valued over $2500.00)
Warranty Deed
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
Solar
Permit Application
Manufacturer Drawings Two set of plans / Manufactures Specifications
Owner/Builder disclosure this is required when an owner is obtaining a permit
Warranty Deed
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Construction Lien Law affidavit (provided by contractor if job is valued over $2500.00)
If solar panels are located on the ground, the panels must be completely screened
by landscaping or an opaque fence.
11
Fence/Wall
Permit Application
Two copies Site Plan
o Indicate water meter pit and pep tank panel. The fence must be 3’ from the pep panel.
o Indicate the location of the pep tank.
o One site plan which indicate the property lines, roadways, waterways, easements, all existing
structures, and proposed fence location, color, height and material, location, size and swing of
any/all gates, with the setback measurements to the property line. Indicate tree protection or
removal requirements. If trees are not being removed, you must write no trees to be removed”.
If trees are to be removed, a tree removal permit may be required. Screening for fences along
rear or side lot lines abutting a right of way, golf course, or saltwater canal shall be facilitated by
setting the fence back a minimum of three (3) feet from the property line and installing shrubs or
vines on the outside of the fence for softening and enhancement. This requirement also applies to
any fence facing the front or side corner of the property. This requirement applies to all types of
fencing.
Construction Drawings - Walls will require two sets of plans signed and sealed by a licensed Florida
Architect or Engineer. Plans must include the linear square footage, dimensions, column spacing and
finished cap.
Construction Lien Law affidavit (provided by contractor if job is valued over $2500.00)
Warranty Deed - One copy of a recorded warranty deed
Tenant Affidavit - this is required if property owner is NOT the applicant.
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
12
Docks and Boathouses/Boat Lifts
In accordance with the Palm Coast Restrictive Covenant and Easements you may not extend into the waterbody
more than 12’ unless such waterbody is 100’ or more in width. If so, same may extend 16’, in both instances as
measured at right angles to and from the property line abutting the waterbody.
Permit Application - signed by the licensed contractor if contractor is to obtain permit.
Construction Drawings - One set of signed and sealed construction drawings (if lift station for boat, a copy
of the electrical drawing and power source is required. Drawings must be cleaned and concise, drafted to
scale, showing all types of materials, sizes, dimensions and locations. Include any other details necessary to
convey design/construction intent. Brochures or photographs which include all dimension and material
information are acceptable to show design. ALL DOCKS MUST HAVE A HIP STYLE ROOF.
Site Plan - One set of the site plan which must include a drafted to scale professional drawing to show the
lot, property lines, proposed structure location and width of the canal. All dimensions must be included on
the site.
Warranty Deed
Construction Lien Law affidavit (provided by contractor if job is valued over $2500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
The Intracoastal Waterway must require all appropriate state and federal permits prior to
permit submittal (Army Corps. Engineers, DEP, SJRWMD, SFRWMD). In addition, a
database search from Florida Natural Areas Inventory, US Fish and Wildlife Services to
list plant and animal species that have potential to occur on property.
13
Seawall
Permit Application - signed by the licensed contractor if contractor is to obtain permit.
Warranty Deed
Construction Drawings - One sets of signed and sealed scaled drawings to include detailed construction of
the proposed bulkhead or coquina riprap.
Site Plan One set of the site plan which must indicate a drafted to scale professional drawing to show the
lot, property lines, proposed bulkhead/riprap location and width of canal. All dimensions must be included
on this site plan.
Right of Way Access Application
Construction Lien Law affidavit (provided by contractor if job is valued over $2500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
14
Beautification Right of Way
(To clear property belonging to the city that abuts your property)
Permit Application - signed by the licensed contractor if contractor is to obtain permit.
Right of Way Access Application
Site plan indicating measurements from both sides of the rear property line to the waters edge,
measurements from both side property lines to the proposed ROW. The 20’ ROW must be shown and the
amount of type of trees that are to be removed.
Owner/Builder disclosure this is required when an owner is obtaining a permit.
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Requirements:
Must be set back 10’ from side property lines
ROW may be anywhere between both side property line setbacks
All work in ROW must be done by hand. (no heavy equipment permitted)
Any disturbed areas must be stabilized immediately
All areas outside the BROW are to remain natural
Sample
Waters edge
---------------------------40'--------------------
--------20'---------
15'
R O W
15'
-----------Property lines----------
-
-------------Shaded area's are 10' set back---------------
-----
15
Deck
(Wooden with no roof)
Permit Application
Construction Drawings One set of signed and sealed construction drawings (by licensed Florida Architect
or Engineer)
Recorded Warranty Deed
Site Plan One signed and sealed survey which indicates the property lines, easements, size, dimension and
locations of proposed and all existing structures with the setback dimensions to the property lines. No
Landscape Plan One landscape detail plan indicating tree protection or removal requirements. If trees
are not to be removed, you must write No trees to be removed”. A tree removal permit may be required.
Plant types, sizes, quantities, and locations (if applicable) sodded, mulched and undisturbed areas. The
plans must include existing and proposed foundation plantings for front, side street and rear structures
facing saltwater canals, freshwater canals, lakes, golf courses, and public right of ways.
Construction Lien Law affidavit (provided by contractor if job is valued over $2500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
16
Slab/Patio
(Concrete only no roof)
Permit application
Recorded Warranty Deed
Construction Drawings One set of engineered
drawings. Required if slab is to structural (with
footers).
Site Plans - One site plan which indicates the
property lines, all existing structures and proposed
structures location with the setback dimensions to
the property lines. Site plans must include the
location of the water meter pit.
Landscape Plan One landscape detail plan
indicating tree protection or removal
requirements. If trees are not to be removed, you
must write No trees to be removed”. A tree
removal permit may be required. Plant types,
sizes, quantities, and locations (if applicable)
sodded, mulched and undisturbed areas. The
plans must include existing and proposed
foundation plantings for front, side street and rear
structures facing saltwater canals, freshwater
canals, lakes, golf courses, and public right of
ways.
Construction lien law affidavit (provided by
contractor if job is valued over $2500.00)
Notice of Commencement a certified copy of
the recorded notice of commencement is required for
any job $2500.00 or greater prior to the first
inspection. (it is not required to submit for the
permit)
Owner/Builder disclosure this is required
when an owner is obtaining a permit.
A foundation survey will be required if a structural patio is poured.
Paver Installation
Permit application
Recorded warranty deed
Site Plans - One site plan which indicate the property lines, all existing structures and proposed structures location
with the setback dimensions to the property lines. Site plans must include the location of the water meter pit. No
larger than 8 ½ x 14
Landscape Plan One landscape detail plan indicating tree protection or removal requirements. If trees are not to be
removed, you must write No trees to be removed. A tree removal permit may be required. Plant types, size s,
quantities, and locations (if applicable) sodded, mulched and undisturbed areas. The plans must include existing and
proposed foundation plantings for front, side street and rear structures facing saltwater canals, freshwater canals,
lakes, golf courses, and public right of ways.
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
17
Shed/Accessory Structure
Permit Application
Recorded Warranty Deed
Manufacturers Drawings -Two copies of the manufactures drawings for the shed assembly, OR two
copies of signed and sealed drawings for an accessory structure (detached garage, gazebo, etc.) Plans must
include height a shed is to be no more than 12’ tall. Plans must include diagram for anchoring system
(must meet 120 mph wind load requirements).
Roofing Material Worksheet -if shed is to be built on-site (not pre-manufactured)
Site Plan - Two site plan which indicate the property lines, roadways, waterways, easements, all existing
structures, and proposed structure. Indicate tree protection or removal requirements. If trees are not being
removed, you must write no trees to be removed”. Individual Structures such as sheds shall be screened by
the property owner with a visual buffer planting, solid decorative fencing or walls may be installed to screen
from public view. Plants used shall be native or shall be vegetation that conserves water, is adaptable to
local conditions, and is drought tolerant.
o Include size, dimension and location
o Include all setbacks to property lines
o Include colors and materials of the shed exterior and roof
Tenant Affidavit - if property owner is NOT the applicant
Construction Lien Law affidavit (provided by contractor if job is valued over $2500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
18
Signs
Multiple wall signs may be permitted together. Monument signs require separate applications for each.
Permit application
Construction Drawings - One set of engineered drawings - must include electrical drawing if sign to be
lighted.
Colored Renditions - One set of colored renditions that show the elevation and linear frontage of the
building as well as all dimensions and sign areas (in square footages)
Site Plan One site plan is required for free-standing / monument signs to include the lot frontage, the
location of the signs from the property lines, building and other existing signs.
Tree Survey One tree survey is required for free-standing / monument signs. Survey must be less than 24
months and identify all protected trees by species name and the size of the trunk measured at the diameter at
breast height. Where monument signs are proposed to be located on any development, all protected trees
that are located within fifty (50) feet of the proposed sign shall be shown on the tree survey.
Tenant Affidavit - if property owner is NOT the applicant
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Temporary signs and Construction Signs
All documents submitted MUST be original no photo/fax copies will be accepted.
Permit application
Site Plans - One site plan which indicate property lines, all existing structures and proposed location of
sign(s) with the setback dimensions to the property lines.
Construction Drawings - One set of engineering drawings
Authorization letter - from property owners (if applicant is not legal property owner).
19
Irrigation (Residential)
Required only if located within right of way
Permit Application
Recorded Warranty Deed
Right of Way application
Site Plans - One site plan depicting location of sprinkler heads - (POP UP types only allowed in right of
way.
Irrigation (commercial)
Not required on new construction sites
Permit application
Recorded Warranty Deed
Right of Way application - if work is to commence in right of way
Construction Lien Law affidavit (provided by contractor if job is valued over $2500.00)
Tenant Affidavit - if property owner is NOT the applicant
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
20
Roofing
Permit Application
Tile Roofs - must submit copy of plans with a letter from an engineer OR the plans indicating the trusses
can support the weight of the tile.
Recorded Warranty Deed
Roofing Worksheet - to include product approval numbers. (product approval detail /installation sheets to be at
jobsite for inspection)
Construction Lien Law affidavit (provided by contractor if job is valued over $2500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
Roofing Affidavit (offered to contractor only) - option of using affidavit or a roof sheathing inspection.
A Roof Sheathing inspection is required by owner/builders.
21
Hurricane Shutters
Permit Application
Recorded Warranty Deed
Product Approval Spec Sheet (detail/installation sheets to be in field at time of inspections)
Elevation plan - One plan indicating location, color, type and style
Construction Lien Law affidavit (provided by contractor if job is valued over $2500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
22
Driveway
Permit Application
Recorded warranty deed
Construction Lien Law affidavit (provided by contractor if job is valued over 2500.00)
Site Plans - one site plan which indicate the property lines, all existing structures and proposed driveway
location with the setback dimensions to the property lines.
o The water meter pit location must be indicated, pouring a driveway over a water meter pit is
prohibited.
o Depict the driveway width at the property line and the edge of the road, and the distance from
the proposed driveway to the edge of pavement of any road intersection within 75 feet.
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Driveways must be in accordance with the City of Palm
Coast residential culvert detail
See Stormwater/Engineering Documents for detail
23
Generator
If the gas company obtains the permit, they must list the electrical contractor as a sub. If the electrical company obtains
the permit, they must list the gas contractor as a sub NO EXCEPTIONS
Permit application
Recorded Warranty Deed
Construction Lien Law affidavit (provided by contractor if job is valued over 2500.00)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
Construction Drawings - One of plans to include: manufactures specifications including the generator transfer
switch, the BTU rating of each appliance served, the type of pipe to be used, the size of pipe to each appliance and the
length of the pipe run to each appliance.
Site Plan - One site plan depicting flood zone, size, location, setbacks, dimensions of generator and the concrete pad.
Setbacks must include from house to generator, and generator to property line. Survey must show proposed gas tank,
indicate if it is to be located above or below ground. Show dimensions, size, location and setbacks for the tank.
Individual structures such as mechanical equipment and pumps shall be screened by property owner with visual buffer
planting, when visible from rights-of-way, parking areas, or adjacent properties. In lieu of a visual buffer planting,
solid decorative fencing or walls may be installed to screen from public view. Plants used shall be native or shall be
vegetation that conserves water, is adaptable to local conditions, and is drought tolerant
Special Hazard Flood Zones A and AE
must be 1 foot above base flood
elevation if an AW Zone or 2 feet
above the highest adjacent grade is in
an A Zone. If the tank is in a special
hazard Flood Zone, provide technical
data for the tank anchoring system to
indicate it will not become buoyant
during a flood or place that tank above
the flood base elevation.
24
Gas/Propane Tank and piping
Permit Application
Recorded Warranty Deed
Construction Drawings - One set of plans that include: BTU rating of each appliance served, the type of
pipe to be used, the size of pipe to each appliance and the length of the pipe run to each appliance.
Site Plan - One site plan depicting flood zone, size, location, setbacks, dimensions of generator and the
concrete pad. Setbacks must include from house to generator, and generator to property line. Survey must
show proposed gas tank, indicate if it is to be located above or below ground. Show dimensions, size,
location and setbacks for the tank. Individual structures such as mechanical equipment and pumps shall be
screened by property owner with visual buffer planting, when visible from rights-of-way, parking areas, or
adjacent properties. In lieu of a visual buffer planting, solid decorative fencing or walls may be installed to
screen from public view. Plants used shall be native or shall be vegetation that conserves water, is adaptable
to local conditions, and is drought tolerant
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
Special Hazard Flood Zones A and AE must be 1 foot above base flood elevation if an AW Zone
or 2 feet above the highest adjacent grade is in an A Zone. If the tank is in a special hazard Flood
Zone, provide technical data for the tank anchoring system to indicate it will not become buoyant
during a flood or place that tank above the flood base elevation.
25
Fire Permits
(Hood installation, Ansul,
Alarms, Suppression, Sprinkler, Fuel Tank Installation)
Permit application
Plans One set of plans
Site Plans - One site plan (necessary for fuel tank installation)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Notice of Commencement Recording Affidavit in lieu of a notice of commencement if you are not in
direct contract with the property owner and have contracted your services with the general contractor, you
may fall under the general’s NOC and submit the affidavit.
Tenant Affidavit (if not property owner) - this is to allow the tenant to make improvements to real
property.
26
Telecommunication
Tower/Co-Location/Unmanned Buildings, Concrete, etc.
For tower information contact the Information Technology and Communication Department
386-986-4732
For new towers and changes to existing site, a development order must be issued through the
Planning Division prior to application for a building permit.
Permit Application
$3500.00 is due at time of application submittal for plan review (by consultants)
Site plan indicating all existing and proposed development.
Structural plans
Co-locations require a structural analysis from licensed engineer stating the structure is
sufficient to support the proposed antenna.
Development Order (if applicable)
.
27
Site Development Permit
A site development permit will be issued with each commercial permit.
Commercial permits will not be issued until a site development is issued.
Permit Application
Development Order
Landscaping and Irrigation are included on the site development permit.
Commercial Additions/Alterations
All documents submitted MUST be original no photo/fax copies will be accepted.
General, electrical, mechanical, plumbing and roofing contractors are required to submit for a permit.
Contractors must be registered in the Building Department database.
Permit Application
Construction Drawings - One set of signed and sealed construction drawings. (by licensed Florida
Architect or Engineer) Floor plan to show all areas and specify USE and square footage. Calculate seating
area of indoor and outdoor if applicable.
Parking Lot Layout - 1 sets of existing parking layout to include handicap parking
Roofing worksheet (if roof to be altered added)
Energy Calculations (if applicable)
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Tenant Affidavit (if not property owner) - this is to allow the tenant to make improvements to real
property.
Owner/Builder disclosure this is required when an owner is obtaining a permit. (only permitted up to
$75,000 work and it must be a private individual, not a corporation, etc.)
28
Site Development Permit
A site development permit will be issued with each commercial permit.
Commercial permits will not be issued until a site development is issued.
Permit Application
Development Order
Commercial (new construction)
All documents submitted MUST be original no photo/fax copies will be accepted.
General, electrical, mechanical, plumbing and roofing contractors are required to submit for a permit.
Contractors must be registered in the Building Department database.
Permit application
Construction Drawings - One sets of signed and sealed complete engineered construction drawings
designed to meet requirements of the Florida Building Code.
Energy Calculations One copy
Roofing worksheet
Well Permit or Water Receipt
Recorded Warranty Deed
Boundary Survey
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Temporary Sales/Office/Construction trailers require a separate permit
Sales/Office Trailer
Completed application
One set of plans to include concrete
slab or stem wall and required
anchoring.
Site plan to include :
o Location of trailer
o Location of electric meter
o Parking
o Fencing
o Signage
o landscaping
o water/wastewater facilities
Construction Trailer
Completed application
Site plan to include:
o Location of trailer
o Location of electric meter
o water/wastewater facilities
29
Lot Clearing
(Vacant)
Permit Application
Right Of Way Application
Topographic Survey with elevation data in 1988 NAVD following Stormwater guidelines.
Hardwood trees over 6” in caliper should be noted on the survey.
Grading plan with grade proposals and trees that are to be removed. (Note: the site needs to maintain a
minimum of 1 tree / 2500 square feet of total lot area after work is completed. Existing trees to remain must
be barricaded and protected).
Testing Agency Documentation - For lots that are partially clearing to remove unsuitable fill, written proof
from a testing agency of unsuitable fill is required.
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
Note: a final topographic survey will be required for final inspections to ensure that the swale meets the
required grade and the lot complies with the grading plan. For lots with unsuitable fill, only restoration of the
access point will be required.
Lot Re-Grading
(not vacant)
Permit Application
Right Of Way Application
Site plan identifying the scope of work, a grading plan, and the location of any hardwood trees over 6” in
caliper. Existing trees must be barricaded and protected.
Notice of Commencement a certified copy of the recorded notice of commencement is required for any job
$2500.00 or greater prior to the first inspection. (it is not required to submit for the permit)
Owner/Builder disclosure this is required when an owner is obtaining a permit.
Note: for extensive work a topographic survey may be required for the permit application and a final survey
for the final inspection.
Lot Clearing and Grading permits will require reviews by the Zoning, Stormwater and Urban Forestry
Departments.