Document Title
Incoming Inspection Procedure
Document No:
QP 74301
Revision Number
08
3390 Gateway Boulevard
Fremont, CA 94538
USA
Effective Date
05/07/2013
Page Number Page 1 of 9
A printed copy of this document is considered uncontrolled. Users can access Document Control share drive (storage/document
control) to verify the latest version available. Not to be reproduced or copied without written permission.
Revision History
Rev No DCN # Changes Effective Date Approved
01 Initial Release 08/06/04
02 0008 Modification of procedure 10/080/4 MY
03 0042 Revision Changed 10/19/04 MY
04 0715 Added IQC in section 3&6. Change Owner 07/28/09 YZ
05 0794 Added SQE responsible, Modified flow chart 12/30/09 JC
06 0806 Added Supplier PCN/ECN process 01/15/10 YC
07 0986 Added the requirements, added ship to stock,
added the waiver request, re-wording.
05/23/11 A. Qin
08 1153 Yearly Review, Added PRD-CM-003 in,
Change process owner
05/07/13 A. Qin
Incoming Inspection Procedure
Process Owner: Jeff Chen Date: 05/06/13
Department Manager: Alex Qin
Date: 05/07/13
Document Title
Incoming Inspection Procedure
Document No:
QP 74301
Revision Number
08
3390 Gateway Boulevard
Fremont, CA 94538
USA
Effective Date
05/07/2013
Page Number Page 2 of 9
A printed copy of this document is considered uncontrolled. Users can access Document Control share drive (storage/document
control) to verify the latest version available. Not to be reproduced or copied without written permission.
1.0 Purpose
This procedure defines the process flow to verify the quality and performance of the
purchased materials and services.
2.0 Scope
This procedure applies to all materials and services purchased from suppliers or
contractor manufacturer that have affect on the final product quality.
3.0 Authority and Responsibilities
IQC/QA Perform and coordinate the incoming inspection activities.
Coordinate the incoming inspections that conducted on the
assigned departments.
Collect and file the incoming inspection reports.
Forward the nonconforming products to MRB.
Production and
Engineering
Support the incoming inspections to IQC on technical and
manpower when necessary.
Built up the IQC standard and provide technical supports.
SQE Communicate with suppliers to follow the requests on the
incoming inspections.
Release the SCAR to suppliers.
Initiate the improvement programs with suppliers.
Purchasing Notify supplier to follow Optoplex supplier PCN/ECN process for
any change on supplied parts.
MRB Review any major nonconforming material issues identified during
receiving inspection or production, and propose proper
disposition.
Suppliers Issue the PCN to notify Optoplex of preliminary ECN.
Obtains Optoplex approval for any change of supplied parts.
Prepare the Outgoing Inspection Report before shipping out.
Document Title
Incoming Inspection Procedure
Document No:
QP 74301
Revision Number
08
3390 Gateway Boulevard
Fremont, CA 94538
USA
Effective Date
05/07/2013
Page Number Page 3 of 9
A printed copy of this document is considered uncontrolled. Users can access Document Control share drive (storage/document
control) to verify the latest version available. Not to be reproduced or copied without written permission.
4.0 Definitions and Acronyms
IQC Incoming Quality Control
SQE Supply Quality Engineering
PO Purchase Order
MRB Material Review Board
A panel of material management/purchasing, quality assurance and
manufacturing / production representatives that reviews and dispositions
nonconforming products..
SCAR Supplier Corrective Action Request
Document Title
Incoming Inspection Procedure
Document No:
QP 74301
Revision Number
08
3390 Gateway Boulevard
Fremont, CA 94538
USA
Effective Date
05/07/2013
Page Number Page 4 of 9
A printed copy of this document is considered uncontrolled. Users can access Document Control share drive (storage/document
control) to verify the latest version available. Not to be reproduced or copied without written permission.
5.0 Flow Chart of Procedure
Responsible Flow Chart Notes Record
Purchased Product
transferred from
Receiving
Meet the spec.?
Transfer to
Inventory
Receiving
Material
Management
IQC
Receiving Log
Receiving transfer the
incoming products to IQC.
Perform Receiving
Inspection
Material Transfer Form
IQC
SQE
Complete and file
the Inspection
Reports
Forward the Non-
conforming to MRB
IQC Inspection Report
Please refer to MRB
Procedure QP-83002
IQC
No
Yes
Collect the inspection
standards, related jig or
fixtures, gages.
Conduct inspection
against inspection
standards.
Fill out the Form with
attached IQC Reports and
forward the non-
conforming to MRB for
disposition.
IQC
IQC Inspection Report
IQC Inspection Status
Log
IQC Inspection Report
Refer to Supplier
Management Procedure
QP 74001
Identify the passed
products with labels or
stamps.
Document Title
Incoming Inspection Procedure
Document No:
QP 74301
Revision Number
08
3390 Gateway Boulevard
Fremont, CA 94538
USA
Effective Date
05/07/2013
Page Number Page 5 of 9
A printed copy of this document is considered uncontrolled. Users can access Document Control share drive (storage/document
control) to verify the latest version available. Not to be reproduced or copied without written permission.
6.0 General Requirements
6.1 Conduct the Qualification on Inspectors
The persons to perform the incoming inspections shall complete the necessary training
courses on related work instructions and received the certificates.
6.2 Prepare the Inspection Standard
The inspection standards shall be prepared and documented before the incoming
inspections.
For the special material such as optical parts, Engineering or Manufacturing Departments
will provide the technical supports on the contents of the standards.
Inspectors shall collect the inspection standards before performing the inspections.
If there is concern on the cosmetics between Optoplex and suppliers, a limit sample or
photos to demo the pass and reject shall be prepared as the inspection aid.
6.3 Prepare Supporting Jigs/Fixtures and Gages for Inspection
The measuring equipment or devices shall be used to make the measurements during
incoming inspection process. Those equipment shall be calibrated and maintained on the
pre-set intervals.
The gage used for the inspection for thread of screw shall be replaced on weekly basis to
avoid the worn out concerns.
6.4 Delegation of Incoming Inspection Tasks
For those parts that need the technical supports or special measuring equipment/skills
request, the incoming inspection tasks will be delegated to Engineering or Manufacturing
Departments.
In such condition, the IQC Inspection Tag Form shall be used to trace/monitor the status
of the inspections. The tag shall be attached with the incoming products and forwarded to
delegated departments.
Document Title
Incoming Inspection Procedure
Document No:
QP 74301
Revision Number
08
3390 Gateway Boulevard
Fremont, CA 94538
USA
Effective Date
05/07/2013
Page Number Page 6 of 9
A printed copy of this document is considered uncontrolled. Users can access Document Control share drive (storage/document
control) to verify the latest version available. Not to be reproduced or copied without written permission.
Once the inspection was completed, the tag form shall be filled out and collected
(together with the inspected material or products) by QA department.
6.5 Fill out the Incoming Inspection Reports
The Incoming Inspection Report shall be used for the inspection.
The contents of the Incoming Inspection Report include the following information:
1. Part number and revision number,
2. The supplier name,
3. Optoplex P/O number,
4. The lot number from supplier,
5. The items that need be inspected,
6. The sampling size,
7. Total quantity received,
8. Total qty rejected and passed,
9. Etc.
The inspector shall make a final decision on the inspection results and get approved from
supervisor or engineer. The final judgment (Pass or Reject, etc.) on the inspection result
and their respective quantities shall be clearly defined.
The outgoing inspection reports that provided from supplier shall be the reference
documents during the incoming inspections.
6.6 Identify the Status of the Inspection Result on Products
After completed the inspection, the incoming material or products shall have the quality
status identified on them.
A QC (Passed/OK) stamp on the package or green color label shall be used to identify the
passed status. For those material or product that are failed to meet the specification, a
rejected label or mark will be used.
The material or products that had completed the inspections shall keep the appropriate
Document Title
Incoming Inspection Procedure
Document No:
QP 74301
Revision Number
08
3390 Gateway Boulevard
Fremont, CA 94538
USA
Effective Date
05/07/2013
Page Number Page 7 of 9
A printed copy of this document is considered uncontrolled. Users can access Document Control share drive (storage/document
control) to verify the latest version available. Not to be reproduced or copied without written permission.
packaging to prevent the damages (Scratches or surface, aging, etc.) during the storage
or transportation. The products with ESD concerns should follow the ESD requirements in
packaging.
6.7 Check in the Passed Products to Warehouse
The material or products that are passed after inspection shall be forwarded to
warehouse by using the Material Transaction From and Material Transfer Log.
For those material or products that had been used for destructive tests (such as in Damp
Heat Test, Solderability Test, etc.) in Optoplex, the quantity will be absorbed by the
department who conducted the test.
6.8 Check in the Non-conforming Product to MRB
Those that are failed during inspection shall be forwarded to MRB by using the
Non-conforming Material Request Form.
6.9 Notify to Planner and Purchasing about the Non-conforming
If there is a high defect rate found during the incoming inspections and that will have the
impact to the production schedules, IQC shall notify Planner and Purchasing
Departments ASAP.
6.10 Keep the Incoming Inspection Records
The incoming documents such as Incoming Inspection Reports, Suppler Outgoing
Inspection Reports, Certificate of Material, etc shall be filed and kept in inspection
department.
6.11 Fill out the Ship to Stock Request
Those material/products that had demonstrated good delivery performances (quality) in
Incoming quality, IPQC and field claims can be waived for the inspections. The
Document Title
Incoming Inspection Procedure
Document No:
QP 74301
Revision Number
08
3390 Gateway Boulevard
Fremont, CA 94538
USA
Effective Date
05/07/2013
Page Number Page 8 of 9
A printed copy of this document is considered uncontrolled. Users can access Document Control share drive (storage/document
control) to verify the latest version available. Not to be reproduced or copied without written permission.
purpose of Ship-to-Stock is to save the resources of the company.
A Ship-to-Stock Request form shall be prepared by IQC and get approved for it. The
forms shall be collected and kept in IQC.
For the material/products that had qualified for the waive of IQC will be skipped for the
IQC process. Only the desk review shall be conducted such as review on the
documents (e.g. Packing List, OQC Report from supplier, C of C, expiration dates, etc.)
during the IQC stages. The IQC Reports shall be kept and maintained too.
An OK stamp or green color mark shall be used to demonstrate the quality status.
6.12 Define the Criteria for the Ship to Stock Material/Products
If anyone of the following minimum requirements had been met, the incoming
material/products will be qualified for the waive of inspections.
1. Consecutively three (within regular size) lots have passed the incoming
inspections and the supplier provides necessary OQC Report or C of C (If any)
on the supplied products.
2. The supplier with famous quality goodwill on the industry, provide the quality
assurance on their products or the products are beyond the Optoplex inspection
technical capacity. Such as Epoxy, Acetone, Motor, etc.
3. Other special reasons.
Even during the waive for the inspection, IQC has authority to conduct inspections on
the Incoming material/products when necessary.
6.13 Terminate the Ship to Stock
When an incoming lot had found claims during the process or field complains, the
waive status shall be terminated by the IQC immediately, no approval process
needed.
Further investigation on the pre-delivered material/products shall be checked by
traceability if necessary.
Document Title
Incoming Inspection Procedure
Document No:
QP 74301
Revision Number
08
3390 Gateway Boulevard
Fremont, CA 94538
USA
Effective Date
05/07/2013
Page Number Page 9 of 9
A printed copy of this document is considered uncontrolled. Users can access Document Control share drive (storage/document
control) to verify the latest version available. Not to be reproduced or copied without written permission.
For the re-entry of the waive of inspection, the Ship-to-Stock Form shall be used
again.
6.14 Request for the Waive from Optoplex
If the supplier has the concerns on the rejected parts for minor symptoms such as
minor dimensions, minor cosmetics and non-function impact to products, a request for
waive can submit to QA of Optoplex form supplier.
The production, IQC and QA departments will make a review on the request.
No repeat (consecutive lots) waive request from supplier for the some symptoms is
allowed. The supplier performance shall count the records on the parts that had been
waived.
6.15 Request Corrective Actions for Suppliers (SCAR)
If necessary, a Corrective Action Request shall be initiated from QA/SQE to supplier f
for further improvements. The detail of process of SCAR, please refer to QP 85201
Corrective and Preventive Action Procedure.
7.0 Reference Documents
QM 001 Quality Manual
QP 74002 Purchasing Procedure
QP 74001 Supplier Management Procedure
QP 83001 Non-conforming Material Control Procedure
QP 85201 Corrective and Preventative Action Procedure
PRD-CM-003 Product Qualification and Quality Monitoring Procedure
WI-ISP-018 IQC Sampling Table
Form Q061 IQC Job Tag
Form Q067 Waive Request Form
Form Q068 Ship to Stock Request Form
Form P152 Material Transfer Log.
Form Q025 IQC Inspection Report