Printed on
Recycled Paper
BUDGET
JUSTIFICATIONS
and Performance Information
Fiscal Year 2024
NOTICE: These budget
justications are prepared
for the Interior, Environment
and Related Agencies
Appropriations
Subcommittees. Approval for
release of the justications
prior to their printing in
the public record of the
Subcommittee hearings
may be obtained through
the Ofce of Budget of the
Department of the Interior.
The United States
Department of the Interior
BUREAU OF
INDIAN EDUCATION
Table of Contents
DEPARTMENT OF THE INTERIOR
BUREAU OF INDIAN EDUCATION
Budget Justifications
Fiscal year 2024 Table of Contents
Executive Summary ....................................................................................................................... BIE-ES-1
General Statement .......................................................................................................................... BIE-GS-1
Organizational Chart ...................................................................................................................... BIE-GS-3
Summary Tables
Budget Summary Table ............................................................................................................ BIE-ST-1
Comprehensive Budget Table ................................................................................................... BIE-ST-2
Tribal Priority Allocations Summary ........................................................................................ BIE-ST-3
Fixed Costs Summary ............................................................................................................... BIE-ST-4
Budget Changes at a Glance ..................................................................................................... BIE-ST-5
Employee Count by Grade ........................................................................................................ BIE-ST-7
Section 403 Compliance ........................................................................................................... BIE-ST-8
Authorizing Statutes ................................................................................................................. BIE-AUTH-1
Administrative Provisions ........................................................................................................ BIE-PROV-1
Appropriation: Operation of Indian Education Programs (OIEP)
Appropriation Language – OIEP .......................................................................................... BIE-OIEP-1
Summary of OIEP Requirements .......................................................................................... BIE-OIEP-2
Justification of Fixed Costs and Related Changes ................................................................ BIE-OIEP-3
Justification of Internal Realignments .................................................................................. BIE-OIEP-4
Justification of OIEP Program and Performance by Activity ............................................... BIE-OIEP-5
Appropriation: Education Construction
Appropriation Language – Education Construction ......................................................... BIE-CONST-1
Appropriation Language Citations .................................................................................... BIE-CONST-2
Summary of Education Construction Requirements ......................................................... BIE-CONST-4
Justification of Fixed Costs and Related Changes ............................................................ BIE-CONST-5
Education Construction Summary .................................................................................... BIE-CONST-6
Five Year Deferred Maintenance and Construction Plan ................................................. BIE-CONST-9
Justification of Education Construction Program and Performance by Activity ............ BIE-CONST-14
Appropriation: Great American Outdoor Act (GAOA)
GAOA, National Parks and Public Land Legacy Restoration Fund (LRF) ........................ BIE-GAOA-1
Permanent Appropriation: Gifts and Donations
Gifts and Donations ............................................................................................................ BIE-PERM-1
Appendices
Program Description Table .................................................................................................... Appendix-1
Tribal Priority Allocations by Location ................................................................................. Appendix-2
OIEP Funding Distributions ................................................................................................... Appendix-3
Executive Summary
BIE-ES-1
Bureau of Indian Education
FY 2024 Budget Request
EXECUTIVE SUMMARY
“If you want America to have the best-educated workforce, let’s finish the job by providing access to pre-
school for 3- and 4-year-olds. Studies show that children who go to pre-school are nearly 50% more
likely to finish high school and go on to earn a 2- or 4-year degree, no matter their background.”
- President Joseph R. Biden, Jr., February 7, 2023
The mission of the Bureau of Indian Education (BIE) is to provide students at BIE-funded schools with a
culturally relevant, high-quality education that prepares them with the knowledge and skills to equip them
for success in the opportunities of tomorrow, become healthy and prosperous individuals, and lead their
communities and sovereign nations to a thriving future that preserves their unique cultural identities.
The 2024 President’s Budget for BIE is $1.6 billion in current appropriations, a $209.2 million increase
from the 2023 enacted level. The Budget includes key investments to strengthen BIE’s autonomy as a
Federal agency and improve local services for tribally controlled and bureau-operated schools while also
advancing equity for historically underserved Tribal communities. BIE estimates that the budget supports
staffing of 3,264 full-time equivalents (FTEs) in 2024.
The United States has a trust and treaty responsibility to provide eligible Indian students with a quality
education. BIE serves as a capacity builder and service provider to support Tribes in delivering culturally
appropriate education with high academic standards to allow students across Indian Country to achieve
success. BIE funding supports classroom instruction, student transportation, Native language
development programs, cultural enrichment, gifted and talented programs, behavioral health and wellness
services, school safety, security, and education technology investments. In addition, BIE maintains
facility operations and maintenance at BIE funded schools operated by Tribes or the bureau. In some
schools—mostly in remote sites—funding also supports residential costs. BIE operates two
postsecondary institutions, administers grants for 29 tribally controlled colleges and universities, funds
two Tribal technical colleges, and supports multiple scholarship programs for highly qualified Native
American students.
The 2024 Budget invests in improved educational opportunities and service delivery for American Indian
students from their earliest years through college. BIE continues to strengthen itself as an independent
bureau and is developing a strategic plan for 2024 and beyond to create a roadmap for the future to
support Tribes in educating their youth and to deliver a world-class and culturally appropriate education.
FY 2024 BUDGET PROPOSAL
Budget Overview –
The 2024 Budget for the Bureau of Indian Education is $1.6 billion, an increase of
$209.2 million, providing resources for BIE’s core mission to support bureau-operated and tribally
controlled schools and administering grants to Tribal institutions of higher education.
BIE-ES-2
BIE funding supports classroom instruction, student transportation, native language development and
cultural enrichment programs, behavioral health and wellness services, school safety, security, and
educational technology investments, as well as facility operations and maintenance at BIE schools
operated by Tribes or directly by BIE. In some schools—mostly in remote sites—funding also supports
residential costs. In addition to operating two postsecondary schools and administering grants for 29
TCUs, BIE funds two Tribal technical colleges, and scholarship programs for highly qualified Native
American students.
The 2024 budget supports improved educational opportunities and service delivery for Native American
students from their earliest years through college. BIE continues to strengthen itself as an independent
bureau with the next iteration of BIE’s Five-Year Strategic Direction that will continue to act as a guiding
organization-wide plan designed to increase stakeholder collaboration on BIE's continuous improvement.
This important strategic roadmap aims to improve education service delivery and strengthen support for
BIE schools, as outlined in an adaptive framework structured around key areas of focus. Four
components of the new framework (human relations, policy and procedures, improving information, and
stakeholder relations) center on the emotional health and well-being of BIE students as foundational for
academic achievement and self-determination, as we support Tribes in educating their youth and
delivering a world-class and culturally appropriate education.
Total 2024 Budget Request
(Dollars in Thousands)
Budget Authority 2022 Actual 2023 Enacted 2024 Request
Current Appropriations 1,231,651 1,491,904 1,610,601
Total Budget Authority 1,232,598 1,492,904 1,611,601
FTEs 2,762 3,132 3,264
Investing in Tribal Education — The 2024 budget supports the Administration’s commitment to invest
in underserved communities, support early childhood, native language, and K-12 services to students
across Indian Country, and post-secondary opportunities that recognize the critical role that Tribal
postsecondary schools play in empowering Indian students and Tribal communities.
Operation of Indian Education Programs—The 2024 budget for the Operation of Indian Education
Programs account is $1.2 billion, an increase of $60.8 million. The core mission of BIE is to support
Bureau Operated and Tribally Controlled schools and administer grants to Tribal institutions of higher
education.
Elementary and Secondary Programs—The request includes $925.5 million, a $42.8 million increase
over the 2023 enacted level, for operating the entire BIE elementary and secondary school system—169
elementary and secondary schools and 14 dormitories—by providing educational services to
approximately 45,000 students in 23 States. Funds support the basic and supplemental education
programs at BIE-funded schools, student transportation, facility operations, and maintenance.
The 2024 request includes targeted funding to improve Indian student academic outcomes, address
maintenance needs, support expanded preschool and Native language programs, and provide pay parity
for Tribal teachers while fully funding projected Tribal Grant Support Costs. The Budget provides
$508.7 million, a $27.0 million increase over 2023 enacted, for Indian School Equalization Program
funds to enhance opportunities and outcomes in the classroom, provide improved instructional services,
BIE-ES-3
and support increased teacher quality, recruitment, and retention. The request level of $22.1 million,
including a $500,000 program increase, for Education Program Enhancements supports professional
development for teachers, advances the quality of in-classroom instruction, and incorporates improved
Native language and culture programs in classrooms. Early Child and Family Development funding of
$26.1 million enables BIE to provide preschool opportunities at BIE-funded schools.
Facilities Operations and Maintenance is $160 million, a $5.6 million increase over the 2023 enacted
amount, and includes investments to keep pace with operational cost increases and support the timely
maintenance and replacement of equipment at BIE schools. The Budget also includes $22.6 million,
including a $2.0 million program increase, for the Johnson-O’Malley program, which is authorized to
support the individualized educational needs of eligible Indian students enrolled in public schools and
nonsectarian private schools.
The Budget continues to invest in activities that promote educational self-determination for Tribal
communities and includes $98.7 million for Tribal Grant Support Costs for Tribes that choose to operate
BIE-funded schools. This level of funding supports 100 percent of the estimated requirement. To further
support sovereignty, the Budget proposes a provision allowing for the expansion of more than one grade
at BIE-funded schools with a K-2 or K-4 structure.
Postsecondary Programs—The request includes $189.6 million for Postsecondary Programs, a $6.0
million increase over 2023 enacted. The 2024 budget continues recognition of the critical role Tribal
postsecondary institutions have in empowering Indian students and promoting equity for Tribal
communities. These institutions are on or near reservations; they directly serve Tribal communities with
culturally relevant education and career pathways in a supportive environment. Postsecondary education
of Tribal members remains an essential component in the economic development of many Tribes.
The proposed budget will provide $34.9 million, including a $2.0 million program increase, for BIE-
operated Haskell Indian Nations University and Southwestern Indian Polytechnic Institute; $87.9 million
for grants to 29 Tribal Colleges and Universities (TCUs); and $10.7 million, a $1.5 million increase over
the 2023 enacted level, for grants for two Tribal Technical Colleges.
Postsecondary Programs fund multiple scholarship programs, including $43.4 million for the Scholarships
and Adult Education program to improve educational opportunities and serve a larger population of
qualified Native American students. The program promotes equity through educational grants to Tribal
communities, which have been historically underserved and adversely affected by persistent poverty and
inequality.
Education Program Management The Budget includes $79.3 million, an increase of $12.1 million over
2023 enacted, for education management and information technology (IT) to optimize learning
opportunities for students of all ages. Education Program Management (EPM) funding supports ongoing
improvements in high-priority functional areas, including acquisition, school safety, performance
tracking, and technical support to schools in the field. Other management activities include data
collection, analysis, and reporting; financial and budget functions; oversight and coordination of major
facility repairs; and management of grant applications. BIE IT includes the Native American Student
BIE-ES-4
Information System, wide area network infrastructure, and general support systems used by BIE-funded
schools.
EPM initiatives in 2024 include the continued implementation of a School Operations Office of Self-
Determination to develop Tribal capacity and promote maximum Indian participation in educational
programs and services; the Justice40 Initiative to promote environmental justice; and BIE’s Social
Emotional Learning project to develop a national curriculum to support behavioral health and wellness
programs at BIE-funded schools. The funding in 2024 will also allow EPM to calculate and report on
methodologies for maximizing the benefits to underserved communities.
The budget proposes $33.7 million, an increase of $5.8 million over the 2023 enacted level, for Education
IT to support the ongoing costs of distance learning and enhanced classroom technology. BIE continues
to collaborate with Tribes and communities to alleviate ongoing strains imposed by the COVID-19
pandemic on BIE students and their families, teachers, administrators, and other staff members in K–12
schools and at TCUs. The 2024 Budget will enable BIE to leverage ongoing infrastructure investments in
new technology and operational capabilities at BIE-funded schools, including the new Education
Learning Management System, by supporting comprehensive online delivery of educational courses to
students and professional development opportunities for teachers. Education IT resources will continue
the annual learning software subscriptions and licenses, support contract extensions needed to maintain
this investment, and support educational IT personnel costs for remote learning and additional broadband
capabilities.
The Payments for Tribal Leases are accounted for in the Bureau of Indian Affairs (BIA) budget and used
to administer BIA and BIE leases pursuant to section 105(l) of the Indian Self-Determination and
Education Assistance Act. The Budget reflects the Administration’s support for the principles of Tribal
self-determination and strengthening Tribal communities across Indian Country by proposing to reclassify
105(l) leases as current mandatory spending in 2024. This funding reclassification will provide Tribes
with certainty in meeting these ongoing needs through dedicated funding sources.
Tribal Priority Allocations—Tribal Priority Allocations (TPAs) give Tribes the opportunity to further
Indian self-determination by establishing their priorities and reallocating Federal funds among programs
in this budget category. The 2024 BIE Budget includes TPA funding of $67.3 million.
Education Construction— The 2024 Budget includes $416.2 million, an increase of $148.3 million over
2023 enacted, in annual funding for Education Construction to replace and repair school facilities and
address deferred maintenance needs at campuses across the BIE school system. This funding includes
substantial investments to address the climate crisis with more sustainable BIE infrastructure. Whenever
feasible, BIE facilities projects incorporate techniques to reduce energy and water consumption and
greenhouse gas emissions and to prepare the facilities for the predicted effects of climate change. The
Indian Affairs (IA) Office of Facilities, Property and Safety Management—in close coordination with
BIE—manages the Site Assessment and Capital Investment (SACI) Program, a comprehensive approach
to assess the conditions of bureau-funded schools and prioritize requirements for campus improvements.
The SACI Program follows formalized procedures that respect Tribal sovereignty and self-determination
and result in consensus agreements with schools, Tribes, and IA for major renovations and new
construction projects. The SACI Program has developed a long-term facilities plan that is continuously
BIE-ES-5
updated and adjusts to changes in education construction funding and facility evaluation or selection
criteria. Replacing or repairing BIE-funded schools is a high priority that has produced tangible results,
with two new campuses opened to students in 2022.
The proposed $252.5 million for Replacement School Construction, a $136.0 million increase over the
2023 enacted amount, and $23.9 million for Replacement Facility Construction are critical to ensuring
that all Native students can develop in an environment conducive to quality educational achievement.
With the Replacement School Construction, Replacement Facility Construction, and Great American
Outdoors Act (Public Law 116–152) funding anticipated through 2024, BIE expects to support planning,
design, and construction work at nine BIE schools; final allocations are pending completion of the design
phase and refined cost estimates for each school. Appropriate housing is a key element for educational
staffing, especially at schools in remote locations. An additional $139.8 million is included for other
housing and facilities repair programs, including a $9.7 million program increase for facilities
improvement and repair and $2.5 million for new/replacement employee housing.
Fixed Costs—Fixed costs of $25.6 million are fully funded, which addresses teacher pay parity for all
BIE operated and Tribally controlled school teachers, increases in Federal employee pay, and increases in
the Working Capital Fund.
Bureau of Indian Education Facts
The Bureau of Indian Education (BIE) provides education services to approximately 45,000
students, with an average daily membership of approximately 40,000 students in 23 States, 169
elementary and secondary schools, and 14 dormitories.
Currently, 128—or 70 percent of—BIE-funded elementary schools, secondary schools, and
dormitories are tribally controlled and operate under the direction of individual Tribal
governments.
BIE also provides funding to 33 Tribal colleges, universities, and postsecondary schools.
Good Accounting Obligation in Government Act Report
The Good Accounting Obligation in Government Act (GAO-IG Act, P.L. 115-414) enacted January 3,
2019, requires that Agencies report the status of each open audit recommendation issued more than one
year prior to the submission of the Agency’s annual budget justification to Congress. The Act requires
Agencies to include the current target completion date, implementation status, and any discrepancies on
closure determinations.
The Department of the Interior leadership takes audit follow-up very seriously and considers our external
auditors, to include the Government Accountability Office (GAO) and Office of the Inspector General,
valued partners in not only improving the Department’s management and compliance obligations but also
enhancing its programmatic and administrative operations. As stewards of taxpayer resources, the
Department applies cost-benefit analysis and enterprise risk management principles in recommendation
implementation decisions. The Department’s GAO-IG Act Report will be available at the following link:
https://www.doi.gov/cj
General Statement
BIE-GS-1
BUREAU OF INDIAN EDUCATION
GENERAL STATEMENT
As we build our capacity, we are creating our own identity as a world class education
provider. This logo perfectly captures the spirit of our mission. Every detail honors our Indigenous
heritage and our commitment to the education of our students. It encapsulates intellect and
determination, which is exactly what we strive to instill in every student.
Tony L. Dearman
Director, Bureau of Indian Education
January 6, 2022
Introduction: The Bureau of Indian Education (BIE) serves as the principal government agency in
upholding the United States’ educational obligations to Indian Tribes and their eligible Indian students.
As stated in Title 25 CFR part 32.2, BIE’s mission is to provide quality education opportunities from
early childhood through life in accordance with a Tribe’s needs for cultural and economic well-being, in
keeping with the wide diversity of Indian Tribes and Alaska Native villages as distinct cultural and
governmental entities.
The People We Serve: The BIE implements Federal Indian education programs and funds 183 elementary
schools, secondary schools and dormitories (of which over two-thirds are tribally operated) located on 64
reservations in 23 States serving an estimated 45,000 individual students at full capacity. BIE also operates
two post-secondary schools and administers grants for 29 tribally controlled colleges and universities and
two Tribal technical colleges and provides nearly 500 post-secondary scholarship opportunities to highly
qualified American Indian students.
BIE is positioned to develop the next generation of Tribal leadership through a quality education. Native
American youth are the most important resource of any Tribe, and their education is vital to the well-
being of Indian Country. Many Indian communities that BIE programs support face social and socio-
economic challenges at disproportionate rates compared to the rest of America. Improving education
services in Tribal communities is essential to promote economic development, increase educational
achievement, and improve standards of living for future generations of American Indians and Alaska
Natives.
Federal Indian Policy: There are five major legislative actions aimed at improving the delivery of
education to eligible Indian students. First, the Indian Reorganization Act of 1934 introduced the teaching
of Indian history and culture in Bureau of Indian Affairs (BIA) schools. Second, the Indian Self-
Determination and Education Assistance Act of 1975 (Pub.L. 93-638) gave authority to federally recognized
Tribes to contract with the BIA for the operation of Bureau-funded schools and to determine education
programs suitable for their children. The Education Amendments Act of 1978 (Pub.L. 95-561) and further
technical amendments (Pub.L. 98-511, 99-99, and 100-297) provided funds directly to tribally operated
BIE-GS-2
schools, empowered Indian school boards, permitted local hiring of teachers and staff, and established a
direct line of authority between the BIE Director and the Assistant Secretary – Indian Affairs. The No
Child Left Behind Act of 2001 (Pub.L. 107-110) brought additional requirements to the schools by holding
them accountable for improving their students’ academic performance with the U.S. Department of
Education supplemental program funds they receive through the Bureau. In 2015, the Every Student
Succeeds Act (Pub.L. 114-95) was passed to amend the Elementary and Secondary Education Act of 1965
to increase local control, require consultation with Tribal governments with State and local education
agencies, and provide the BIE more access to U.S. Department of Education funded technical assistance,
support, and resources.
BIE Organization and Leadership: Although the BIA and BIE organizations have always pursued
different mission objectives and reported separately to the Assistant Secretary Indian Affairs, BIE was
historically funded as a Budget Activity within Indian Affairs until 2020.
Currently, line authority for BIE programs begins at the Assistant Secretary - Indian Affairs level who
oversees the Director of the Bureau of Indian Education. The primary responsibilities of the BIE
Director are to advise the Assistant Secretary - Indian Affairs on education policy issues, provide
leadership in consultations with Tribes, and deliver educational support and services. The BIE Director is
supported by the Deputy Bureau Director and Associate Deputy Directors.
The Deputy Bureau Director manages the School Operations division, which includes budget
formulation and execution, finance, acquisition, and safety and facilities-related issues of direct
concern to BIE schools. School Operations is the Bureau-wide resource for Associate Deputy
Directors, Education Program Administrators, and school administrators to resolve questions, fast
track priorities, and identify best practices.
The Associate Deputy Directors serve as top level senior executives responsible for providing
oversight, guidance, and technical assistance to BIE-funded schools. Associate Deputy Directors
are responsible for building a responsive organization that provides resources, direction and
services to BIE schools, and fosters parental, community, and organizational partnerships to
provide the emotional and social support students need.
Indian Education functions are closely coordinated with Indian Affairs. The functions performed by
Indian Affairs provide administrative oversight to ensure accountability at every level and avoid
duplication.
The current organizational chart for BIE is illustrated on the following page.
BIE-GS-3
Bureau of Indian Education Organization Fiscal Year 2024
*BIA Equal Employment Opportunity (EEO) program provides EEO services to BIE
Director
Bureau of Indian Education
Associate Deputy Director
Performance and Accountability
Deputy Director
School Operations
Associate Deputy Director
Tribally Controlled Schools
Education Resource Centers
Associate Deputy Director
Bureau Operated Schools
Education Resource Centers
Associate Deputy Director
Navajo Schools
Education Resource Centers
Chief Performance Office
Chief Performance Officer
Chief Academic Office
Chief Academic Officer
Office of Post-Secondary
Education
Office of Sovereignty in
Indian Education
President
Haskell Indian Nations University
President
Southwest Indian Polytechnic Institute
Summary Tables
Bureau of Indian Education Budget Summary Table
Dollars in Thousands ($000)
2022
Enacted
2023
Enacted
2024
President's
Budget
Request
Change
from 2023
(+/-)
Current Appropriations
Operation of Indian Education Programs 1,017,601 1,133,552 1,194,389 +37,247
Other Transfers -50,280 - -
-
Operation of Indian Education Programs
(w/ transfers)
967,321 1,133,552 1,194,389 +37,247
Direct FTE
2,266 2,583 2,712 +129
Reimbursable FTE
480 531 531 -
Subtotal, Current Operation of Indian Education Programs FTE 2,746 3,114 3,243 129
Education Construction 264,330 267,887 416,212 +148,215
Supplemental [To'Hajiilee Community School]
- 90,465 - -90,465
Education Construction
(w/ supplemental)
264,330 358,352 416,212 +57,750
Direct FTE
10 11 14 +3
Total, Current Appropriations
1,281,931 1,401,439 1,610,601 +185,462
Other Transfers -50,280 - - -
Supplemental
[To'Hajiilee Community School]
- 90,465 - -90,465
Total, Current Appropriations
(w/ supplemental and transfers)
1,231,651 1,491,904 1,610,601 +94,997
Direct FTE 2,276 2,594 2,726
+132
Reimbursable FTE 480 531 531
-
Total, Current FTE 2,756 3,125 3,257
+132
Permanent Appropriations
Operation and Maintenance of Quarters 22 - -
-
Gifts & Donations
925 1,000 1,000 -
Direct FTE
6 7 7 -
Total, Permanent Appropriations 947 1,000 1,000 -
Total, Permanent FTE 6 7 7
-
Budget Authority
TOTAL, Current and Permanent
(w/o supplementals and transfers)
1,282,878 1,402,439 1,611,601 +185,462
Current Transfers
-50,280 - - -
Current Supplemental Funding
- 90,465 - -90,465
TOTAL, Current and Permanent (w/ supplementals and transfers)
1,232,598 1,492,904 1,611,601 +94,997
Current Direct Appropriation FTE 2,276 2,594 2,726 +132
Permanent Direct Appropriation FTE
6 7 7 -
Reimbursable FTE 480 531 531 -
TOTAL, Adjusted FTE
2,762 3,132 3,264 +132
BIE-ST-1
BUREAU OF INDIAN EDUCATION
2024 BUDGET COMPARISON TABLE
Dollars in Thousands ($000)
ACCOUNT
ACTIVITY
Sub Activity
Program Element
[Non-Add]
2022
Enacted
2023
Enacted
Fixed
Costs
Internal
Transfers
Program
Changes
2024
President's
Budget
Request
CHANGE
FROM
2023
ENACTED
Includes
Funding Avail.
To Tribes (Y/N)
TPA CENTRAL
OTHER
PROGRAMS/
PROJECTS
OPERATION OF INDIAN EDUCATION PROGRAMS
ELEMENTARY & SECONDARY PROGRAMS (forward funded)
ISEP Formula Funds 440,784 481,636 +7,930 +19,091 508,657 +27,021 Y 508,657
ISEP Program Adjustments 5,844 6,539 +261 +500 7,300 +761 Y 7,300
Education Program Enhancements 16,513 21,025 +606 +500 22,131 +1,106 Y 22,131
[Native Language Immaersion Grant] [5,500] [7,500] [7,500]
Tribal Education Departments
5,003 5,889 5,889 Y 5,889
Student Transportation 59,616
70,007 +2,079 +2,000 74,086 +4,079 Y 74,086
Early Child & Family Development
21,655
25,267 +824 26,091 +824 Y 26,091
Tribal Grant Support Costs 89,450 95,822 +43 +2,830 98,695 +2,873 Y 98,695
Total, ELEMENTARY & SECONDARY PROGRAMS (forward funded) 638,865 706,185 +11,743 +24,921 742,849 +36,664 742,849
ELEMENTARY & SECONDARY PROGRAMS
Facilities Operations
70,189 80,888 +2,630 83,518 +2,630 Y 83,518
Facilities Maintenance 62,421
73,544 +2,999 76,543 +2,999 Y 76,543
Juvenile Detention Center Education
554
555 -555 -555 Y
Johnson-O'Malley Assistance Grants (TPA) 21,198
21,570 +91 -1,031 +2,000 22,630 +1,060 Y 22,630
Total, ELEMENTARY & SECONDARY PROGRAMS
154,362 176,557 +5,720 -1,586 +2,000 182,691 +6,134 22,630 160,061
POST SECONDARY PROGRAMS (forward funded)
Haskell & SIPI (forward funded)
28,622 30,325 +2,545 +2,000 34,870 +4,545 N 34,870
Tribal Colleges & Universities (forward funded) 76,510 87,926 87,926 Y 87,926
Tribal Technical Colleges (forward funded) 8,151 9,156 +9 +1,500 10,665 +1,509 Y 10,665
Total, POST SECONDARY PROGRAMS (forward funded) 113,283 127,407 +2,554 +3,500 133,461 +6,054 133,461
POST SECONDARY PROGRAMS
Tribal Colleges & Universities Supplements (TPA) 1,220 1,220 1,220 Y 1,220
Scholarships & Adult Education (TPA) 40,541 43,549 +239 -343 43,445 -104 Y 43,445
Special Higher Education Scholarships 4,992 4,992 4,992 N 4,992
Science Post Graduate Scholarship Fund 4,450 6,450 6,450 N 6,450
Total, POST SECONDARY PROGRAMS 51,203 56,211 +239 -343 56,107 -104 44,665 11,442
EDUCATION MANAGEMENT
Education Program Management 36,063 39,291 +5,134 -6 +1,150 45,569 +6,278 45,569
Program Management 34,808 35,855 +3,369 -6 +1,150 40,368 +4,513 N 40,368
Labor-Related Payments 74 25 +1,032 1,057 +1,032 N 1,057
Intra-Governmental Payments 1,181 3,411 +733 4,144 +733 N 4,144
Education IT 23,825 27,901 +135 +5,676 33,712 +5,811 N 33,712
Total, EDUCATION MANAGEMENT 59,888 67,192 +5,269 -6 +6,826 79,281 +12,089 45,569 33,712
TOTAL, OPERATION OF INDIAN EDUCATION PROGRAMS 1,017,601 1,133,552 +25,525 -1,935 +37,247 1,194,389 +60,837 67,295 45,569 1,081,525
OIEP Transfer to OIP BIA -50,280
TOTAL, OPERATION OF INDIAN EDUCATION PROGRAMS
w/ Other T
967,321 1,133,552 +25,525 -1,935 +37,247 1,194,389 +60,837 67,295 45,569 1,081,525
EDUCATION CONSTRUCTION
REPLACEMENT SCHOOL CONSTRUCTION 115,504 116,504 +136,000 252,504 +136,000
REPLACEMENT FACILITY CONSTRUCTION 23,935 23,935 23,935
REPLACEMENT / NEW EMPLOYEE HOUSING 1,000 1,500 +2,500 4,000 +2,500
EMPLOYEE HOUSING REPAIR 13,589 13,595 13,595
FACILITIES IMPROVEMENT & REPAIR 95,302 96,353 +110 +9,715 106,178 +9,825
TRIBAL COLLEGES FACILITIES IMPROVEMENT & REPAIR 15,000 16,000 16,000
TOTAL, EDUCATION CONSTRUCTION 264,330
267,887 +110 +148,215 416,212 +148,325
EDUCATION CONSTRUCTION Supplemental [To'Hajiilee Community School]
90,465 -90,465
TOTAL, EDUCATION CONSTRUCTION w/ Supplemental
264,330 358,352 +110 +148,215 416,212 +57,860
TOTAL, DIRECT APPROPRIATED FUNDS 1,281,931 1,401,439 +25,635 -1,935 +185,462 1,610,601 +209,162
TOTAL Direct, Other Transfers
-50,280
TOTAL Direct, Supplemental [To'Hajiilee Community School]
90,465 -90,465
TOTAL, DIRECT APPROPRIATED FUNDS w/ Supplemental
1,231,651 1,491,904 +25,635 -1,935 +185,462 1,610,601 +118,697
Funding Availability Key:
2-Year
15 Months starting July 1 [Forward Funded]
No-Year
For a full description of funding authorities and distribution methodologies used for these programs, please visit the following links:
26 IAM 3: Distribution of Resources PDF
Attachments to 26 IAM 3: Distribution of Resources
BIE-ST-2
Tribal Priority Allocations
2022
Enacted
2023
Enacted
2024
Fixed
Costs
(+/-)
2024
Internal
Transfers
(+/-)
2024
Program
Changes
(+/-)
2024
President's
Budget
Request
Change from
2023 (+/-)
INCREASES:
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 21,198 21,570 +91 -1,031 +2,000 22,630 +1,060
TOTAL, TPA PROGRAM INCREASES 21,198 21,570 +91 -1,031 +2,000 22,630 +1,060
OTHER:
POST SECONDARY PROGRAMS
Tribal Colleges & Universities Supplements (TPA) 1,220 1,220 - - - 1,220 -
Scholarships & Adult Education (TPA) 40,541 43,549 +239 -343 - 43,445 -104
TOTAL, TPA PROGRAM OTHER 41,761 44,769 239 -343 - 44,665 -104
TOTAL, TPA PROGRAMS 62,959 66,339 +330 -1,374 +2,000 67,295 +956
Evaluation of Tribal Priority Allocations Distribution: Tribal Priority Allocations (TPA) fund basic Tribal services, such as Johnson-O'Malley Assistance Grants, Tribal Colleges
and Universities Supplements, and Scholarships and Adult Education. TPA gives Tribes the opportunity to further Indian Self-Determination by establishing their priorities and
reallocating Federal funds among programs in this budget category. The table below details the program changes to TPA in the FY 2024 budget.
Dollars in Thousands ($000)
Bureau of Indian Education Tribal Priority Allocations Summary
BIE-ST-3
FY 2024 Fixed Costs Summary
Dollars in Thousands ($000)
Bureau/Account
Change
in Pay
Days
Total FY 2024
Pay Raise
2024
FERS Employer
Cont. Increase
Working
Capital
Fund
Workers
Comp.
Unemployment
Comp.
GSA and
non-GSA
Rent
FY 2024
Total
Fixed Costs
Budget
Operation of Indian Education Programs 2,240 21,520 733 1,032 - - 25,525
Operation of Indian Education Programs 1,104 13,913 733 1,032 - - 16,782
Other Teachers 1,076 6,854 - - - - 7,930
OIEP 638 Employees 60 753 - - - - 813
Construction 8 102 - - - - 110
Total, BIE 2,248 21,622 - 733 1,032 - - 25,635
1/
Calculations fully cover projected pay rate increases for teachers at BIE-operated and Tribally Controlled schools consistent with the Defense Department Overseas Teachers Pay and Personnel Act (Public Law 86-91).
BIE-ST-4
Bureau of Indian Education Budget At A Glance
Dollars in Thousands ($000)
ACCOUNT
ACTIVITY
Sub Activity
Description
2022
Enacted
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
President's
Budget
Request
OPERATION OF INDIAN EDUCATION PROGRAMS
ELEMENTARY & SECONDARY PROGRAMS (forward funded) 638,865 706,185 +11,743 - +24,921 742,849
ISEP Formula Funds
440,784 481,636 +7,930 - +19,091 508,657
Provides for approximately $7,250 per WSU for School Year 2024 -2025
[+19,091]
ISEP Program Adjustments
5,844 6,539 +261 - +500 7,300
Safe and Secure programs, security contracts & behavioral health counselors
[+500]
Education Program Enhancements
16,513 21,025 +606 - +500 22,131
Ensure school improvement initiatives are implemented to enhance instructional practices
that meet the needs of individual Tribes
[+500]
Tribal Education Departments
5,003 5,889 - - - 5,889
Student Transportation
59,616 70,007 +2,079 - +2,000 74,086
Provide for bus leases, fuel, maintenance, driver salaries, staff training
[+2,000]
Early Child & Family Development
21,655 25,267 +824 - - 26,091
Tribal Grant Support Costs
89,450 95,822 +43 - +2,830 98,695
Supports 100% of Tribal Grant Support Costs calculated need
[+2,830]
ELEMENTARY & SECONDARY PROGRAMS 154,362 176,557 +5,720 -1,586 +2,000 182,691
Facilities Operations
70,189 80,888 +2,630 - - 83,518
Facilities Maintenance
62,421 73,544 +2,999 - - 76,543
Juvenile Detention Center Education
554 555 -555 -
Johnson-O'Malley Assistance Grants (TPA)
21,198 21,570 +91 -1,031 +2,000 22,630
Student support & culturally relevant instruction
[+2,000]
POST SECONDARY PROGRAMS (forward funded) 113,283 127,407 +2,554 - +3,500 133,461
Haskell & SIPI (forward funded)
28,622 30,325 +2,545 - +2,000 34,870
Salaries, instructional materials, and student support
[+2,000]
Tribal Colleges & Universities (forward funded)
76,510 87,926 - - - 87,926
Tribal Technical Colleges (forward funded)
8,151 9,156 +9 - +1,500 10,665
Supports instruction at United Tribes Technical College (UTTC) & Navajo Technical
University (NTU)
[+1,500]
POST SECONDARY PROGRAMS 51,203 56,211 +239 -343 - 56,107
Tribal Colleges & Universities Supplements (TPA)
1,220 1,220 - - - 1,220
Scholarships & Adult Education (TPA)
40,541 43,549 +239 -343 - 43,445
Special Higher Education Scholarships
4,992 4,992 - - - 4,992
Science Post Graduate Scholarship Fund
4,450 6,450 - - - 6,450
EDUCATION MANAGEMENT 59,888 67,192 +5,269 -6 +6,826 79,281
Program Management
36,063 39,291 +3,369 -6 +1,150 45,569
Support administrative priorities, salaries, and training
34,808 35,855 [+1,500] 40,368
Labor-Related Payments
74 25 +1,032 - - 1,057
Intra-Governmental Payments
1,181 3,411 +733 - 4,144
Education IT
23,825 27,901 +135 - +5,676 33,712
Supports ongoing costs of distance learning, enhanced use of technology in the classroom,
learning management system, and bandwidth in schools
[+5,676]
TOTAL, OPERATION OF INDIAN EDUCATION PROGRAMS 1,017,601 1,133,552 +25,525 -1,935 +37,247 1,194,389
OIEP Transfer to OIP BIA
- -
- - -
TOTAL, OPERATION OF INDIAN EDUCATION PROGRAMS
(w/ supplemental and transfers)
1,017,601 1,133,552 +25,525 -1,935 +37,247 1,194,389
BIE-ST-5
ACCOUNT
ACTIVITY
Sub Activity
Description
2022
Enacted
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
President's
Budget
Request
EDUCATION CONSTRUCTION
REPLACEMENT SCHOOL CONSTRUCTION
115,504 116,504 - - +136,000 252,504
Replacement Projects
[+136,000]
REPLACEMENT FACILITY CONSTRUCTION
23,935 23,935 - - - 23,935
REPLACEMENT / NEW EMPLOYEE HOUSING
1,000 1,500 - - +2,500 4,000
Housing Projects
[+2,500]
EMPLOYEE HOUSING REPAIR
13,589 13,595 - - - 13,595
Housing repair projects
-
FACILITIES IMPROVEMENT & REPAIR
95,302 96,353 +110 - +9,715 106,178
Deferred maintenance & capital improvement projects
[+9,715]
TRIBAL COLLEGES FACILITIES IMPROVEMENT & REPAIR
15,000 16,000 - - - 16,000
TOTAL, EDUCATION CONSTRUCTION 264,330 267,887 +110 - +148,215 416,212
EDUCATION CONSTRUCTION Supplemental [To'Hajiilee Community School] 90,465
TOTAL, BUREAU OF INDIAN EDUCATION 1,281,931 1,401,439 +25,635 -1,935 +185,462 1,610,601
TOTAL, Direct, Supplemental [To'Hajiilee Community School]
- 90,465
- - - -
TOTAL, BUREAU OF INDIAN EDUCATION
(w/ other transfers)
1,281,931 1,491,904 +25,635 -1,935 +185,462 1,610,601
BIE-ST-6
Bureau of Indian Education
Employee Count by Grade
(Total Employment)
Employee Count by Grade
2022
Prior Year Actual
2023
Current Year Estimate
2024
Budget Year Estimate
Executive Level V ………………………………
0 0 0
SES ……………………….……………………
4 7 2
Subtotal ……………………….………………
4 7 2
GS/GM -15 ……………………….……………
18 21 25
GS/GM -14 ……………………….……………
27 34 40
GS/GM -13 ……………………….……………
95 112 120
GS -12 ……………………….…………………
68 80 85
GS -11 ……………………….…………………
97 92 102
GS -10 ……………………….…………………
2 1 4
GS - 9 ……………………….…………………
31 24 30
GS - 8 ……………………….…………………
2 5 5
GS - 7 ……………………….…………………
29 34 30
GS - 6 ……………………….…………………
14 12 14
GS - 5 ……………………….…………………
55 38 42
GS - 4 ……………………….…………………
0 0 1
GS - 3 ……………………….…………………
2 1 0
GS - 2 ……………………….…………………
0 0 0
GS - 1 ……………………….…………………
0 0 0
Subtotal ……………………….…………………
440 454 498
CE / CY - 16 to 24….....................................
170 158 165
CE / CY - 9 to 15….......................................
664 624 642
CE / CY - 1 to 8….........................................
1,793 1,849 1,905
Subtotal ……………………….…………………
2,627 2,631 2,712
Other Pay Schedule Systems ……………………
63 53 62
Total employment (actuals & estimates) ……
3,134 3,145 3,274
BIE-ST-7
Compliance with Section 403
Section 403 of Pub.L. 117-328, Consolidated Appropriations Act, 2023, includes a requirement to
disclose program assessments used to support Government-wide, departmental, or agency initiatives
or general operations. The general provision states:
SEC. 403. The amount and basis of estimated overhead charges, deductions, reserves, or holdbacks,
including working capital fund charges, from programs, projects, activities and subactivities to support
government-wide, departmental, agency, or bureau administrative functions or headquarters, regional, or
central operations shall be presented in annual budget justifications and subject to approval by the
Committees on Appropriations of the House of Representatives and the Senate. Changes to such estimates
shall be presented to the Committees on Appropriations for approval.
Burden Rate on Reimbursable Contract and Agreements
The Office of Management and Budget (OMB) Circular A-25 and the Statement of Federal Financial
Accounting Standards (SFFAS) No. 4 require Federal agencies to assess a burden rate (user charge) on
reimbursable contracts and agreements, where agencies act in the capacity of a service provider.
Beginning in FY 2007, Indian Affairs included a burden rate to be applied to all new reimbursable
agreements initiated in FY 2007 and thereafter. The rate for each new fiscal year is re-calculated and re-
issued before the start of the new fiscal year.
Agreements requiring the application of a burden assessment rate include all reimbursable agreements,
with certain exceptions, between Indian Affairs (IA) and other Federal agencies, State and local
governments, the public, and other Department of the Interior agencies. Exceptions to the policy include
reimbursable agreements that result in compacts, contracts, and grants awarded pursuant to 25 USC 5301
et seq. (Pub.L. 93-638 the Indian Self Determination and Education Assistance Act), and reimbursable
agreements received under the authority of 25 U.S.C. 318a (Pub.L. 70-520 The Federal Highway Act), as
amended by 23 U.S.C. 202 (Pub.L. 112-141 Moving Ahead for Progress in the 21st Century Act and
Pub.L.114-94 Fixing America’s Surface Transportation Act of 2015). In addition, the burden rate does
not apply to authority received from the Department of Education for programs operated through the
Bureau of Indian Education (BIE) and to grants awarded to BIE by other Federal agencies or State
institutions to support BIE programs, and funds received by BIE from State agencies for the
administration of the Food Services Program. All funds received from a Tribal government are exempt
from the burden assessment.
Furthermore, the burden rate does not apply to Intra-agency/Inter-agency Personnel Agreements
established to detail an IA employee to another Federal, State, local or Tribal government, nor does it
apply to emergency supplemental agreements and Wildfire Management-Fire Suppression
reimbursements. Finally, construction agreements for the benefit of a Tribe/school, cost-shared
administrative support agreements, travel expenses, or award payments to an IA employee are exempt
from the burden rate assessment and TAAMS-related efforts, i.e., training, program enhancements, and
program support.
BIE-ST-8
BIE-ST-9
Program Assessments
In FY 2024, IA may assess no more than 1.5 percent to programs within the Operation of Indian
Programs and Operation of Indian Education Programs accounts for certain administrative costs that
support emergent, unfunded government-wide, departmental, and IA efforts performed at regional or
central offices such as direct lease shortfalls, union representation/labor relations, ethics program support,
and common use charges.
Department of the Interior Working Capital Fund Charges and Deductions
The following table summarizes data for collections paid to the Department under the Working Capital
Fund (WCF) centralized and direct billings.
WORKING CAPITAL FUND BILLING
FY 2024 President's Budget
BUREAU OF INDIAN EDUCATION
($ in thousands)
2023 Estimate 2024 Estimate
Activity Central Direct TOTAL Central Direct TOTAL
OS Shared Services
60.9 0.0 60.9 67.0 0.4 67.4
OS Activities
1,587.5 182.7 1,770.2 2,016.1 159.4 2,175.5
IT Shared Services
707.2 2,179.8 2,887.0 998.7 2,459.0 3,457.7
Interior Business Center
1,067.4 707.7 1,775.1 1,085.1 424.0 1,509.1
TOTAL, WCF Billing* 3,423.0 3,070.2 6,493.2 4,166.9 3,042.8 7,209.7
*Numbers may not add due to rounding.
Authorizing Statutes
BUREAU OF INDIAN EDUCATION
Authorizing Statutes
BIE-AUTH-1
General Authorization
25 U.S.C. 13 (The Snyder Act of November 2, 1921), 42 Stat. 208, Pub.L. 67-85; 90 Stat. 2233,
Pub.L. 94-482.
25 U.S.C. 461 et seq. (The Indian Reorganization Act of 1934), 48 Stat. 984, Pub.L. 73-383;
Pub.L. 103-263.
25 U.S.C. 450 (The Indian Self-Determination and Education Assistance Act), 88 Stat. 2203,
Pub.L. 93-638, Pub.L. 100-472; 102 Stat. 2285, Pub.L. 103-413.
25 U.S.C. 452 (The Johnson-O'Malley Act of April 16, 1934), 48 Stat. 596, Pub.L. 73-167; 108 Stat.
2512, Pub.L. 103-332; Pub.L. 115-404 as amended Johnson-O'Malley Supplemental Indian Education
Program Modernization Act.
In addition to the general authorizations listed above, the following programs have specific authorizing
legislation as shown below:
OPERATION OF INDIAN EDUCATION PROGRAMS
Education
School Operations 20 U.S.C. 6301 et seq. (The Elementary and Secondary Education Act of
1965), Pub.L. 89-10, Pub.L. 103-382.
20 U.S.C. 7401 et seq. (The No Child Left Behind Act of 2001),
Pub.L. 107-110, Authorized through 2007 and replaced by ESSA
(2015).
25 U.S.C. 2001-2020 (The Education Amendments Acts of 1978) 92
Stat. 2143, Pub.L. 95-561, as amended.
25 U.S.C. 2501 et seq. (The Tribally Controlled Schools Act of 1988),
102 Stat. 385, Pub.L. 100-297, as amended.
Pub.L. 114-95, The Every Student Succeeds Act (ESSA) of 2015
(Elementary and Secondary Education Act (ESEA) reauthorization)
Additional Authority Pub. L. 112-74 (Consolidated Appropriations Act, 2012) 125 Stat. 1009-
1010; 25 U.S.C. § 2000, note.
Pub.L. 114-113, Consolidated Appropriations Act, 2016
25 U.S.C. 452 (The Johnson-O'Malley Act of April 16, 1934), 48 Stat.
596, Pub.L. 73-167; 108 Stat. 2512, Pub.L. 103-332; Pub.L. 115-404 as
BUREAU OF INDIAN EDUCATION
Authorizing Statutes
BIE-AUTH-2
amended Johnson-O'Malley Supplemental Indian Education Program
Modernization Act.
25 U.S.C. 2008 (The Quarter Blood Amendment) 99 Stat, 1747,
Pub.L. 99-228; Pub.L. 101-301
P.L 113-76, Consolidated Appropriations Act, 2014, for the Fiscal Year
Ending September 30, 2014.
Continuing Education 20 U.S.C. 1001 et seq. (The Higher Education Act of 1965)
Pub.L. 89-329, as amended, Pub.L. 102-325, 105-244, 110-315.
25 U.S.C. 1801 et seq. (Tribally Controlled Colleges or Universities
Assistance Act of 1978) Pub.L. 95-471, as amended, Pub.L. 105-244,
Sec 901, 122 Stat. 3078, Pub.L. 110-315.
25 U.S.C. 640a-640c-3 (Navajo Community College Act of 1971) 85
Stat. 646, Pub.L. 92-189, 122 Stat. 3468, Pub.L. 100-315, as amended,
Authorized through 2014.
General Administration
Administration Chief Financial Officers Act of 1990, Pub. L. 101-577, 101st Congress-
Second Session.
EDUCATION CONSTRUCTION
Facility Construction 25 U.S.C. 631(2)(12)(14) (The Act of April 19, 1950), 64 Stat. 44,
Pub.L. 81-474, 72 Stat. 834, Pub.L. 85-740.
25 U.S.C. 465 (The Act of June 18, 1934), 48 Stat. 984, Pub.L. 73-383.
25 U.S.C. 2503 (b) Composition of Grants; Special rules; title I of the
Elementary and Secondary Education Act of 1965; the Individuals with
Disabilities Education Act; or any Federal education law other than title
XI of the Education Amendments of 1978.
25 U.S.C. 2507 (e) Pub.L. 100-297, Title V. 5208, as added
Pub.L. 107-110, Title X, 1043, 115 Stat. 2076.
25 U.S.C. 2005 (b) Section 504 of the Rehabilitation Act of 1973 and
with the American Disabilities Act 1990.
OPERATION AND MAINTENANCE OF QUARTERS
BUREAU OF INDIAN EDUCATION
Authorizing Statutes
BIE-AUTH-3
O & M Quarters
5 U.S.C. 5911, Federal Employees Quarters and Facilities Act of August
20, 1964, Pub.L. 88-459, Pub.L. 98-473; Pub.L. 100-446
Administrative Provisions
Appropriation Language
DEPARTMENT OF THE INTERIOR
BUREAU OF INDIAN EDUCATION
ADMINISTRATIVE PROVISIONS
The Bureau of Indian Affairs and the Bureau of Indian Education may carry out the operation of Indian
programs by direct expenditure, contracts, cooperative agreements, compacts, and grants, either directly
or in cooperation with States and other organizations.
Notwithstanding Public Law 87–279 (25 U.S.C. 15), the Bureau of Indian Affairs may contract for
services in support of the management, operation, and maintenance of the Power Division of the San
Carlos Irrigation Project.
Notwithstanding any other provision of law, no funds available to the Bureau of Indian Affairs or the
Bureau of Indian Education for central office oversight and Executive Direction and Administrative
Services (except Executive Direction and Administrative Services funding for Tribal Priority Allocations,
regional offices, and facilities operations and maintenance) shall be available for contracts, grants,
compacts, or cooperative agreements with the Bureau of Indian Affairs or the Bureau of Indian Education
under the provisions of the Indian Self-Determination Act or the Tribal Self-Governance Act of 1994
(Public Law 103–413).
In the event any tribe returns appropriations made available by this Act to the Bureau of Indian Affairs
or the Bureau of Indian Education, this action shall not diminish the Federal Government's trust
responsibility to that tribe, or the government-to-government relationship between the United States and
that tribe, or that tribe's ability to access future appropriations.
Notwithstanding any other provision of law, no funds available to the Bureau of Indian Education, other
than the amounts provided herein for assistance to public schools under 25 U.S.C. 452 et seq., shall be
available to support the operation of any elementary or secondary school in the State of Alaska.
No funds available to the Bureau of Indian Education shall be used to support expanded grades for any
school or dormitory beyond the grade structure in place or approved by the Secretary of the Interior at
each school in the Bureau of Indian Education school system as of October 1, 1995, except that the
Secretary of the Interior may waive this prohibition to support expansion of up to one additional
grade when the Secretary determines such waiver is needed to support accomplishment of the mission of
the Bureau of Indian Education, or more than one grade to expand the elementary grade structure for
Bureau-funded schools with a K-2 or K-4 grade structure on October 1, 1996. Appropriations made
available in this or any prior Act for schools funded by the Bureau shall be available, in accordance with
the Bureau's funding formula, only to the schools in the Bureau school system as of September 1, 1996,
and to any school or school program that was reinstated in fiscal year 2012. Funds made available under
this Act may not be used to establish a charter school at a Bureau-funded school (as that term is defined in
section 1141 of the Education Amendments of 1978 (25 U.S.C. 2021)), except that a charter school that is
in existence on the date of the enactment of this Act and that has operated at a Bureau-funded school
before September 1, 1999, may continue to operate during that period, but only if the charter school pays
to the Bureau a pro rata share of funds to reimburse the Bureau for the use of the real and personal
property (including buses and vans), the funds of the charter school are kept separate and apart from
BIE-PROV-1
BIE-PROV-2
Bureau funds, and the Bureau does not assume any obligation for charter school programs of the State in
which the school is located if the charter school loses such funding. Employees of Bureau-funded schools
sharing a campus with a charter school and performing functions related to the charter school's operation
and employees of a charter school shall not be treated as Federal employees for purposes of chapter 171
of title 28, United States Code.
Notwithstanding any other provision of law, including section 113 of title I of appendix C of Public Law
106–113, if in fiscal year 2003 or 2004 a grantee received indirect and administrative costs pursuant to a
distribution formula based on section 5(f) of Public Law 101–301, the Secretary shall continue to
distribute indirect and administrative cost funds to such grantee using the section 5(f) distribution
formula.
Funds available under this Act may not be used to establish satellite locations of schools in the Bureau
school system as of September 1, 1996, except that the Secretary may waive this prohibition in order for
an Indian tribe to provide language and cultural immersion educational programs for non-public schools
located within the jurisdictional area of the tribal government which exclusively serve tribal members, do
not include grades beyond those currently served at the existing Bureau-funded school, provide an
educational environment with educator presence and academic facilities comparable to the Bureau-funded
school, comply with all applicable Tribal, Federal, or State health and safety standards, and the
Americans with Disabilities Act, and demonstrate the benefits of establishing operations at a satellite
location in lieu of incurring extraordinary costs, such as for transportation or other impacts to students
such as those caused by busing students extended distances: Provided, That no funds available under this
Act may be used to fund operations, maintenance, rehabilitation, construction, or other facilities-related
costs for such assets that are not owned by the Bureau: Provided further, That the term "satellite school"
means a school location physically separated from the existing Bureau school by more than 50 miles but
that forms part of the existing school in all other respects.
Funds made available for Tribal Priority Allocations within Operation of Indian Programs and Operation
of Indian Education Programs may be used to execute requested adjustments in tribal priority allocations
initiated by an Indian Tribe.
BIE Justification of Proposed Language Changes
Administrative Provisions
1. Addition of the following wording: or K-4
…except that the Secretary of the Interior may waive this prohibition to support expansion of up
to one additional grade when the Secretary determines such waiver is needed to support
accomplishment of the mission of the Bureau of Indian Education, or more than one grade to
expand the elementary grade structure for Bureau-funded schools with a K-2 or K-4 grade
structure on October 1, 1996.
Justification of change: Current annual appropriations language for the Bureau of Indian
Education (BIE) limits the expansion of more than one grade to BIE-funded schools with a
kindergarten through second grade (K-2) structure. The proposed language (in bold) would
BIE-PROV-3
authorize the
expansion of more than one grade to BIE-funded schools with a K-2 or K-4
structure. Tribal communities have requested this change in BIE’s Administrative Provisions
language to accommodate K-4 schools’ intent to serve additional Indian students and support
their local communities. This proposal will improve BIE’s capability to deliver educational
services to the Tribal communities it serves. The expansion authority provided by this change will
alleviate reported hardships in some communities where current grade limitations results in
families needing to seek alternate educational services not available in immediate Tribal
communities.
Operation of Indian
Education Programs
BIE-OIEP-1
DEPARTMENT OF THE INTERIOR
BUREAU OF INDIAN EDUCATION
Appropriation Language Sheet
Operation of Indian Education Programs
For expenses necessary for the operation of Indian education programs, as authorized by law, including
the Snyder Act of November 2, 1921 (25 U.S.C. 13), the Indian Self-Determination and Education
Assistance Act of 1975 (25 U.S.C. 5301 et seq.), the Education Amendments of 1978 (25 U.S.C. 2001–
2019), and the Tribally Controlled Schools Act of 1988 (25 U.S.C. 2501 et seq.), [$1,133,552,000]
$1,194,389,000 to remain available until September 30, [2024] 2025, except as otherwise provided
herein: Provided, That federally recognized Indian tribes and tribal organizations of federally recognized
Indian tribes may use their tribal priority allocations for unmet welfare assistance costs: Provided further,
That not to exceed [$833,592,000] $876,310,000 for school operations costs of Bureau-funded schools
and other education programs shall become available on July 1, [2023] 2024, and shall remain available
until September 30, [2024] 2025: Provided further, That notwithstanding any other provision of law,
including but not limited to the Indian Self-Determination Act of 1975 (25 U.S.C. 5301 et seq.) and
section 1128 of the Education Amendments of 1978 (25 U.S.C. 2008), not to exceed [$95,822,000]
$98,695,000 within and only from such amounts made available for school operations shall be available
for administrative cost grants associated with grants approved prior to July 1, [2023] 2024: Provided
further, That in order to enhance the safety of Bureau field employees, the Bureau may use funds to
purchase uniforms or other identifying articles of clothing for personnel. (Department of the Interior,
Environment, and Related Agencies Appropriations Act, 2023.)
Summary of Requirements
Bureau of Indian Education
OPERATION OF INDIAN EDUCATION PROGRAMS
(Dollars in Thousands)
OPERATION OF INDIAN EDUCATION PROGRAMS
2022
Enacted
2022 Actuals
Total
FTE 2023 Enacted
2023 Enacted
Total
FTE
2024 Request
Fixed Costs
(+/-)
2024 Request
Internal
Transfers
(+/-)
2024 Request
Program
Changes
(+/-)
2024 Request
Program
Changes
(+/-)
FTE 2024 Request
2024 Request
Total
FTE
2024 Request
TOTAL Change
from 2023
(+/-)
OPERATION OF INDIAN EDUCATION PROGRAMS
ELEMENTARY & SECONDARY PROGRAMS (forward funded)
638,865 1,397 706,185 1,829 +11,743 - +24,921 +82 742,849 1,911 +36,664
ELEMENTARY & SECONDARY PROGRAMS
154,362 340 176,557 407 +5,720 -1,586 +2,000 - 182,691 407 +6,134
POST SECONDARY PROGRAMS (forward funded)
113,283 151 127,407 157 +2,554 - +3,500 +4 133,461 161 +6,054
POST SECONDARY PROGRAMS
51,203 - 56,211 - +239 -343 - - 56,107 - -104
EDUCATION MANAGEMENT
59,888 208 67,192 190 +5,269 -6 +6,826 +43 79,281 233 +12,089
SUPPLEMENTAL
170
Total, OPERATION OF INDIAN EDUCATION PROGRAMS
1,017,601 2,266 1,133,552 2,583 +25,525 -1,935 +37,247 +129 1,194,389 2,712 +60,837
BIE-OIEP-2
Exhibit Instructions
Bureau of Indian Education
Operation of Indian Education Programs
Justification of Fixed Costs Changes
(Dollars In Thousands)
Fixed Cost Element
2023 Enacted
Total or Change
2023 Enacted to 2024
Request
Change Description
Change in Number of Paid Days
-2,153 +2,240
This reflects changes in pay associated with the change in the number
of paid days between 2023 and 2024. 2024 has one day more than
2023.
Pay Raise
+18,165 +21,520
The President's Budget for 2024 includes one quarter of the 4.6% pay
raise for 2023 and three quarters of a planned 5.2% pay raise for 2024.
Employer Share of Federal Employee
Retirement System (FERS)
0 0
This column reflects no budgeted increase to the employer contribution
to the Federal Employee Retirement System and a 0.6% increase to the
employer contribution for the Law Enforcement Federal Employees
Retirement System.
Departmental Working Capital Fund (WCF)
+2,230 +733
The change reflects the final 2024 Central Bill approved by the Working
Capital Fund Consortium.
Workers' Compensation Payments
-49 +1,032
The amounts reflect final chargeback costs of compensating injured
employees and dependents of employees who suffer accidental deaths
while on duty. Costs for 2024 will reimburse the Department of Labor,
Federal Employees Compensation Fund, pursuant to 5 U.S.C. 8147(b) as
amended by Public Law 94-273.
Account Total Fixed Cost
+25,525
BIE-OIEP-3
Bureau of Indian Education
Operation of Indian Education Programs
Justification of Internal Realignments
(Dollars In Thousands)
Internal Realignments and Non-Policy/Program Changes (Net-Zero)
BY 2024
(+/-) Description
Juvenile Detention Center Education
-555
Juvenile Detention Center Educaiton transfer from BIE to
BIA.
Johnson-O'Malley Assistance Grants (TPA)
-1,031
Transfers to/from various programs within BIA OIP and BIE
OIEP to reflect Tribal reprioritization and subsequent
redistribution of base funding as directed by tribes and
regional field sites as a result of Indian Self-Determination
and the associated authority to spend base funds best to meet
the specific needs of individual Tribal organizations.
Scholarships & Adult Education (TPA)
-343
Transfers to/from various programs within BIA OIP and BIE
OIEP to reflect Tribal reprioritization and subsequent
redistribution of base funding as directed by tribes and
regional field sites as a result of Indian Self-Determination
and the associated authority to spend base funds best to meet
the specific needs of individual Tribal organizations.
Program Management
-6
Transfers to/from various programs within BIA OIP and BIE
OIEP to reflect Tribal reprioritization and subsequent
redistribution of base funding as directed by tribes and
regional field sites as a result of Indian Self-Determination
and the associated authority to spend base funds best to meet
the specific needs of individual Tribal organizations.
Net Account Total, Internal Transfers
-1,935 0
BIE-OIEP-4
BIE-OIEP-5
OPERATION OF INDIAN EDUCATION PROGRAMS
Dollars in Thousands ($000)
Sub activity
Program Element
2022
Enacted
2023
Enacted
2024
Change
from 2023
(+/-)
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
Budget
Request
ELEMENTARY & SECONDARY
PROGRAMS (forward funded) 638,865 706,185 +11,743 +24,921 742,849 +36,664
ISEP Formula Funds
440,784
481,636
+7,930
+19,091
508,657
+27,021
ISEP Program Adjustments
5,844
6,539
+261
+500
7,300
+761
Education Program Enhancements
16,513
21,025
+606
+500
22,131
+1,106
Tribal Education Departments
5,003
5,889
5,889
Student Transportation
59,616
70,007
+2,079
+2,000
74,086
+4,079
Early Child & Family Development
21,655
25,267
+824
26,091
+824
Tribal Grant Support Costs
89,450
95,822
+43
+2,830
98,695
+2,873
FTE
1,397
1,829
+82
1,911
+82
ELEMENTARY & SECONDARY
PROGRAMS 154,362 176,557 +5,720 -1,586 +2,000 182,691 +6,134
Facilities Operations
70,189 80,888 +2,630 83,518 +2,630
Facilities Maintenance
62,421 73,544 +2,999 76,543 +2,999
Juvenile Detention Center Education
554
555
-555
-555
Johnson-O'Malley Assistance Grants
(TPA) 21,198 21,570 +91 -1,031 +2,000 22,630 +1,060
FTE
340
407
407
POST SECONDARY PROGRAMS
(forward funded)
113,283
127,407
+2,554
+3,500
133,461
+6,054
Haskell & SIPI
28,622
30,325
+2,545
+2,000
34,870
+4,545
Tribal Colleges & Universities
76,510
87,926
87,926
Tribal Technical Colleges
8,151
9,156
+9
+1,500
10,665
+1,509
FTE
151
157
+4
161
+4
POST SECONDARY PROGRAMS
51,203 56,211 +239 -343 56,107 -104
Tribal Colleges & Universities
Supplements (TPA) 1,220 1,220 1,220
Scholarships & Adult Education (TPA)
40,541 43,549 +239 -343 43,445 -104
Special Higher Education Scholarships
4,992
4,992
4,992
Science Post Graduate Scholarship Fund
4,450
6,450
6,450
FTE
BIE-OIEP-6
Sub activity
Program Element
2022
Enacted
2023
Enacted
2024
Change
from 2023
(+/-)
Fixed
Costs
(+/-)
Internal
Transfer
s (+/-)
Program
Changes
(+/-)
Budget
Request
EDUCATION MANAGEMENT
59,888 67,192 +5,269 -6 +6,826 79,281 +12,089
Education Program Management
36,063 39,291 +5,134 -6 +1,150 45,569 +6,278
Program Management
34,808 35,855 +3,369 -6 +1,150 40,368 +4,513
Labor-Related Payments
74 25 +1,032 1,057 +1,032
Intra-Governmental Payments
1,181 3,411 +733 4,114 +733
Education IT
23,825 27,901 +135 +5,676 33,712 +5,811
FTE
208 190 +43 233 +43
TOTAL, OPERATION OF
INDIAN EDUCATION
PROGRAMS
1,017,601 1,133,552 +25,525 -1,935 +37,247 1,194,389 +60,837
FTE 2,096 2,583 +129 2,712 +129
The BIE 2024 budget request supports the Biden-Harris Administration’s commitment to invest in Native
education for the 2024-2025 school year. These resources are complemented by additional investments in
BIE schools through the budget request for the Department of Education. In addition, in 2024, BIE will
continue to leverage $850.0 million made available through the American Rescue Plan (ARP). These no-
year funds continue to support schools in their efforts to ensure safe and healthy learning environments
while undertaking various post-pandemic recovery and learning initiatives.
2024 Activities
Improving educational opportunities and service delivery for Native American students from their
earliest years through college.
Providing Indian Student Equalization Program (ISEP) resources to support school operational
requirements, staffing and non-pay operating costs.
Investing in transformative education information technology to support school connectivity and
remote learning requirements.
Expanding early childhood and family development services, including expanding Native
Language Development programs.
Meeting the Tribal Grant Support Cost needs of school leaders operating Tribally Controlled
Schools.
Supporting initiatives that include funding a Pathways Program Coordinator to attract high
quality applicants to BIE internships and careers, funding a School Operations Self-
Determination Office to serve Tribal stakeholders, and continuing to support a Justice40 position
to support investments in climate and clean energy for disadvantaged communities we serve.
Justification of 2024 Program Changes
The 2024 budget request for Operation of Indian Education Programs is $1,194,389,000 and 2,712 FTE,
a program change of +$37,247,000 and +129 FTE from the 2023 Enacted level.
BIE-OIEP-7
Elementary & Secondary Programs (Forward Funded) (+$24,921,000 / +82 FTE)
Indian School Equalization Program (ISEP) Formula Funds (+$19,091,000 / +62 FTE) - The 2024
budget request supports the Administration’s commitment to invest in Native education, and the
Presidential Initiative to Advance Racial Equity and Support for Underserved Communities (Executive
Order 13985) by providing eligible Indian students with a quality education. This funding will provide
approximately $7,250 per Weighted Student Unit for School Year 2024-2025 up from $6,865 in School
Year 2023-2024.
ISEP Program Adjustments (+$500,000 / +1 FTE) - The 2024 requested increase in ISEP Program
Adjustments will provide schools with resources for targeted projects to improve student achievement by
expanding educational opportunities, providing behavioral health services to students, and continuing the
Safe and Secure Schools programs, which seeks to ensure all students at BIE-funded schools have access
to educational opportunities in a safe learning environment and the necessary mental and behavioral
health supports to assist them as they work to succeed.
Education Prog
ram Enhancements (+$500,000 / +15 FTE) - The 2024 requested increase in Education
Program Enhancements supports critical services and necessary resources to meet the unique needs and
priorities of individual Tribes and their schools. Increased funding is vital to ensuring school
improvement initiatives can be implemented to enhance instructional practices that meet individual tribal
needs and provide the best possible educational opportunities for Indian children.
Student Transpor
tation (+$2,000,000 / +4 FTE) - The 2024 budget includes essential investments in
student transportation needs to cover the increased costs for bus leases, fuel, maintenance, vehicle
replacement, and driver salaries, along with staff training for bus drivers and transportation managers.
Tribal Grant
Support Costs (+$2,830,000 / 0 FTE):
In keeping with the President’s focus on honoring our commitments to Indian country, the 2024 budget
request supports 100% of Tribal Grant Support Costs calculated need.
Elementary & Secondary Programs (+$2,000,000 / 0 FTE):
Juvenile Detention Center Education (-$555,000 / 0 FTE):
This change is an internal transfer only. IA proposes to transfer this funding for Juvenile Detention
Center education to the BIA Public Safety and Justice program. These funds support education activities
in BIA detention centers. Funding is currently appropriated to the BIE, which then transfers the funds to
the BIA Office of Justice Services for allocation to detention centers. By transferring these funds for
direct appropriations to the BIA Office of Justice Services, it will reduce the time it takes to make these
funds available for use at the juvenile detention centers.
Johnson-O’Malley (JOM) Assistance Grants (TPA) (+$2,000,000 / 0 FTE) - The 2024 budget increase
will provide eligible students under the new Student Count with the necessary resources to meet their
unique and specialized educational needs. Beginning with the 2024 JOM distribution, and in accordance
with the JOM Modernization Act, BIE will begin basing the annual JOM distribution on the actual count
BIE-OIEP-8
of JOM eligible students within a JOM contractor's tribal service area or school district. The 2024
distribution will be based on the 2022-2023 school year student counts. The JOM Assistance Grants
(TPA) increase will ensure American Indian and Alaska Native students who attend public schools with
an existing JOM contractor's tribal service area or public school district continue to receive remedial
instructions, counseling and parental involvement, language, and other culturally relevant programs that
allow them to receive an education on the same level as non-Indian students.
Post-Secondary Programs (Forward Funded) (+$3,500,000 / +4 FTE)
Haskell & SIPI (Forward Funded) (+$2,000,000 / +4 FTE) - The 2024 requested increase will provide
the two bureau-operated post-secondary schools much needed funding to allow them to properly serve
Indian students from federally recognized Tribes. The program pays for instruction, dormitories,
administration, staff, supplies, materials, and textbooks. The schools strive to offer high-quality
education to American Indians and Alaska Natives with culturally sensitive curricula and innovative
services and a commitment to academic excellence.
Tribal Technical Colleges (Forward Funded) (+$1,500,000 / 0 FTE) - The 2024 requested increase
will support Tribal Technical Colleges’ operational expenses and promote the economic development
plans of the Tribes. The program supports core functions (e.g., classroom instruction and school
operations) at the two colleges partially funded by BIE.
Education Management (+$6,826,000 / +43 FTE)
Education Program Management (+$1,150,000 / +41 FTE) - The 2024 budget will strengthen BIE as
an independent bureau by prioritizing hiring that targets capacity building and addresses support gaps in
these key areas:
Information technology
Facilities management
Grants administration
Acquisition roles in improving our service delivery, procurement, and program support to
stakeholders
Through this activity, the BIE provides management activities crucial for effective operations, including
data collection, analysis, reporting, coordinated fiscal management, risk assessments with corrective
actions, targeted monitoring activities, technical assistance, certain financial and accounting functions,
coordination and preparation of grant applications, and reporting.
Education IT (+$5,676,000 / +2 FTE) - Increased funding will support new educational information
technology (IT) operational capabilities, including infrastructure improvements in connectivity for
learning, to improve the quality of distance and in-person instruction post-pandemic. The increase will
enhance service and acquisition support work on BIE’s education Learning Management System (eLMS)
initiative; increase bandwidth in schools; and support effective eLMS planning for both classroom and
distance learning. Priorities in 2024 will include:
BIE-OIEP-9
Upgrade 83 BIE school circuits. Per our quarterly report to Congress, the current objective for
bandwidth at schools is to reach 300Mbps per student and teacher. The upgrade is expected to be
completed by the summer of 2024.
Select, award, integrate, and implement a shared Education Learning Management System
(eLMS).
Establish life-cycle management policies and plans for in-school networks, including a
LAN/WAN hardware technical refresh.
Collaborate with the Deputy Assistant Secretary Management (DAS-M) and the Assistant Chief
Information Officer (ACIO) to design and build an initial education program for IT managers and
staff cadre.
Bureau of Indian Education Overview:
Education Activities
The Elementary and Secondary (forward funded) activity provides the primary funding for the core
operational functions of the BIE school system: educational programs (including the base ISEP),
supplemental programs (such as ISEP Program Adjustments and Education Program Enhancements),
transportation, security, and school administration. These funds are forward funded and executed between
July 1 of the appropriation year and September 30 of the following appropriation year.
The Elementary/Secondary activity includes facilities operations and maintenance funds and support
programs for individual students. Funds are distributed at the beginning of the fiscal year and expendable
for 24 months. Collectively, the Elementary and Secondary (forward funded) and Elementary/Secondary
activities support a total of 183 elementary schools, secondary schools, and residential and peripheral
dormitories across 23 States; 128 schools are Tribally controlled under Pub.L. 93-638 Indian Self
Determination and Education Assistance Act contracts or Pub.L. 100-297 Tribally Controlled Grant
Schools Act, and 55 schools are operated by the BIE. The BIE elementary and secondary school system
serves 45,779 individual students with a calculated three-year Average Daily Membership (ADM) of
40,271 students.
The Post-Secondary (forward funded) activity provides funding to 29 Tribal colleges and universities, two
Tribal technical colleges, and BIE’s two post-secondary institutions: Haskell Indian Nations University
(Haskell) and Southwestern Indian Polytechnic Institute (SIPI). The funds are provided in July of the
appropriation year and available through the following appropriation year.
The Post-Secondary activity includes supplemental funding for Tribal colleges and universities.
BIE-OIEP-10
BIE-Funded Operations by Category
Type Unit
FY 2022
FY 2022
FY 2022
Total
Count
Tribally
Operated
BIE
Operated
Family and Child Education Centers
52
35
17
Elementary and Secondary Schools
183
128
55
Day Schools
118
90
28
Dormitories
14
13
1
Boarding Schools
44
22
22
Off Reservation Boarding Schools
7
3
4
Post-Secondary Schools
33
31
2
BIE-Operated Schools
2
0
2
Tribal Colleges and Universities Grants
29
29
0
Tribal Technical Colleges
2
2
0
The Education Management activity consists of Education Program Management and Information
Technology. The primary goal of Education Management is to optimize learning opportunities for students
of all ages. This activity represents just over five percent of total funding (including all funding provided
to BIE by the Department of Education) for BIE educational activities. Education Management supports
Associate Deputy Director (ADD) and School Operations staff at BIE’s Education Resource Centers in
their role providing direct and customized technical assistance.
Funding Sources
The 2024 request for BIE elementary and secondary school operations is $925,540,000. BIE provides
approximately 78 percent of the total funding for BIE-funded schools. In addition, the Department of
Education will transfer funds to educate and provide services to students attending BIE-funded
elementary and secondary schools. BIE serves in a State Education Agency capacity and administers and
oversees the Department of Education’s programs in BIE-funded schools.
Schools al
so receive competitive grants directly from the Department of Education and other Federal
agencies, such as the Federal Communication Commission’s E-Rate program and the U.S. Department of
Agriculture’s Free and Reduced Meals programs.
BIE-OIEP-11
The 2024 request for Pos
t-Secondary subactivities is $189,568,000, which supports the two colleges
operated by BIE, administers grants for 29 Tribal colleges and universities, and funds two Tribal technical
colleges.
FUNDS PROVIDED BY THE DEPARTMENT OF EDUCATION IN 2022
(School Year 2022 2023)
Type
Amount $
Description
Individuals with Disabilities
Education Act, Pub.L. 94-142, as
amended by Pub.L. 105-17, Part B,
Section 611(a) (1)
$80,004,489
This program ensures all children with disabilities receive a
free appropriate education that provides special education
and related services designed to meet their unique needs and
prepare them for further education, employment, and
independent living. Funds provide these students, ages five
to 21, with supplemental special education and related
services through an Individual Education Plan.
Education of Homeless Children
and Youth (McKinney-Vento
$1,140,000
This program is intended to ensure homeless children and
youths have access to the education and other services they
BIE-OIEP-12
FUNDS PROVIDED BY THE DEPARTMENT OF EDUCATION IN 2022
(School Year 2022 2023)
Type Amount $ Description
Homeless Assurance Act), Pub.L.
114-95
need to meet the same challenging academic achievement
standards to which all students are held.
Title I Part A Education for the
Disadvantaged, Pub.L. 114-95
$122,722,614
This program is intended to help ensure all children have the
opportunity to obtain a high-quality education and reach
proficiency on challenging performance standards. Funds
may be used for supplemental services and activities, most
commonly for instruction in reading and mathematics, to
raise student achievement.
School Improvement Title II Part
A Teacher Quality Improvement,
Pub.L. 114-95
$10,847,300
This program increases student achievement by elevating
teacher and principal quality through recruitment, hiring, and
retention strategies, and using scientifically based
professional development interventions, and holds districts
and schools accountable for improvements in student
academic performance. Funds are used for a wide array of
interventions.
Title IV Part B 21
st
Century
Community Learning Centers,
Pub.L. 114-95
$8,252,390
During non-school hours or periods, this program provides
students and their families with services for academic
enrichment, including tutorials and other services to help
students, particularly those who attend low-performing
schools, to meet State and local student academic
achievement standards.
Title VI Part B Rural Education,
Pub.L. 114-95
$487,500
This program provides additional funds to rural districts that
serve concentrations of poor students. A Local Education
Agency (LEA) eligible to receive funds under the Small,
Rural School Achievement program may not participate in
the Rural and Low-Income School Program.
Title VII Indian Education Act,
Formula Grants to LEA’s Pub.L.
114-95
$1,723,915
This program provides funds to meet the unique educational
and culturally related academic needs of American Indian
and Alaska Native students to meet the same challenging
State student academic achievement standards as all other
students.
Comprehensive Literacy State
Development
1
Title 1
Demonstration Authority, Part E,
Pub.L. 114-95
$960,000
The purpose of the Comprehensive Literacy State
Development discretionary grants is to create a
comprehensive literacy program to advance literacy skills
including pre-literacy skills, reading, and writing for
students from birth through grade 12, including limited-
English-proficient students and students with disabilities.
Title IV, Part A S7tudent Support
and Academic Enrichment Grant
$6,368,0000
This program provides funds to provide students with a well-
rounded education, including programs such as college and
career counseling, STEM, arts, civics, and International
Baccalaureate/Advanced Placement; supports safe and
health students with comprehensive school mental health,
drug, and violence prevention, training in trauma-informed
practices, and health and physical education; and supports
BIE-OIEP-13
FUNDS PROVIDED BY THE DEPARTMENT OF EDUCATION IN 2022
(School Year 2022 2023)
Type Amount $ Description
the effective use of technology that is backed by professional
development, blended learning, and education tech devices.
Title VI, Part A Subpart 1
Improving Academic
Achievement, Accountability,
Grants for State & Enhanced
Assessments
$1,845,500
This program helps develop the assessments required under
the NCLBA and supports collaborative efforts with
institutions of higher education or research institutions to
improve the quality of assessments.
Total $234,351,708
Department of Education amounts represent funds distributed to schools only and does not include Department of
Education Indian set-aside funding, which is distributed directly to Tribes, Tribal organizations, Tribal colleges, and
Tribal universities.
1
Prior year amount. Program previously known as Striving Readers.
Actvity/Subactivity: Elementary and Secondary Programs (Forward
Funded)
Dollars in Thousands ($000)
Activity/ Subactivity/
Program Element
2022
Actual
2023
Enacted
2024
Fixed
Costs
(+/-)
2024
Internal
Transfers
(+/-)
2024
Program
Changes
(+/-)
2024
Request
Change
from
2023
Enacted
(+/-)
Elementary and secondary
(forward funded)
ISEP Formula Funds $ 440,784 481,636 +7,930 0 +19,091 508,657 +27,021
FTE 1,191 1,573 0 0 +62 1,635 +62
ISEP Program Adjustments $ 5,844 6,539 +261 0 +500 7,300 +761
FTE 11 10 0 0 +1 11 +1
Education Program
Enhancements $
16,513 21,025 +606 0 +500 22,131 +1,106
FTE 28 50 0 0 +15 65 +15
Tribal Education Departments
$
5,003 5,889 0 0 0 5,889 0
FTE 0 0 0 0 0 0 0
Student Transportation $ 59,616 70,007 +2,079 0 +2,000 74,086 +4,079
FTE 121 127 0 0 +4 131 +4
BIE-OIEP-14
Early Childhood and Family
Development $
21,655 25,267 +824 0 0 26,091 +824
FTE 46 69 0 0 0 69 0
Tribal Grant Support Costs $ 89,450 95,822 +43 0 +2,830 98,695 +2,873
FTE 0 0 0 0 0 0 0
Activity Total $ 638,865 706,185 +11,743 0 +24,921 742,849 +36,664
FTE 1,397 1,829 0 0 +82 1,911 +82
Summary of 2024 Program Changes for
Elementary and Secondary (Forward Funded)
Program Changes: ($000) FTE
ISEP Formula Funds +19,091 +62
ISEP Program Adjustment +500 +1
Education Program Enhancements +500 +15
Tribal Education Departments +0 +0
Student Transportation +2,000 +4
Early Child & Family Development +0 +0
Tribal Grant Support Costs +2,830 +0
TOTAL Program Changes +24,921 +82
Justification of 2024 Program Changes
The 2024 budget request for the Elementary and Secondary forward funded is $742,849,000 and 1,911
FTE, a program change of +$24,921,000 and +82 FTE from 2023.
Indian School Equalization Program (ISEP) Formula Funds (+$19,091,000 / +62 FTE) - The 2024
budget request supports the Administration’s commitment to invest in Native education, and the
Presidential Initiative to Advance Racial Equity and Support for Underserved Communities (Executive
Order 13985) by providing eligible Indian students with a quality education. This funding will provide
approximately $7,250 per Weighted Student Unit for School Year 2024-2025 up from $6,865 in School
Year 2023-2024.
ISEP Program Adjustments (+$500,000 / +1 FTE) - The 2024 requested increase in ISEP Program
Adjustments will provide schools with resources for targeted projects to improve student achievement by
expanding educational opportunities, providing behavioral health services to students, and continuing the
Safe and Secure Schools programs.
Education Program Enhancements (+$500,000 / +15 FTE)
- The 2024 requested increase in
Education Program Enhancements supports critical services and necessary resources to meet the
unique needs and priorities of individual Tribes and their schools. Increased funding is vital to
ensuring school improvement initiatives can be implemented to enhance instructional practices
BIE-OIEP-15
that meet individual tribal needs and provide the best possible educational opportunities for
Indian children.
Student Tran
sportation (+$2,000,000 / +4 FTE) - The 2024 budget includes essential investments in
student transportation needs to cover the increased costs for bus leases, fuel, maintenance, vehicle
replacement, and driver salaries, along with staff training for bus drivers and transportation managers.
Tribal Grant
Support Costs (+$2,830,000 / 0 FTE)
The 2024 budget request supports 100% of Tribal
Grant Support Costs calculated need.
Elementary and Secondary Programs (Forward Funded) Overview
ISEP Formula Funds ($508,657,000 / 1,635 FTE) - The ISEP formula funds serve as the primary
funding source for educational programs at BIE-funded elementary and secondary schools. These funds
are the single most significant component of BIE funding and are provided directly to schools. Funds
cover most of the costs of running elementary and secondary education programs, including teacher and
administrative salaries, basic instruction, gifted and talented programs, residential programs, food
services, and summer programs. In School Year (SY) 2023-2024, this funding will support an estimated
47,000 individual students with a calculated 40,271 Average Daily Membership (ADM) at BIE schools
and dormitories.
The ISEP distr
ibution is based on the number of students attending school and their academic needs. In
calculating ISEP funding, BIE first determines a school’s ADM. The ADM is based on the attendance of
students during the entire year. The ADM is adjusted for the special academic needs of students, as well
as for other purposes, in order to arrive at a Weighted Student Unit (WSU). The distribution of ISEP
funding is based on the number of WSUs at each school. The ISEP formula provides additional funding
for schools with residential programs. Please see the table on ISEP Formula Funding methodology in this
chapter and Appendix 1. In response to COVID-19 impacts on school closures, BIE received blanket
waiver authority to maintain pre-pandemic student counts for SY 2022-2023 to determine formula
funding levels. Starting in 2024 the blanket waiver will not be extended automatically to all BIE funded
schools, individual schools still experiencing hardships in enrollment will be allowed to request a waiver
for their student count. Student counts for schools with waivers will continue to keep pre-pandemic 3
year rolling averages calculated in the ISEP Formula Funding method.
The proposed leve
l of funding for SY 2024-2025 is projected to provide an estimated $7,250.47 per
WSU. In SY 2022-2023, the most recent year with funds distribution data, the majority of funding, $326
million or 74.7 percent, is being used for basic education programs, including $29.7 million or 6.8 percent
for language development programs and $13.3 million or 3.0 percent for programs for gifted and talented
students. An additional $59.8 million or 13.7 percent is expended for residential and dormitory costs,
with the remaining funding allocated for small school adjustments and school boards.
BIE-OIEP-16
ISEP FORMULATION METHODOLOGY
The formula for ISEP funding distribution is driven by the student count at a school for the entire
school year, referred to as the Average Daily Membership (ADM), and a Weighted Student Unit
(WSU) for each school. The WSU is calculated by weighting ADM for each school to account for the
school's requirement for special services including basic education, language development, gifted and
talented programs, and residential requirements. There are also weights for small schools, the grade
levels at a school, and any supplemental education programs the school offers due to student need.
The WSU is then averaged with the two previous years' WSU data to arrive at a three-year rolling
average, which is used in all calculations.
Distribution of ISEP funding is based on a dollar amount per WSU, which is calculated by dividing the
ISEP formula funds by the total WSU after deductions are made to the ISEP funds as authorized by the
Hawkins-Stafford Elementary and Secondary School Improvement Amendments of 1988, Pub.L. 100-
297, as amended. The law stipulates that one percent of ISEP funding be set aside for contingencies at
BIE schools, after which any remaining balance is distributed to schools via the formula.
Average Daily
Membership
Actual Actual Actual Actual Estimate Estimate
SY 19-20 SY 20-21 SY 21-22 SY 22-23 SY 23-24 SY 24-25
Single-year ADM 40,008 40,030 40,030 40,030 TBD TBD
3-year rolling average
ADM
40,464 40,624 40,624 40,271 40,271 40,271
Distribution of FY 2022 Funding for SY 2022 - 2023
ISEP Funding and Weighted Student Units by Program
Program/Weighting Factor
Weighted Student Unit (WSU)
Three Year
Average WSU
ISEP Funding @
$6,
283
1
per WSU
($000)
Basic Instructional 51,871.04 325,906
Language Development 4,730.22 29,720
Gifted & Talented 2,117.45 13,304
Total Educational Programs 58,718.71 368,930
Small School Adjustment & Isolation Factor 877.06 5,511
School Board 63.6 400
Subtotal Instruction 940.66 5,911
Dormitory and Boarding 9,512.76 59,769
Small School Residential Adjustment 530.54 3,333
School Board 1.2 8
Subtotal Dormitory & Boarding 10,044.50 63,110
Total 69,703.87 437.951
1
Funding per WSU based on annual appropriations minus one percent of the total ISEP funding for
contingencies as authorized by law.
BIE-OIEP-17
ISEP Program Adjustments ($7,300,000 / +11 FTE) - The ISEP Program Adjustments funding enables
BIE-funded schools to respond to specific findings of need or deficiencies. The 2024 budget request will
fund existing contracts at schools under the Safe and Secure Schools program and improve student
achievement by meeting the specific needs or deficiencies, providing behavioral health services to students,
and salaries for behavioral health counselors.
Education Prog
ram Enhancements ($22,131,000 / 65 FTE) - The Education Program Enhancement
subactivity enables BIE to provide critical services and necessary resources to meet the unique needs and
priorities of individual Tribes and their schools. The Education Resource Centers utilize the
Enhancement Program to fund professional development and technical assistance at all levels of the BIE
school system to improve student outcomes.
Each ADD and ERC w
orks in close cooperation with Tribes and the schools they serve, both BIE
operated and Tribally controlled, designing, and implementing customized programs and providing
necessary resources to meet the unique needs and priorities of individual Tribes and their schools. The
ADDs also cooperate closely with Tribes and schools to provide standard assessments and support school
improvement initiatives for academic staff to enhance their instructional practices, culture programs, and
curriculum materials. BIE supports efforts to revitalize and maintain Native languages and expand the use
of language immersion programs in its schools. The BIE is providing $7,500,000 to BIE-funded schools
to expand existing language immersion programs or create new programs, as part of their existing
operations, that will lead to Native language oral proficiency.
Tribal Education Departments ($5,889,000 / +0 FTE) - Many Tribes have established, or are interested
in establishing, their own Tribal Education Departments (TEDs). Such TEDs provide a variety of
educational services to their students. The BIE has made it its mission to support Tribal sovereignty over
education by assisting Tribes and their TEDs in building the capacity to coordinate and deliver
educational services to their respective Tribal members. The TED Program provides TEDs with critical
resources needed to strengthen the management and oversight of a Tribe’s educational programs,
including BIE-funded schools, school operations, adult education, scholarships, and other programs. For
instance, many grantee Tribes and their TEDs have used their TED program funds to research, draft, and
establish comprehensive Tribal education codes that align with the Tribe’s educational vision in
accordance with BIE standards.
Student Transpor
tation ($74,086,000 / 131 FTE) - Regular daily attendance is critical to student
achievement. Students who do not attend class on a regular basis are at a significantly higher risk of low
academic performance. The BIE Transportation funds are used to pay for bus leases, fuel, maintenance,
vehicle replacement, driver salaries, and staff training for bus drivers and transportation managers.
Unlike tradition
al school systems, BIE-funded schools are spread across 23 States and are largely
located in rural and geographically remote areas. Due to the dispersion of students over wide distances,
the total number of miles students are transported is significantly higher than in metropolitan areas.
In addition,
BIE Transportation funds also cover the commercial costs of transporting students to boarding
schools within the BIE school system at the beginning and end of each school year; some students are
BIE-OIEP-18
provided an additional round trip home at mid-year. Distribution of BIE’s Transportation funding is
based on the number of miles driven and actual commercial transportation costs incurred.
The annual accumulated distance traveled by BIE-funded school buses totals over 14 million miles.
Approximately 15 percent of BIE’s school transportation miles are on dirt or unimproved roads. These
factors increase wear-and-tear on vehicles and result in both higher maintenance costs and shorter vehicle
life.
In response to COVID-19 impacts on school closures, BIE received blanket waiver authority to maintain
pre-pandemic mileage counts for SY 2022-2023 to determine formula funding levels for the unique
transportation needs of students and communities during the pandemic. Mileage counts will be taken at the
end of the SY 2022-2023 and the blanket waiver will no longer be extended automatically to all BIE
funded schools, individual schools still experiencing hardships will be allowed to request a waiver for
their mileage counts. Student counts for schools with waivers will continue to keep pre-pandemic
mileage counts.
Outyear projections on both mileage and commercial transportation are dependent upon on a return to
normal operations and easing of some localized travel restrictions. Detailed funding distribution by schools
is provided in Appendix 1, Student Transportation by School, including road mileage recorded at each
school.
The following table includes the mileage recorded at BIE schools annually for SY 2017-2018 through SY
2022-2023 and provides projections thereafter.
Annual Student Miles Travelled and Funding Per Mile
Year School Year
1
Annual Miles Travelled (000)
Mileage
Funding
($000)
3
Funding
Per Mile
($)
Day Student
Miles
Residential
Student
Miles
2
Total Miles
2017 2017-2018 14,717 283 15,000 51,857 $3.46
2018 2018-2019 14,675 262 14,937 52,033 $3.48
2019 2019-2020 14,343 252 14,595 52,785 $3.62
2020 2020-2021 14,312 252 14,564 54,088 $3.71
2021 2021-2022 14,312 252 14,564 55,240 $3.79
2022 2022-2023 14,312 252 14,564 58,143 $3.99
2023 2023-2024 14,312 252 14,564 59,616 $4.09
2024 2024-2025 14,312 252 14,564 74,086 $5.09
1. For calculating student transportation costs, the school year equates to the fiscal year. Due to the
COVID-19 pandemic, SY 2021-2022 used previous school year numbers. FY 2023 and 2024 are
estimates as actuals are not yet available.
2. Residential student miles will vary from year to year depending upon where the student population
domiciles are located.
BIE-OIEP-19
3. The table above does not include commercial transportation costs. In FY 2021 commercial
transportation costs, which include charter and annual airfare costs, totaled approximately $3.6
million.
Early Child and Family Development ($26,091,000 / 69 FTE) - The Early Child and Family
Development sub-activity provides BIE’s Family and Child Education (FACE) program and
implementation of early childhood activities outlined in the BIE Strategic Direction. Established in 1990,
BIE’s FACE program is designed to address the achievement gap for Indian children up to five years of
age primarily located on rural reservations by teaching preschoolers and their families the skills needed to
begin school. Services are provided in the child’s home and school centers and include early childhood
education, adult education, and parenting education. In FY 2024, the program will continue to recruit and
hire staff and instructors, maintain enrollment, and continue student and parental participation in new
FACE sites.
Early Childhood Programming Impact
School
Year
(Program
Year)
Children Served
Adults
Served
Annual
Appropriation
Funding
per
Child/
Adult
2
Parental
GED
Earned
Parental
Employm
ent
Obtained
Home
-based
Center-
based
(preschool)
Unduplicated
Number of All
FACE
Children
1
2016-
2017
1,549 672 2,221 2,108 $15,620,000 $3,608 47 406
2017-
2018
1,511 665 2,124 2,061 $18,659,000 $4,458 45 367
2018-
2019
1,582 650 2,199 2,062 $18,810,000 $4,414 16 372
2019-
2020
3
1,499 590 TBD 2,157 $18,810,000 ~ 40 372
2020-
2021
3
978 601 TBD 1,684 $18,852,000 ~ 63 236
2021-
2022
3
986 761 1,747 1,510 $21,000,000 $6,447 64 318
2022-
2023
4
986 761 1,747 1,510 $21,655,000 6,648
64 318
1
The unduplicated number counts children only once regardless of which service(s) they received. Since some
children received both home and center-based services each year, adding the figures together would result in a
misleading total.
2
Funded per Adult/Child is based upon the number of unduplicated children and the number of adults served.
3
Due to constraints of COVID and challenges with reporting, service information was not available for every
FACE enrollee in SY 2019-2020, SY 2020-2021 and SY 2021-2022. Fear of virus and vaccines for children
impacted enrollment for SY2021-2022.
4
SY 2022-2023 are estimates; the final numbers will be available in June 2023.
Tribal Grant Support Costs ($98,695,000 / +0 FTE) - A major goal of BIE is to facilitate Tribal
sovereignty over education by assisting Tribes in assuming the operation and management of BIE
BIE-OIEP-20
schools. In accordance with the Hawkins-Stafford Elementary and Secondary School Improvement
Amendments of 1988, Pub.L. 100-297, as amended by the No Child Left Behind Act, the BIE provides
administrative cost grants (subject to the availability of funds) to those Tribes which have assumed
operation and management of a BIE-funded school.
Tribal Grant
Support Costs are designed to ensure BIE provides the necessary administrative costs that
accompany the operation and management of tribally controlled elementary or secondary educational
programs.
Tribes operat
ing BIE-funded schools use these funds to cover the overhead costs of operating a school,
meet legal requirements, and carry out support functions that BIE would otherwise provide directly.
The 2024 budget request supports 100% of the calculated need.
Funds are distr
ibuted by formula according to the following methodology:
ADMINISTRATIVE COST GRANT DISTRIBUTION FORMULA
In accordance with the Hawkins-Stafford Elementary and Secondary School Improvement Amendments
of 1988, Pub.L. 100-297, as amended by the No Child Left Behind Act, individual administrative cost
grants are determined using an administrative cost percentage rate calculated by the following formula:
(Tribe Administered Program Dollars X 11%) + ($600,000 (std Direct Cost Base) X 50%)
(Tribe Administered Program Dollars) + ($600,000)
The above formula generates a percentage that is then multiplied by the tribally administered program
dollars (called the Tribal Direct Cost Base which is the total number of Federal appropriated dollars
managed by the Tribe) to calculate the dollars for the Administrative Cost Grant. The Administrative
Cost Grant equals the value generated from the formula above or a minimum amount of $200,000
regardless of the number of students (as required by the NCLB), prorated based on the availability of
funds.
Activity Accomplishments
In SY 2022 – 2023, there were 52 operating FACE programs. The BIE FACE program focuses on
identifying and assisting children who are not meeting expected development milestones through
screening. The BIE continues to support teacher certification through the National Board for Professional
Teaching Standards process.
The BIE also c
ontinues to focus on Native language development through ISEP and Education Program
Enhancements funding. In general, schools conduct classes aimed at raising Native language proficiency
during the instructional day. Schools also provide teachers with professional development to incorporate
Native language use in their classrooms and integrate language and culture into curriculum and
instruction. The ISEP funding formula generated $29.7 million for Language Development in BIE-
funded schools in SY 2021-2022 and SY 2022-2023. Under the Congressional set-aside for Native
language immersion, the BIE distributed $4.4 million grant funds in FY 2021 to 17 Bureau-funded
schools and another $5.5 million in FY 2022 to 168 Bureau-funded schools to increase Native language
proficiency by expanding or creating language immersion programs.
BIE-OIEP-21
Actvity/Subactivity: Elementary and Secondary
Programs
Dollars in Thousands ($000)
Activity/ Subactivity/
Program Element
2022
Actual
2023
Enacted
2024
Fixed
Costs
(+/-)
2024
Internal
Transfers
(+/-)
2024
Program
Changes
(+/-)
2024
Req
uest
Change
from
2023
Enacted
(+/-)
Elementary and secondary
Facilities Operations $
70,189
80,888
+2,630
0
0
83,518
+2,630
FTE
166
184
0
0
0
184
0
Facilities Maintenance $
62,421
73,544
+2,999
0
0
76,543
+2,999
FTE
174
223
0
0
0
223
0
Juvenile Detention Center
Education $
554
555
0
-555
0
0
-555
FTE
0
0
0
0
0
0
0
Johnson-O'Malley
Assistance Grants (TPA) $
21,198
21,570
+91
-1,031
+2,000
22,630
+1,060
FTE
0
0
0
0
0
0
0
Activity Total $
154,362
176,557
+5,720
-1,586
+2,000
182,691
+6,134
FTE
340
407
0
0
0
407
0
Summary of 2024 Program Changes for
Elementary and Secondary Programs
Program Changes:
($000)
FTE
Facilities Operations +0 +0
Facilities Maintenance
+0
+0
Juvenile Detention Center Education
+0
+0
Johnson-O’Malley Assistance Grants (TPA) +2,000 +0
TOTAL Program Changes +2,000 +0
Justification of 2024 Program Changes
The 2024 budget request for Elementary and Secondary programs is $182,691,000 and 0 FTE, a
program change of +$2,000,000 and 0 FTE from 2023.
Johnson-O’Malley (JOM) Assistance Grants (TPA) (+$2,000,000 / 0 FTE) - The 2024 budget increase
will provide eligible students under the new Student Count with the necessary resources to meet their
unique and specialized educational needs. Beginning with the FY 2024 JOM distribution, and in
BIE-OIEP-22
accordance with the JOM Modernization Act, BIE will begin basing the annual JOM distribution on the
actual count of JOM eligible students within a JOM contractor's tribal service area or school district. The
FY 2024 distribution will be based on the 2022-2023 school year student counts. The JOM Assistance
Grants (TPA) increase will ensure American Indian and Alaska Native students who attend public schools
with an existing JOM contractor's tribal service area or public school district continue to receive remedial
instructions, counseling and parental involvement, language, and other culturally relevant programs that
allow them to receive an education on the same level as non-Indian students.
Elementary and Secondary Programs Overview
Facilities Operations ($83,518,000 / 184 FTE) - Schools are operated and maintained in a fashion that
ensures their continued safety and usefulness for educational purposes. Facilities Operations funds the
operational expenses for 183 BIE-funded elementary and secondary schools, Haskell, and SIPI. Common
expenses for operating BIE-funded facilities include electricity, heating fuels, communications, grounds
maintenance, vehicle rental (excluding school buses), refuse collection, custodial services, pest control,
water and sewer service, fire/intrusion monitoring, and operations program administration.
Facilities Maintenance ($76,543,000 / 223 FTE) - The BIE’s Facilities Maintenance funds are used to
conduct preventive, routine, and unscheduled maintenance for buildings, equipment, utility systems, and
ground structures at 183 elementary and secondary schools and dormitories, Haskell, and SIPI. These
funds provide needed maintenance services for:
1. equipment including heating, ventilation, and air conditioning systems, boilers and other pressure
vessels, furnace, fire alarms, and sprinkler, radio repeaters, and security systems;
2. utility systems such as portable water wells, water treatment plans, and water storage tanks; and
3. horizontal infrastructure, including sidewalks, driveways, parking lots, and landscaping.
Providing adequate maintenance keeps school facilities from deteriorating and can extend the useful life
of a school facility by as much as 50 percent. Not performing essential preventive maintenance activities
or services, as required, directly accelerates the need for costly deferred maintenance projects. More
importantly, the failure of some systems due to lack of maintenance, such as fire protection systems, can
create life-threatening situations for school students, staff, and visitors. If not maintained adequately,
Federal property can place people at risk and increase Federal liabilities or create crisis situations for
schools that may prove harmful, interrupt educational programs for students, or force closure of the
school.
Juvenile Detention Center Education (-$0 / 0 FTE):
IA proposes to transfer this $555,000 for Juvenile Detention Center education to the BIA Public Safety
and Justice program. These funds support education activities in BIA detention centers. Funding is
currently appropriated to the BIE, which then transfers the funds to the BIA Office of Justice Services for
allocation to detention centers. By transferring these funds for direct appropriations to the BIA Office of
Justice Services, it will reduce the time it takes to make these funds available for use at the juvenile
detention centers.
BIE-OIEP-23
Johnson-O’Malley (JOM) Assistance Grants (TPA) ($22,630,000 / +0 FTE) - Ninety-two percent of
American Indian and Alaska Native students attend public schools. JOM funding provides such students
with the necessary resources designed to meet their unique and specialized educational needs. These
funds can provide remedial instruction, counseling, parental involvement, language, and other culturally
relevant programs to Indian students. The JOM funds are also used to cover school supplies and items
that enable recipients to participate in curricular and extra-curricular programs. JOM grant funding may
only be used for students three years of age through the 12th grade and who are enrolled in federally
recognized Tribes or students who are at least one-fourth or more degree Indian blood from a federally
recognized Tribe.
Actvity/Subactivity: Post Secondary Programs (Forward
Funded)
Dollars in Thousands ($000)
Activity/ Subactivity/
Program Element
2022
Actual
2023
Enacted
2024
Fixed
Costs
(+/-)
2024
Internal
Transfers
(+/-)
2024
Program
Changes
(+/-)
2024
Request
Change
from
2023
Enacted
(+/-)
Post secondary programs
(forward funded)
Haskell and SIPI $
28,622
30,325
+2,545
0
+2,000
34,870
+4,545
FTE
151
157
0
0
+4
161
+4
Tribal Colleges and
Universities (forward funded)
$
76,510
87,926
0
0
0
87,926
0
FTE
0
0
0
0
0
0
0
Tribal Technical Colleges
(forward funded) $
8,151
9,156
+9
0
+1,500
10,665
+1,509
FTE
0
0
0
0
0
0
0
Activity Total $
113,283
127,407
+2,554
0
+3,500
133,461
+6,054
FTE
151
157
0
0
+4
161
+4
Summary of 2024 Program Changes for
Post-Secondary Programs (Forward Funded)
Program Changes:
($000)
FTE
Haskell & SIPI (forward funded)
+2,000
+4
Tribal Colleges & Universities (forward funded) +0 +0
Tribal Technical Colleges (forward funded) +1,500 +0
TOTAL
Program Changes +3,500 +4
BIE-OIEP-24
Justification of 2024 Program Changes
The 2024 budget request for Post-Secondary forward funded programs is $133,461,000 and +161 FTE,
a program change of +$3,500,000 and +4 FTE from 2023.
Haskell & S
IPI (Forward Funded) (+$2,000,000 / +4 FTE) - The 2024 requested increase will provide
the two bureau-operated post-secondary schools much needed funding to allow them to properly serve
Indian students from federally recognized Tribes. The program pays for instruction, dormitories,
administration, staff, supplies, materials, and textbooks. The schools strive to offer high-quality
education to American Indians and Alaska Natives with culturally sensitive curricula and innovative
services and a commitment to academic excellence.
Tribal Tech
nical Colleges (Forward Funded) (+$1,500,000 / 0 FTE) - The 2024 requested increase
will support Tribal Technical Colleges’ operational expenses and promote the economic development
plans of the Tribes. The program supports core functions (e.g., classroom instruction and school
operations) at the two colleges partially funded by BIE.
Post Secondary Programs (Forward Funded) Overview
Haskell and SIPI (Forward Funded) ($34,870,000 / 161 FTE) - The BIE’s two directly operated post-
secondary institutions serve Indian students from federally recognized Tribes throughout the country.
Please see the following table for enacted and proposed distribution of funds to these two BIE-operated
post-secondary institutions, including student enrollment and graduation rates at Haskell and SIPI from
Fall Semester 2019 through Summer Semester 2022. Haskell and SIPI utilize these funds to pay for
administrative, instructional, dormitory, and other support staff, as well as supplies, materials, textbooks,
and food. Haskell and SIPI also use these funds to provide residential, athletic, and other student support
services. In addition to funding from the BIE, Haskell and SIPI are eligible for Department of Education
funds (both individual student funds and institutional funds), U.S. Department of Agriculture funding, and
competitive grants from Federal, public, and private agencies.
Haskell Indian Nations University:
Haskell is a post-secondary institution established by Federal legislation to fulfill the United States’ treaty
and trust obligations to provide a high-quality education to American Indians and Alaska Natives.
Haskell is a fully accredited university in Lawrence, KS, offering education to eligible Indian students via
culturally sensitive curricula, innovative services, and a commitment to academic excellence. Annually,
students from over 152 Tribal nations and as many as 36 States create a campus environment diverse in
Indian heritage.
Haskell mai
ntains a consortium program with the University of Kansas that permits students to apply
credits earned at either institution toward graduation requirements. The programs offered have been
identified as necessary to the development of human capital that contributes to the economic success of
native communities. Haskell offers several associate degrees in Arts (AA) and Science (AS), as well as
baccalaureate degrees in Arts (BA) and Science (BS).
BIE-OIEP-25
Southwestern Indian Polytechnic Institute:
SIPI maintains a culturally supportive educational, social, and physical environment, allowing its students
to develop marketable skills to facilitate gainful employment or transfer to a baccalaureate degree
program. Many of the programs offered at SIPI, located in Albuquerque, NM, meet a specific need
determined by labor market data and consultation between Tribes and its board of regents. SIPI serves
American Indian and Alaska Native students from over 84 nations and as many as 25 states. SIPI further
serves federally recognized Tribes by developing and conducting competitive programs for workforce
needs, extension, and outreach programs, including high-impact community-based programs, workshops,
seminars, and distance learning courses. SIPI has leveraged technology with Go2Orientation and
Go2Distance Learning, which provides online orientation and helps navigate courses through a distance
learning environment.
SIPI and Haskell Funding (FY 2020 - FY 2024 Request)
BIE Post-Secondary School FY 2020 FY 2021
FY 2022
FY 2023 FY 2024
est. (Fall 2022
Summer
2023)
est. (Fall 2023
Summer
2024)
est. (Fall 2024
Summer 2025)
Southwestern Indian Polytechnic Institute (SIPI)
# Of Students Enrolled
1
626 466 417 438 460
Graduation Rate
2
20% 16% 13% 11% 10%
Transfer Rate
2
13% 9% 11% 10% 10%
Funding ($000) $9,024 $9,979 $10,018 $10,614 $12,205
Haskell Indian Nations University (Haskell)
# Of Students Enrolled
1
824 815 900 850 860
Graduation Rate
2
43% 47% 47% 50% 51%
Transfer Rate
2
34% 36% 36% 38 % 40 %
Funding ($000) $14,724 $16,279 $18,604 $19,711 $22,665
Haskell & SIPI
TOTAL Funding ($000) $23,748 $26,258 $28,622 $30,325 $34,870
1 Enrollment counts include unduplicated headcounts for the academic year.
2 Graduation and transfer rates reflect the percentage of fall cohorts (first-time, full-time, degree-seeking
students) who graduate or transfer to another institution within 150 percent of standard time to complete. The
decline in the # of Students Enrolled and the Graduation Rate for SIPI is due to the COVID -19 Pandemic.
Tribal Colleges and Universities (Forward Funded) ($87,926,000 / 0 FTE) - Tribal Colleges and
Universities (TCUs) provide Tribal communities with the necessary resources and facilities to teach
BIE-OIEP-26
Indian students the skills they need for career success in a culturally knowledgeable context. Post-
secondary education of Tribal members is an essential component in the economic development plans of
Tribes. In many instances, TCUs are the primary means available for Tribes and Indian students to
receive a post-secondary education. Many TCUs have leveraged their BIE funding by teaming with local
and national businesses to provide training-partnership opportunities for Indian students.
During SY 2022-2023, there are 29 TCUs eligible for BIE funding under Title I of Pub.L. 95-471.
According to a formula based on the Indian Student Count (ISC), funds are distributed to these
institutions. The ISC, established in 25, U.S.C.§1801(a)(7), is the number equal to the total number of
Indian students enrolled in each tribally controlled college or university. TCUs can use these funds to pay
for operational expenses at their educational institutions. These include costs such as salaries,
instructional materials, and student support services.
The Pub.L. 99-428, authorizes BIE to provide endowment grants to TCUs. The BIE’s Endowment Grant
funding enables TCUs to develop and offer supplemental grant programs to students needing additional
financial assistance. To use BIE Endowment Grant funds, TCUs must match with a capital contribution
equal to half of the amount of the BIE’s endowment contribution. Alternatively, TCUs may meet their
contribution requirement by using personal or real property received as a donation or gift. Colleges can
obtain additional assistance from other private sector entities to help meet their endowment program
needs. Funds may be invested under the authority of Section 331(c)(2) of the Higher Education Act of
1965, as amended, and any interest earned can be used to defray expenditures associated with the
operation of the TCUs.
BIE-OIEP-27
Tribal Colleges and Universities Salient Statistics
State
FY 2021
Indian
Student
Count
FY
2022
Indian
Student
Count
7
Accreditation
1
Degrees or
Certificates
Offered
2
2021/2022
Academic
Year
Cumulative
Actual
Total
3
2021/2022
Academic
Year
Grads
4
School
Aaniiih Nakoda College MT 124 102 A 1,2,6 228 35
Bay Mills Community College MI 333 205 A 1, 2, 6 538 71
Blackfeet Community College MT 274 244 A 1, 2, 3, 6 542 57
Cankdeska Cikana
Community College
ND
216 168 A 1, 2, 3, 6 384 44
Chief Dull Knife College MT 176 188 A 1, 2, 3, 6 359 9
College of Menominee Nation WI 108 102 A 1, 2, 3, 4, 6 217 23
College of the Muscogee
Nation
OK
329 213 A 1, 2, 6 572 41
Nueta Hidatsa Sahnish
College/Fort Berthold
ND
166 130 A 1, 2, 3, 4, 6 304 29
Fort Peck Community College MT 458 475 A 1, 2, 3, 6 934 81
Ilisagvik College AK 156 95 A 1, 3, 6 251 25
Keweenaw Bay Ojibwa
Comm. College
MI
67 54 A 11, 2, 3, 121 8
Lac Courte Oreilles
Community College
WI
223 157 A 1, 2, 3, 6 406 55
Leech Lake Tribal College MN 171 154 A 1, 3, 6 325 17
Little Big Horn Community
College
MT
375 250 A 1, 2, 6 625 35
Little Priest Tribal College NE 105 87 A 1, 2 214 25
Nebraska Indian Community
College
NE
213 164 A 1, 2, 3, 6 374
14
Northwest Indian College WA 600 881 A 1, 2, 3, 4, 6 1,520 110
Oglala Lakota Community
College
SD
1148 916 A 1, 3, 4, 5, 6 2,055 152
Red Lake Nation College MN 149 126 C 1, 2 275 14
Saginaw Chippewa Tribal
College
MI
59 47 A 1 107 8
Salish Kootenai College MT 485 788 A 1, 2, 3, 4, 6 1,282 88
Sinte Gleska University SD 489 380 A 1, 2, 4, 5, 6 870 63
Sisseton Wahpeton College SD 136 137 A 1, 2, 3, 6 274 18
Sitting Bull College ND 239 234 A 1, 2, 3, 4, 6 479 64
BIE-OIEP-28
Tribal Technical Colleges (Forward Funded) ($10,665,000 / 0 FTE) - The Tribal Technical Colleges
(forward funded) program provides funding for United Tribes Technical College (UTTC) in Bismarck,
ND and Navajo Technical University (NTU) in Crownpoint, NM. The program supports core functions
(e.g., classroom instruction and school operations) at the two colleges partially funded by BIE. Tribal
technical colleges provide resources and facilities to teach community members the skills they need to
succeed in the workforce and overcome barriers to Indian higher education while supporting economic
development on their reservations. Additionally, the programs build skills and capacity needed to
promote social and environmental justice in Native American communities.
Stone Child College MT 536 0 A 1, 2, 6 536 35
Tohono O'odham Community
College
AZ
1,344 870 A 1, 2, 3, 6 2,215 59
Turtle Mountain Community
College
ND
545 498 A 1, 2, 4, 6 956 193
White Earth Tribal & Comm.
College
MN
78 62 A 1 146 14
Title I Total 9,302 7,727 17,109 1,387
Title II Institutions
Dine College AZ 1,344 870 A 1, 2, 3, 4, 6 2,215 169
TOTAL Title I & II 10,646 8,597 19,324 1,556
Notes:
1
The accreditation classifications of the colleges are either: (A) fully accredited by a recognized accrediting
association; (B) institution transfer; or (C) candidate status towards accreditation.
2
Certificates awarded include (1) Associate of Arts, (2) Associate of Science, (3) Associate of Applied Science,
(4) Bachelor of Science (5) Master of Arts, and/or (6) vocational certificates.
3
Cumulative total of Indian students attending one or more of the fall, spring, or summer terms, part-time or
full-time.
5
Latest graduation numbers available.
6
Indian Student Count (ISC) numbers are rounded.
7 COVID-19 pandemics impacts, including partial closures, and the pivot to virtual learning have resulted in
(ISC) number variations - including increases and decreases in student counts by geographic location.
BIE-OIEP-29
Actvity/Subactivity: Post Secondary
Programs
Dollars in Thousands ($000)
Activity/ Subactivity/
Program Element
2022
Actual
2023
Enacted
2024
Fixed
Costs
(+/-)
2024
Internal
Transfers
(+/-)
2024
Program
Changes
(+/-)
2024
Request
Change
from
2023
Enacted
(+/-)
Post Secondary programs
Tribal Colleges and
Universities Supplements
(TPA) $
1,220
1,220
0
0
0
1,220
0
FTE
0
0
0
0
0
0
0
Scholarships and Adult
Education (TPA) $
40,541
43,549
+239
-343
0
43,445
-104
FTE
0
0
0
0
0
0
0
Special Higher Education
Scholarships $
4,992
4,992
0
0
0
4,992
0
FTE
0
0
0
0
0
0
0
Science Post Graduate
Scholarship Fund $
4,450
6,450
0
0
0
6,450
0
FTE
0
0
0
0
0
0
0
Activity Total $
51,203
56,211
239
-343
0
56,107
-104
FTE
0
0
0
0
0
0
0
Summary of 2024 Program Changes for Post-Secondary Programs
Program Changes:
($000)
FTE
Tribal Colleges & Universities Supplements (TPA)
+0
+0
Scholarships & Adult Education (TPA)
+0
+0
Special Higher Education Scholarships
+0
+0
Science Post Graduate Scholarship Fund
+0
+0
TOTAL Program Changes
+0
+0
BIE-OIEP-30
Justification of 2024 Program Changes
The 2024 budget request for Post-Secondary programs is $56,107,000 and 0 FTE, a program change
of $0 and 0 FTE from 2023.
Post Secondary Programs Overview
Tribal Colleges & Universities Supplements (TPA) ($1,220,000 / 0 FTE) - Tribes may choose to direct
Tribal Priority Allocations (TPA) funds to supplement the operation of their TCUs. Six Tribes are
currently providing Tribal colleges with these funds. Funds are used for policy development, curriculum
additions, and general program operations designed to meet the specific needs of their community
members.
Scholarships & Adult Education (TPA) ($43,445,000 / 0 FTE) - The intent of the Scholarships and
Adult Education program is to provide funds to assist Tribes in meeting their goal of self-determination
and self-sufficiency. By providing financial assistance to eligible American Indian and Alaska Natives
students, the BIE fosters the development of educated and capable citizens that will affect positive change
in their communities. The Scholarships and Adult Education program addresses Indian Affairs’
objectives: 1) to improve communities’ quality of life by developing economies, 2) to improve the
success of students at each educational level by providing financial assistance for eligible students, and 3)
to increase students engagement with Science, Technology, Engineering, and Mathematics (STEM)
related initiatives. The program further supports the commitment to expand educational opportunities for
students.
Special Higher Education Scholarships ($4,992,000 / 0 FTE) - As Tribes seek to develop their
communities in economically disadvantaged rural areas, they require trained professionals to plan and
implement Tribal development goals. Many of these professionals need the knowledge that they can
acquire by pursuing advanced (graduate) degrees. The Special Higher Education Scholarships Program
(SHEP) is a three-pronged program that supports the commitment to education and the goals for higher
education. The first component provides supplemental financial assistance to American Indian and
Alaska Native students for graduate level study. Emphasis is placed on students pursuing the professions
of law, education, medicine, natural resources, engineering, business administration, and social work.
Over the past five years BIE has provided approximately 1,500 SHEP scholarships to well qualified
American Indian and Alaska Native students.
The second component is the Pre-Law Summer Institute (PLSI) ($500,000), an intensive two-month
summer orientation program which prepares American Indian and Alaska Native students entering the
field of law for the rigors of law school. This funding will allow approximately 35 students, plus five
returning students to work as tutors in the program. It will also provide modest need-based scholarships
for roughly 100 program graduates who are attending the first, second, or third year of law school.
Finally, it will also be used to provide need-based bar study stipends for students who need support to be
successful in studying for and passing the bar exam.
The final component is the Loan for Service Program, designed to provide financial assistance through
loans to eligible American Indian and Alaska Native degree candidates who seek employment with BIE,
BIE-OIEP-31
BIA, or a federally recognized Tribe upon graduation. To promote the expansion of career opportunities
for Indian graduates in Tribal governments and Indian Affairs, BIE began offering loans in 2005 to
students pursuing graduate and professional degrees with a “service payback” (employment) agreement.
Upon completion of their degree requirements, recipients agree to work for BIE, BIA, or a federally
recognized Tribe to repay their loans. Each academic year of funding requires one year of service. The
Loan for Service Program is designed to bring professionals to Native communities.
Science Post Graduate Scholarship Fund ($6,450,000 / 0 FTE) - The Science Post-Graduate
Scholarship Fund (SPGSF) program provides funding and awards specifically for post-secondary and
post-graduate-level fellowships and training opportunities. These awards are provided in the fields of
science, technology, engineering, and mathematics (STEM) such as agricultural, geological, and
biological and life sciences, computing, communications, networking, information technology, and
biomedical programs. Over the past five years BIE has provided approximately 750 SPGSF scholarships
to well qualified American Indian and Alaska Native students.
Advanced education in the STEM fields is in greater demand than ever before, particularly in Indian
communities. Many Tribal lands are situated on lands with great natural resource potential that require
individuals with education, skills, and expertise to sustainably develop resources. Indian students in
STEM fields often recognize the importance of reinvesting their knowledge back into their home
communities, bringing their skills back to their home Tribes or other Tribal communities. There is a high
deficiency in Tribal studentsparticipation in STEM fields and urgency for research to understand why.
A portion of the SPGSF is directed towards graduate level (masters and doctoral) research to understand
the barriers that discourage Indian student participation in these fields and to expand STEM opportunities
at Tribal Colleges and Universities.
Actvity/Subactivity: Education
Management
Dollars in Thousands
($000)
Activity/ Subactivity/
Program Element
2022
Actual
2023
Enacted
2024
Fixed
Costs
(+/-)
2024
Internal
Transfers
(+/-)
2024
Program
Changes
(+/-)
2024
Req
uest
Change
from
2023
Enacted
(+/-)
Education Management
Education Program
Management $
36,063 39,291 +5,134 -6 +1,150 45,569 +6,278
Program Management $ 34,808 35,855 +3,369 -6 +1,150 40,368 +4,513
BIE-OIEP-32
FTE 200 169 0 0 +41 210 +41
Labor-Related Payments $ 74 25 +1,032 0 0 1,057 +1,032
FTE 0 0 0 0 0 0 0
Intra-Governmental
Payments $
1,181 3,411 +733 0 0 4,144 +733
FTE 0 0 0 0 0 0 0
Education IT $ 23,825 27,901 +135 0 +5,676 33,712 +5,811
FTE 8 21 0 0 +2 23 +2
Activity Total $ 59,888 67,192 +5,269 -6 +6,826 79,281 12,089
FTE 208 190 0 0 +43 233 +43
Summary of 2024 Program Changes for
Education Management
Request Component ($000) FTE
Education Program Management +1,150 +41
Education IT +5,676 +2
TOTAL Program Changes +6,826 +43
Justification of 2024 Program Changes
The 2024 budget request for Education Management programs is $79,281,000 and 223 FTE, a program
change of +$6,826,000 and +43 FTE from 2023.
Education Program Management (+$1,150,000 / +41 FTE) - The 2024 budget will strengthen BIE as
an independent bureau by prioritizing hiring that targets capacity building and addresses support gaps in
these key areas:
Information technology
Facilities management
Grants administration
Acquisition roles in improving our service delivery, procurement, and program support to
stakeholders
Through this activity, the BIE provides management activities crucial for effective operations, including
data collection, analysis, reporting, coordinated fiscal management, risk assessments with corrective
actions, targeted monitoring activities, technical assistance, certain financial and accounting functions,
coordination and preparation of grant applications, and reporting.
Education IT (+$5,676,000 / +2 FTE) - Increased funding will support new educational information
technology (IT) operational capabilities, including infrastructure improvements in connectivity for
learning, to improve the quality of distance and in-person instruction post-pandemic. The increase will
enhance service and acquisition support work on BIE’s education Learning Management System (eLMS)
initiative; increase bandwidth in schools; and support effective eLMS planning for both classroom and
distance learning. Priorities in 2024 will include:
Upgrade 83 BIE school circuits. Per our quarterly report to Congress, the current objective for
bandwidth at schools is to reach 300Mbps per student and teacher. The upgrade is expected to be
completed by the summer of 2024.
Select, award, integrate, and implement a shared Education Learning Management System
(eLMS).
Establish life-cycle management policies and plans for in-school networks, including a
LAN/WAN hardware technical refresh.
Collaborate with the Deputy Assistant Secretary Management (DAS-M) and the Assistant Chief
Information Officer (ACIO) to design and build an initial education program for IT managers and
staff cadre.
Education Management Overview
Education Program Management (EPM) ($45,569,000 / 210 FTE) - The BIE is required to execute a
wide variety of management activities. Support services include data collection, analysis, reporting,
coordinated fiscal management, risk assessments with corrective actions, targeted monitoring activities,
technical assistance, certain financial and accounting functions, coordination and preparation of grant
applications, and reporting. BIE will continue implementing the BIE Strategic Direction and Reform
efforts, increasing accountability and transparency throughout the Bureau.
Education Program Management initiatives in 2024 include the continued implementation of a School
Operations Office of Self-Determination to develop Tribal capacity and promote maximum Indian
participation in educational programs and services; the Justice40 Initiative to promote environmental
justice; and BIE’s Social Emotional Learning project to develop a national curriculum to support
behavioral health and wellness programs at BIE-funded schools. The funding in 2024 will also allow
EPM to calculate and report on methodologies for maximizing the benefits to underserved communities.
Education IT ($33,712,000 / 23 FTE) - The BIE information technology (IT) requirements encompass
the multiple and varied needs of students, administrators, teachers, and Headquarters staff. The BIE IT
infrastructure includes the wide area network (WAN) and general support system used by BIE-funded
schools. This infrastructure supports the ability to provide standards-based connectivity, security, content
delivery, web services, distance learning, wireless communication, email access, and education
application access for all BIE school networks. Education IT funding also provides for the BIE student
information data system. The system provides school management software, training, and system support
for management of student academic program data. This centralized database manages records such as
enrollment, attendance, behavior, class schedules, grades, assessments, teacher grade books, health and
immunization data, special education needs, transcripts, parent contact information, and student
BIE-OIEP-33
BIE-OIEP-34
demographics for all students in BIE-funded schools. This funding also supports BIE’s cybersecurity
efforts in the detection, investigation, and remediation of cyber threats.
In 2024, BIE continues to invest and support the education Learning Management System (eLMS)
platform, providing BIE schools access to distance learning and enhanced use of technology in the
classroom. The eLMS and its underlying technology enhance BIE’s system by supporting and delivering
a comprehensive online delivery of educational courses to students and providing professional growth and
opportunities for bureau-funded teachers.
Education Construction
BIE-CONST-1
DEPARTMENT O
F THE INTERIOR
BUREAU OF INDI
AN EDUCATION
Appropriati
on Language Sheet
Education C
onstruction
For construction, repair, improvement, and maintenance of buildings, utilities, and other facilities
necessary for the operation of Indian education programs, including architectural and engineering services
by contract; acquisition of lands, and interests in lands; [$267,887,000] $416,212,000 to remain available
until expended: Provided, That in order to ensure timely completion of construction projects, the
Secretary of the Interior may assume control of a project and all funds related to the project, if, not later
than 18 months after the date of the enactment of this Act, any Public Law 100–297 (25 U.S.C. 2501, et
seq.) grantee receiving funds appropriated in this Act or in any prior Act, has not completed the planning
and design phase of the project and commenced construction. (Department of the Interior, Environment,
and Related Agencies Appropriations Act, 2023.)
[For an addi
tional amount for "Education Construction", $90,465,000, to remain available until expended,
for necessary expenses related to the consequences of flooding at the To'Hajiilee Community School.]
(Disaster Relief Supplemental Appropriations Act, 2023.)
BIE-CONST-2
Appropriation Language Citations
BUREAU OF INDIAN EDUCATION
Education Construction
General Authorization
25 U.S.C. 13 (The Snyder Act of November 2, 1921) is the basic authority under which the Secretary provides
services, including construction of facilities, to support operating programs to federally recognized
Tribes. This Act also provides for the enlargement, extension, improvement, and repair of the buildings
and grounds of existing plants and projects. In addition, most of the major projects have specific
authorizations.
1. For construction and maintenance of buildings, utilities, and other facilities.
For construction, repair, and improvement of all Indian Affairs buildings, utilities, and other facilities,
including demolition of obsolete structures and consolidation of underutilized facilities, inclusive of
architectural and engineering services by contract;
25 U.S.C. 458
25 U.S.C. 2005&2006
25 U.S.C. 458 (The Indian Self-Determination and Education Assistance Act) authorizes the Secretary to
enter into a contract or contracts with any State education agency or school district for the purpose of
assisting such agency or district in the acquisition of sites for or the construction, acquisition or
renovation of facilities (including all equipment) in school districts on or adjacent to Indian reservations
or other lands held in trust, if such facilities are necessary for the education of Indians residing on any
such reservation or lands. The Secretary may not expend more than 25 percent of any funds appropriated
pursuant to this section, for use of private schools.
25 U.S.C. 2005 provides that the Secretary shall immediately begin to bring all schools, dormitories, and
other Indian education-related facilities operated by Indian Affairs or under contract or grant with Indian
Affairs in connection with the education of Indian children into compliance with all applicable Federal,
tribal, or State health and safety standards, whichever provide greater protection (except that the tribal
standards to be applied shall be no greater than otherwise applicable Federal or State standards), with
section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794), and with the Americans with Disabilities
Act of 1990, except that nothing
in this section shall require termination of the operations of any facility
which does not comply with such provisions and which is in use on October 20, 1994.
Pub. L. 107-110, 25 U.S.C.2005 provides for the development of a rule-making committee pursuant to
section 2018(b)(3).
25 U.S.C. 2005(b) (6) provides that the Secretary shall develop a Facilities Information Systems Support
Database to maintain and update the conditions of school facilities, replacement and construction need
and minor and major improvement need.
BIE-CONST-3
25 U.S.C. 2006(e) provi
des that the Assistant Secretary shall submit as part of the annual budget a plan
for school facilities to be constructed, to establish priorities among projects and for the improvement and
repair of education facilities, which shall form the basis for the distribution of appropriated funds and for
capital improvements to be made over the 5 succeeding years.
2. For the Operations and Maintenance o
f Indian Affairs facilities.
25 U.S.C. 2006
25 U.S.C. 2006(e) provi
des that the Assistant Secretary shall establish a program, including the
distribution of appropriated funds, for the operation and maintenance of education facilities.
President's Budget SUBMISSION
Summary of Requirements
Bureau of Indian Education
EDUCATION CONSTRUCTION
(Dollars in Thousands)
EDUCATION CONSTRUCTION
2022
Enacted
2022 Actual
Total
FTE 2023 Enacted
2023 Enacted
Total
FTE
2024 Request Fixed
Costs
(+/-)
2024 Request
Internal
Transfers
(+/-)
2024 Request
Program
Changes
(+/-)
2024 Request
Program Changes
(+/-)
FTE 2024 Request
2024 Request
Total
FTE
2024 Request
TOTAL Change from
2023
(+/-)
EDUCATION CONSTRUCTION
REPLACEMENT SCHOOL CONSTRUCTION
115,504 - 116,504 - - +136,000 - 252,504 - +136,000
REPLACEMENT FACILITY CONSTRUCTION
23,935 0 23,935 - - - - 23,935 0 -
REPLACEMENT / NEW EMPLOYEE HOUSING
1,000 - 1,500 - - +2,500 - 4,000 - +2,500
EMPLOYEE HOUSING REPAIR
13,589 - 13,595 1 - - - - 13,595 1 -
FACILITIES IMPROVEMENT & REPAIR
95,302 10 96,353 10 +110 - +9,715 - 106,178 13 +9,825
TRIBAL COLLEGES FACILITIES IMPROVEMENT & REPAIR
15,000 - 16,000 - - - - 16,000 - -
Total, OPERATION OF INDIAN EDUCATION PROGRAMS
264,330 10 267,887 11 +110 - +148,215 - 416,212 14 +148,325
BIE - CONST-4
Bureau of Indian Education
Justification of Fixed Costs
Dollars in Thousands ($000)
Fixed Cost Changes and Projections
2023
Total or
Change
2023 to
2024
Change
Description
Change in Number of Paid Days
-8 +8
This reflects changes in pay associated with the change in
the number of paid days between 2023 and 2024. 2024 has
one day more than 2023.
Pay Raise
+80 +102
This includes one quarter of the 4.6% pay raise for 2023 and
three quarters of the planned 5.2% pay raise for 2024.
Employer Share of Federal Employee Retirement System
+0 +0
This column reflects no budgeted increase for the employer
contribution to the Federal Employee Retirement System.
TOTAL FIXED COST CHANGES -EDUCATION
CONSTRUCTION
+110
BIE-CONST-5
BUREAU OF INDIAN EDUCATION
EDUCATION CONSTRUCTION SUMMARY
Overview
The Education Construction program carries out facility and structure projects, demolition, and
environmental compliance for education-related assets owned and funded by Indian Affairs (IA).
Within this budget request, the termIndian Affairs” is meant to include the Bureau of Indian Affairs
(BIA), the Bureau of Indian Education (BIE), and the Office of the Assistant Secretary Indian Affairs
(AS-IA). In 2024, IA will manage Education Construction activities through a Service Level Agreement
(SLA) with BIE, as BIE continues its transition to an independent bureau. BIE will work with individual
schools to improve project close-out, once needed repairs are completed and to enhance accuracy of
data and tracking of deferred maintenance needs.
IA owns or provides funding for a broad variety of Indian Education-related buildings, structures, and
other facilities including buildings with historical and architectural significance. The education inventory
includes structures such as schools, employee housing, storage sheds, fences, water and wastewater
systems, and protective structures for pumping systems and other critical sensitive assets.
The IA Facilities Investment Review Board (IA-FIRB) is the governing body that makes executive-level
decisions regarding the construction and leasing portfolio in support of the Department's missions, goals,
and objectives. The IA-FIRB meets quarterly to consider proposed projects, review the status of ongoing
major capital investments, and provide oversight for adherence to budget, schedule and return on
investment. Following Department approval, construction projects are prioritized and incorporated into the
Five-Year Deferred Maintenance and Construction plan. School construction and repair projects, in
addition to advance planning and design work, are accomplished through Pub.L. 100–297 (25 U.S.C. 2501
et. seq.) grants or Pub.L. 93–638 (25 U.S.C. 5301 et. seq.) subpart J agreements, or through Federal
Acquisition Regulation (FAR) contracts.
Asset Condition Assessments
IA conducts Facility Condition Assessments (FCAs) to complete a comprehensive condition assessment and
inventory validation of all IA-owned real property assets on a three-year cycle. Deficiencies are identified and
tracked in the IA Facilities Management System (IA-FMS) as Deferred Maintenance (DM) for the building
or structure. The FCA report and any identified DM are uploaded into IA-FMS for potential future
construction project funding. IA shares the completed report with site and BIA Regional authorities who are
responsible for managing the respective assessed facilities. The responsible authority for schools is typically
the superintendent or principal.
Facility Condition Index
The Facility Condition Index (FCI) is a standard industry measure used to compare the condition of buildings
and facilities. It is calculated by taking the deferred maintenance cost of a facility or building and dividing it
by the current replacement value. The FCI for each building is automatically calculated in IA-FMS and used
along with other criteria to allocate Education Construction funds for renovations and repairs based upon
greatest need. Based on the FCI, buildings and structures are categorized as being in good, fair, or poor
condition. The formula for calculating the FCI and the relation of the FCI to condition categorization are as
BIE-CONST-6
BIE-CONST-7
follows:
Facilities Condition Index (FCI) = Maintenance, Repair, and Replacement Deficiencies of the Facility(-ies)
Current Replacement Value of the Facility(-ies)
Facility Condition Categorization
as Measured by FCI
FCI (School
Assets)
FCI (All Others) Condition
< .0500 < .0500
Good
<= .1000 <= .1500
Fair
>.1000 >.1500
Poor
IA uses the FCI and the Asset Priority Index (API) to prioritize improvement, repair, and replacement
projects. The FCI provides a baseline from which IA measures and tracks improvements in asset
conditions and the API indicates the importance of each asset to the organization’s mission.
Education Construction Site Assessment-Capital Investment (SA-CI)
The Education Construction Site Assessment and Capital Investment Program (Education SA-CI) is now
a permanent program which allows IA to prioritize bureau funded K-12 schools based upon two sets of
criteria: their FCI; and the age of school or percent of students educated in portables. Once prioritized,
the schools then undergo a comprehensive third-party assessment of their conditions to determine a
holistic site-by-site solution to providing a safe, secure, healthy, operationally modern, and long-lasting
campus to support the BIE mission to provide quality education opportunities.
Indian Affairs Facilities Management System
The IA-FMS is the primary information management system used to track and maintain relevant facility
data for each asset. IA uses this data to plan, prioritize, and execute preventive and deferred maintenance
activities to improve the condition of the facilities. IA-FMS also enables BIE to maintain an accurate
inventory of IA real property that synchronizes with the Department of the Interior’s Financial and
Business Management System (FBMS). Information in IA-FMS is used to develop the IA Five-Year
Deferred Maintenance and Construction plan in accordance with the Department of Interior’s annual
planning and prioritization guidance for deferred maintenance and capital improvement projects. The
Plan provides IA with a strategy for addressing facilities with the greatest need with primary focus on
critical health and safety requirements. The goal of the IA Construction program is to bring all facilities
to the “fair” or “good” (acceptable) condition level.
IA also maintains a current and accurate inventory of real property in the Federal Real Property Profile
Management System (FRPP MS) which houses real property data for all Federal agencies. The FRPP
MS includes Government-wide performance metrics such as FCI and operating costs, which further
support IA and BIE management of assets.
BIE-CONST-8
Education Construction
The Education Construction program provides safe, functional, energy-efficient, and universally
accessible facilities at BIE-funded schools and dormitories through school and facility replacements, and
facility improvements and repairs. Approximately 45,000 Indian students, including 1,300 resident-only
boarders, attend the 183 BIE-funded schools and dormitories located in Indian communities in 23 States.
The Education Construction program supports BIE mission accomplishment by renovating or replacing
schools and dormitories to provide an environment conducive to quality educational achievement and
improved opportunities for Indian students. IA further provides 1,609 housing units across 87 sites to
accommodate teachers and other essential school staff.
The major activities associated with the Education Construction program are:
Replacement School Construction
Replacement Facility Construction
Replacement / New Employee Housing
Employee Housing Repair
Facility Improvement and Repair
Tribal Colleges Facility Improvement and Repair
Each program conforms to specified architectural and engineering design codes to ensure the highest
quality standards for education facilities. The design standards apply to all BIE-operated or -funded sites
throughout Indian Country and receive periodic review and updates. They apply equally to tribally or BIE-
operated programs.
Budget Schedules
The budget schedules for this account are located in the Budget Summary Tables section.
Fund
Year
Priority
Within the FY
Facility or Unit/Program Name Project Title
Cong.
District
Total Project
Cost
Funded to
Date
Funding
Request
Remaining
to be Funded
Future Years of
Plan with
Funding
Investment
Category/
Work
Classification
2024 1 Replacement School Construction Cheyenne Eagle Butte K-12 Replacement School SD - 01 TBD 115,906 TBD TBD
2024 2 Replacement School Construction Cove Day School AZ - 02 TBD 0 TBD TBD
2024 3 Replacement School Construction T’iis Nazbas Community School AZ - 01 TBD 0 TBD TBD
2024 4 Replacement School Construction Cottonwood Day School K-8 Replacement School AZ - 01 TBD 0 TBD TBD
2024 5 Replacement School Construction Little Wound School K-12 Replacement School SD - 01 TBD 0 TBD TBD
Replacement School Construction 252,504
2024 1 Replacement Facility Construction Wa He Lut Indian School WA - 10 TBD 30,830 TBD TBD
2024 2 Replacement Facility Construction San Ildefonso Day School NM - 03 TBD 0 TBD TBD
Replacement Facility Construction 23,935
2024 Replacement / New Employee Housing Multiple projects at various locations 4,000 4,000 0
Replacement / New Employee Housing 4,000
2024 Employee Housing Repair Multiple projects at various locations 13,595 13,595 0
Employee Housing Repair 13,595
2024 Program Management 8,578 8,578 0
2024 Advance Planning, Design, and Pre-construction
Pierre Indian Learning Center,
Standing Rock Community School,
Santa Rosa Day School
5,000 5,000
2024 Major Facilities Improvement and Repair Projects between $250,000 and $1 million at various locations 32,000 32,000 0
2024 Minor Facilities Improvement and Repair Projects under $250,000 at various locations 30,000 30,000 0
2024 Facility condition assessments Multiple projects at various locations 4,000 4,000 0
2024 Asset disposal Multiple projects at various locations 6,000 6,000 0
2024 Emergency repair Multiple projects at various locations 6,000 6,000 0
2024 Environmental projects Multiple projects at various locations 3,000 3,000 0
2024 Portable classrooms Multiple projects at various locations 5,000 5,000 0
2024 Energy program Multiple projects at various locations 3,000 3,000 0
2024 Education telecommunications Multiple projects at various locations 3,000 3,000 0
2024 Boiler inspections Multiple projects at various locations 500 500 0
2024 Seismic safety Multiple projects at various locations 100 100 0
Facilities Improvement and Repair 106,178
2024 Tribal Colleges Facilities Improvement & Repar Multiple projects at various locations 16,000 16,000 0
Tribal Colleges Facilities Improvement & Repair 16,000
2024 Total Education Construction 416,212
Bureau of Indian Education
Education Construction Five-Year Plan -- FY 2024 - 2028
BIE-CONST-9
Fund
Year
Priority
Within the FY
Facility or Unit/Program Name Project Title
Cong.
District
Total Project
Cost
Funded to
Date
Funding
Request
Remaining
to be Funded
Future Years of
Plan with
Funding
Investment
Category/
Work
Classification
2025 Replacement School Construction Little Wound School K-12 Replacement School SD - 01 TBD 0 TBD TBD
2025 Replacement School Construction Tse' ii' ahi (Standing Rock) Community School NM - 03 TBD 0 TBD TBD
2025 Replacement School Construction Santa Rosa Day School AZ - 07 TBD 0 TBD TBD
2025 Replacement School Construction Theodore Roosevelt School AZ - 02 TBD 0 TBD TBD
Replacement School Construction 252,504
2025 Replacement Facility Construction San Ildefonso Day School NM - 03 TBD 6,865 TBD TBD
Replacement School Construction 23,935
2025 Replacement / New Employee Housing Multiple projects at various locations 4,000 4,000 0
Replacement / New Employee Housing 4,000
2025 Employee Housing Repair Multiple projects at various locations 13,595 13,595 0
Employee Housing Repair 13,595
2025 Program Management 8,578 8,578 0
2025 Advance Planning, Design, and Pre-construction Multiple projects at various locations 5,000 5,000
2025 Major Facilities Improvement and Repair Projects between $250,000 and $1 million at various locations 32,000 32,000 0
2025 Minor Facilities Improvement and Repair Projects under $250,000 at various locations 30,000 30,000 0
2025 Facility condition assessments Multiple projects at various locations 4,000 4,000 0
2025 Asset disposal Multiple projects at various locations 6,000 6,000 0
2025 Emergency repair Multiple projects at various locations 6,000 6,000 0
2025 Environmental projects Multiple projects at various locations 3,000 3,000 0
2025 Portable classrooms Multiple projects at various locations 5,000 5,000 0
2025 Energy program Multiple projects at various locations 3,000 3,000 0
2025 Education telecommunications Multiple projects at various locations 3,000 3,000 0
2025 Boiler inspections Multiple projects at various locations 500 500 0
2025 Seismic safety Multiple projects at various locations 100 100 0
Facilities Improvement and Repair 106,178
2025 Tribal Colleges Facilities Improvement & Repar Multiple projects at various locations 16,000 16,000 0
Tribal Colleges Facilities Improvement & Repair
16,000
2025 Total Education Construction 416,212
Bureau of Indian Education
Education Construction Five-Year Plan -- FY 2024 - 2028
BIE-CONST-10
Fund
Year
Priority
Within the FY
Facility or Unit/Program Name Project Title
Cong.
District
Total Project
Cost
Funded to
Date
Funding
Request
Remaining
to be Funded
Future Years of
Plan with
Funding
Investment
Category/
Work
Classification
2026 Replacement School Construction Theodore Roosevelt School AZ - 02 TBD 0 TBD TBD
2026 Replacement School Construction Turtle Mountain Elementary School At Large TBD 0 TBD TBD
2026 Replacement School Construction Te Su Geh Oweenge (Tesuque) Day School NM - 03 TBD 0 TBD TBD
2026 Replacement School Construction Northern Cheyenne Tribal School MT - 02 TBD 0 TBD TBD
2026 Replacement School Construction TBD TBD 0 TBD TBD
Replacement School Construction 252,504
2026 Replacement Facility Construction San Ildefonso Day School NM - 03 37,000 30,800 TBD TBD
Multiple projects at various locations TBD TBD
Replacement Facility Construction 23,935
2026 Replacement / New Employee Housing Multiple projects at various locations 4,000 4,000 0
Replacement / New Employee Housing 4,000
2026 Employee Housing Repair Multiple projects at various locations 13,595 13,595 0
Employee Housing Repair 13,595
2026 Program Management 8,578 8,578 0
2026 Advance Planning, Design, and Pre-construction Multiple projects at various locations 5,000 5,000
2026 Major Facilities Improvement and Repair Projects between $250,000 and $1 million at various locations 32,000 32,000 0
2026 Minor Facilities Improvement and Repair Projects under $250,000 at various locations 30,000 30,000 0
2026 Facility condition assessments Multiple projects at various locations 4,000 4,000 0
2026 Asset disposal Multiple projects at various locations 6,000 6,000 0
2026 Emergency repair Multiple projects at various locations 6,000 6,000 0
2026 Environmental projects Multiple projects at various locations 3,000 3,000 0
2026 Portable classrooms Multiple projects at various locations 5,000 5,000 0
2026 Energy program Multiple projects at various locations 3,000 3,000 0
2026 Education telecommunications Multiple projects at various locations 3,000 3,000 0
2026 Boiler inspections Multiple projects at various locations 500 500 0
2026 Seismic safety Multiple projects at various locations 100 100 0
Facilities Improvement and Repair 106,178
2026 Tribal Colleges Facilities Improvement & Repar Multiple projects at various locations 16,000 16,000 0
Tribal Colleges Facilities Improvement & Repair
16,000
2026 Total Education Construction 416,212
Bureau of Indian Education
Education Construction Five-Year Plan -- FY 2024 - 2028
BIE-CONST-11
Fund
Year
Priority
Within the FY
Facility or Unit/Program Name Project Title
Cong.
District
Total Project
Cost
Funded to
Date
Funding
Request
Remaining
to be Funded
Future Years of
Plan with
Funding
Investment
Category/
Work
Classification
2027 Replacement School Construction Multiple projects at various locations 252,504 252,504 0
Replacement School Construction 252,504
2027 Replacement Facility Construction Multiple projects at various locations 23,935 23,935 0
Replacement Facility Construction 23,935
2027 Replacement / New Employee Housing Multiple projects at various locations 4,000 4,000 0
Replacement / New Employee Housing 4,000
2027 Employee Housing Repair Multiple projects at various locations 13,595 13,595 0
Employee Housing Repair 13,595
2027 Program Management 8,578 8,578 0
2027 Advance Planning, Design, and Pre-construction Multiple projects at various locations 5,000 5,000
2027 Major Facilities Improvement and Repair Projects between $250,000 and $1 million at various locations 32,000 32,000 0
2027 Minor Facilities Improvement and Repair Projects under $250,000 at various locations 30,000 30,000 0
2027 Facility condition assessments Multiple projects at various locations 4,000 4,000 0
2027 Asset disposal Multiple projects at various locations 6,000 6,000 0
2027 Emergency repair Multiple projects at various locations 6,000 6,000 0
2027 Environmental projects Multiple projects at various locations 3,000 3,000 0
2027 Portable classrooms Multiple projects at various locations 5,000 5,000 0
2027 Energy program Multiple projects at various locations 3,000 3,000 0
2027 Education telecommunications Multiple projects at various locations 3,000 3,000 0
2027 Boiler inspections Multiple projects at various locations 500 500 0
2027 Seismic safety Multiple projects at various locations 100 100 0
Facilities Improvement and Repair 106,178
2027 Tribal Colleges Facilities Improvement & Repar Multiple projects at various locations 16,000 16,000 0
Tribal Colleges Facilities Improvement & Repair 16,000
2027 Total Education Construction 416,212
Bureau of Indian Education
Education Construction Five-Year Plan -- FY 2024 - 2028
BIE-CONST-12
Fund
Year
Priority
Within the FY
Facility or Unit/Program Name Project Title
Cong.
District
Total Project
Cost
Funded to
Date
Funding
Request
Remaining
to be Funded
Future Years of
Plan with
Funding
Investment
Category/
Work
Classification
2028 Replacement School Construction Multiple projects at various locations 252,504 252,504 0
Replacement School Construction 252,504
2028 Replacement Facility Construction Multiple projects at various locations 23,935 23,935 0
Replacement Facility Construction 23,935
2028 Replacement / New Employee Housing Multiple projects at various locations 4,000 4,000 0
Replacement / New Employee Housing 4,000
2028 Employee Housing Repair Multiple projects at various locations 13,595 13,595 0
Employee Housing Repair 13,595
2028 Program Management 8,578 8,578 0
2028 Advance Planning, Design, and Pre-construction Multiple projects at various locations 5,000 5,000
2028 Major Facilities Improvement and Repair Projects between $250,000 and $1 million at various locations 32,000 32,000 0
2028 Minor Facilities Improvement and Repair Projects under $250,000 at various locations 30,000 30,000 0
2028 Facility condition assessments Multiple projects at various locations 4,000 4,000 0
2028 Asset disposal Multiple projects at various locations 6,000 6,000 0
2028 Emergency repair Multiple projects at various locations 6,000 6,000 0
2028 Environmental projects Multiple projects at various locations 3,000 3,000 0
2028 Portable classrooms Multiple projects at various locations 5,000 5,000 0
2028 Energy program Multiple projects at various locations 3,000 3,000 0
2028 Education telecommunications Multiple projects at various locations 3,000 3,000 0
2028 Boiler inspections Multiple projects at various locations 500 500 0
2028 Seismic safety Multiple projects at various locations 100 100 0
Facilities Improvement and Repair 106,178
2028 Tribal Colleges Facilities Improvement & Repar Multiple projects at various locations 16,000 16,000 0
Tribal Colleges Facilities Improvement & Repair 16,000
2028 Total Education Construction 416,212
Bureau of Indian Education
Education Construction Five-Year Plan -- FY 2024 - 2028
BIE-CONST-13
BIE-CONST-14
EDUCATION CONSTRUCTION
(Dollars in thousands)
Activity/
Subactivity/
Program Element
2022
Actual
2023
Enacted
2024
Fixed
Costs
(+/-)
2024
Internal
Transfers
(+/-)
2024
Program
Changes
(+/-)
2024
Request
Change
from
2023
Enacted
(+/-)
Replacement
School
Construction $
115,504
116,504
0
0
+136,000
252,504
+136,000
FTE
0
0
0
0
0
0
0
Replacement
Facility
Construction $
23,935
23,935
0
0
0
23,935
0
FTE
0
0
0
0
0
0
0
Replacement/New
Employee Housing
$
1,000
1,500
0
0
+2,500
4,000
+2,500
FTE
0
0
0
0
0
0
0
Employee Housing
Repair $
13,589
13,595
0
0
0
13,595
0
FTE
0
1
0
0
0
1
0
Facilities
Improvement &
Repair $
95,302
96,353
+110
0
+9,715
106,178
+9,825
FTE
10
10
0
0
+3
13
+3
Tribal Colleges
Facilities
Improvement &
Repair $
15,000
16,000
0
0
0
16,000
0
FTE
0
0
0
0
0
0
0
Activity Total $
264,330
267,887
110
0
148,215
416,212
148,325
FTE
10
11
0
0
3
14
3
Summary of 2024 Program Changes for Education Construction
Program Changes:
($000)
FTE
Replacement School Construction
+136,000
0
Replacement/New Employee Housing
+2,500
0
Facilities Improvement & Repair
+9,715
+3
TOTAL Program Changes
+148,215
+3
Justification of 2024 Program Changes:
The 2024 budget request for the Education Construction program is $416,212,000 and 14 FTE, a program
change of +$148,215,000 and +3 FTE from 2023 Enacted.
Replacement School Construction (+$136,000,000):
The Replacement School Construction program replaces entire school campuses and supports the
Administration’s commitment to invest in Native education, invest in Indian Country infrastructure, and
address racial equity by providing safe, functional, energy-efficient, and accessible facilities at Bureau of
Indian Education (BIE) funded schools and dormitories. Through the Site Assessment Capital Investment
(SA-CI) program, school replacements are addressed in order of priority based on available
appropriations. In 2024, funding will support planning, design, and construction at Cheyenne Eagle
Butte, Cove Day School, Cottonwood Day School, T’iis Nazbas Community School, and Little Wound
Day School.
Replacement – New Employee Housing (+$2,500,000):
The additional funding will support replacement for critical new employee housing units to support the
recruitment and retention of teachers and school leaders at remote locations. Government Furnished
Housing (GFH) units are currently estimated at $420,000 each. This increase will fund approximately six
(6) additional GFH units at locations to be determined.
Facilities Improvement and Repair (+$9,715,000 / +3 FTE):
The increase will assist with the deferred maintenance costs while reducing the deferred maintenance
backlog. Following BIE's project selection criteria, the goal is to improve energy efficiency and safety
while providing quality educational environments conducive to learning. This funding will help BIE
schools that are in poor condition move to the fair or good and acceptable condition level. This increase
accelerates IA’s ability to address life, safety, and accessibility issues for BIE funded school students.
Program Description:
The Education Construction program supports the Administration’s commitment to invest in Native
education, invest in Indian Country infrastructure, and address racial equity by providing safe, functional,
energy-efficient, and accessible facilities at Bureau of Indian Education (BIE) funded schools and
dormitories through school and facility replacement, and facility improvements and repairs. In 2024,
Indian Affairs (IA) will continue to manage Education Construction activities through a Memorandum of
Agreement with BIE, as BIE continues its transition to an independent bureau. The program is supported
by up to an additional $95 million a year from the Great American Outdoors Act.
2024 Activities:
The 2024 request:
BIE-CONST-15
BIE-CONST-16
In 2024, the schools identified through the Site Assessment Capital Investment (SA-CI) program
will continue to be addressed in order of priority based on available appropriations. 2024
appropriations will fund schools approved for replacement on the 2019 SA-CI program list as
follows: complete the funding of Cheyenne Eagle Butte School in South Dakota; Cove Day
School in Arizona, and T’iis Nazbas Community School in Arizona, and fully fund Cottonwood
Day School in Arizona; partially fund Little Wound Day School in South Dakota. Each year
from 2019 through 2021, 10 schools were identified by the SA-CI program for assessment on the
basis of established criteria. In 2022 and 2023, 5 schools were identified by the SA-CI program
for assessment. The tables below provide the current status of each identified school. The most
current SA-CI program information can be found on the IA Division of Facilities Management
and Construction (DFMC) website: https://www.bia.gov/as-ia/ofpsm/dfmc/ecsap.
Provides funding to improve the safety, functionality, and modernization of facilities and provide
an environment conducive to quality educational achievement and improved opportunities for
Indian students.
Maximizes the utility and prolongs the useful life of education buildings by renovating or
replacing facilities as part of a comprehensive approach that includes major and minor Facilities
Improvement and Repair (FI&R) and employee housing replacement and repair projects.
Education Construction Overview:
The Education Construction program supports the BIE by renovating or replacing schools and dormitories
to provide an environment conducive to quality educational achievement and improved opportunities for
Indian students. The program provides safe, functional, energy-efficient, and accessible facilities to
students attending BIE-funded schools and dormitories.
Subactivity - Replacement School Construction (2024: $252,504,000):
Program Overview:
The Replacement School Construction program replaces entire school campuses. Schools selected for
replacement are identified as “poor” conditioned schools, have exceeded their original design life, or have
a high concentration of portable units supplementing their educational programs. IA will continue
construction from the 2004 Replacement School Construction Priority Listing and 2016 No Child Left
Behind (NCLB) School Replacement List.
2004 Replacement School Construction Priority List:
1. Dilcon Community School (Complete)
2. Porcupine Day School (Complete)
3. Crown Point/T’iists’oozi’bi’olta Community School (Complete)
4. Muckleshoot Tribal School (Complete)
5. Dennehotso Boarding School (Complete)
6. Circle of Life Survival School (Complete)
7. Keams Canyon Elementary School (Complete)
8. Rough Rock Community School (Complete)
BIE-CONST-17
9. Crow Creek Elementary/Middle/High School (Complete)
10. Kaibeto Boarding School (Complete)
11. Blackfeet Dormitory (Complete)
12. Beatrice Rafferty School (Complete)
13. Little Singer Community School (Complete)
14. Cove Day School (Estimated Completion Date: TBD)
2016 No Child Left Behind (NCLB) Replacement School Priority List
Location Name Grades State
Procurement
Type
Phase
Estimated
Completion
Fund Type
Fund
Status
(F/NF)
Blackwater Community
School
K-5 AZ PL100-297 Complete N/A RSC F
Chichiltah-Jones Ranch
Community School
K-8 NM FAR Design-Build Sep-26 RSC F
Crystal Boarding School K-6 NM FAR Design-Build Jan-27 RSC F
Dzilth-Na-O-Dith-Hle
Community School
NM PL100-297 Complete N/A RSC F
Greasewood Springs
Community School
K-8
AZ FAR Design-Build Jun-27 RSC F
Laguna Elementary School K-5 NM PL100-297 Complete N/A RSC F
Lukachukai Elementary
School
K-8
AZ PL100-297 Complete N/A RSC F
Quileute Tribal School K-12 WA PL93-638 Complete N/A RSC F
T’iis Nazbas Community
School
K-8
AZ FAR Design-Build May-25 RSC F
Tonelea-Redlake
Elementary School
K-8 AZ FAR Design-Build Mar-27 RSC F
Note 1: Phase is defined as one of the following: Planning, Design, Design-Build, Construction, or Complete.
Note 2: Fund Type is defined as Replacement School Construction (RSC)
Note 3: F Project is Funded through the construction phase.
BIE-CONST-18
Beatrice Rafferty School
BIE-CONST-19
2020 SA-CI School Replacement Priority Listing
Location Name Grades State
Procurement
Type
Phase
Estimated
Completion
Fund Type
Fund
Status
(F/NF)
1 Santa Rosa Day School K-8 AZ FAR Planning TBD RSC NF
2 Wa He Lut Indian School K-8 WA FAR Planning TBD
RFC
FI&R
NF
3 Theodore Roosevelt School 6-8 AZ FAR Planning TBD RSC NF
4
Turtle Mountain Elementary
School
K-5 ND PL 100-297 Planning TBD RSC NF
2019 SA-CI School Replacement Priority Listing
Location Name Grades State
Procurement
Type
Phase
Estimated
Completion
Fund Type
Fund
Status
(F/NF)
1 Many Farms High School 9-12 AZ FAR Design Dec-26 GAOA F
2
Wounded Knee District School
and Quarters
K-8 SD PL 100-297 Planning Nov-25 GAOA F
3 Shonto Preparatory School K-8 AZ FAR Planning Aug-26 GAOA F
4 Cheyenne Eagle Butte School K-12 SD PL93-638 Planning Mar-28
GAOA
RSC
F
5 Pine Springs Day School K-4 AZ FAR Planning Feb-25
RFC
FI&R
F
6 Aneth Community School K-6 UT FAR Planning TBD
RFC
FI&R
F
7 Cottonwood Day School K-8 AZ FAR Planning TBD RSC F
8 Little Wound Day School K-12 SD PL 93-638 Planning TBD RSC NF
9
Tse’ii’ahi (Standing Rock)
Community School
K-4 NM FAR Planning TBD RSC NF
10 Pierre Indian Learning Center 1-8 SD FAR Planning TBD
RFC
FI&R
F
Note 1: Phase is defined as one of the following: Planning, Design, Design-Build, Construction, or Complete.
Note 2: Fund Type is defined as one of the following Replacement School Construction (RSC), Replacement Facilities
Construction (RFC), Great American Outdoors Act (GAOA), or Facilities Improvement & Repair (FI&R)
Note 3: F Project is Funded through the construction phase.
NF Project is Not Funded through the construction phase.
BIE-CONST-20
5
Te Su Geh Oweenge Day School
(Tesuque)
K-6 NM PL 100-297 Planning TBD RSC NF
6 Kinteel Residential Inc. Aztec N/A NM FAR Planning TBD GAOA NF
7
Northern Cheyenne Tribal
School
K-12 MT TBD Planning TBD RSC NF
8 Moencopi Day School K-6 AZ TBD Planning TBD TBD NF
9 Rocky Ridge Boarding School K-8 AZ TBD Planning TBD TBD NF
10 San Ildefonso Day School K-6 NM TBD Planning TBD
RFC
FI&R
NF
Note 1: Phase is defined as one of the following: SA-CI (Assessment or FIRB Approval), Planning, Design,
Design-Build, Construction, or Complete.
Note 2: Fund Type is defined as one of the following Replacement School Construction (RSC),
Replacement Facilities Construction (RFC) or Facilities Improvement & Repair (FI&R)
Note 3: F Project is Funded through the construction phase.
NF Project is Not Funded through the construction phase.
2021 SA-CI School Replacement Priority Listing
Location Name Grades State
Procurement
Type
Phase
Estimated
Completion
Fund
Type
Fund
Status
(F/NF)
1 Marty Indian School K-12 SD TBD SA-CI TBD TBD NF
2 Havasupai Elementary School K-6 AZ TBD SA-CI TBD TBD NF
3 Second Mesa Day School K-6 AZ TBD SA-CI TBD TBD NF
4 Lower Brule Day School K-12 SD TBD SA-CI TBD TBD NF
5 First Mesa Elementary School K-6 AZ TBD SA-CI TBD TBD NF
6 Hotevilla Bacavi Community School K-8 AZ TBD SA-CI TBD TBD NF
7
Theodore Jamerson Elementary
School
K-8 ND TBD SA-CI TBD TBD NF
8 Indian Island School K-8 ME TBD SA-CI TBD TBD NF
9 Indian Township School K-8 ME TBD SA-CI TBD TBD NF
10 Red Rock Day School K-8 AZ TBD SA-CI TBD TBD NF
2022 SA-CI School Replacement Priority Listing
Location Name Grades State
Procurement
Type
Phase
Estimated
Completion
Fund Type
Fund
Status
(F/NF)
1 To Hajilee Community School K-12 NM TBD Planning TBD Supplemental F
2 Porcupine Day School K-8 SD TBD SA-CI TBD TBD NF
3 Turtle Mountain High School 9-12 ND TBD SA-CI TBD TBD NF
BIE-CONST-21
4 Rock Creek Grant School K-8 SD TBD SA-CI TBD TBD NF
5
Sicangu Owaye Oti (Rosebud
Dormitory)
N/A SD TBD SA-CI TBD TBD NF
2023 SA-CI School Replacement Priority Listing
Location Name Grades State
Procurement
Type
Phase
Estimated
Completion
Fund
Type
Fund
Status
(F/NF)
1 Lac Courte Oreilles Ojibwa School K-12 WI TBD SA-CI TBD TBD NF
2 Paschal Sherman Indian School K-9 WA TBD SA-CI TBD TBD NF
3 Point Rock Community School K-12 AZ TBD SA-CI TBD TBD NF
4 Sherman Indian School 9-12 CA TBD SA-CI TBD TBD NF
5 Greyhills Academy High School 9-12 AZ TBD SA-CI TBD TBD NF
Subactivity - Replacement Facility Construction (2024: $23,935,000):
Program Overview:
Replacement Facility Construction funds the replacement of individual facilities on school campuses
when replacing the entire school is not warranted. Academic-related facilities selected for replacement
are identified as “poor condition” and/or have exceeded their original design life. Prior to the full
implementation of the SA-CI Program the four schools below were selected for Replacement Facility
Construction.
Replacement Facility Construction
Location Name Grades State
Procurement
Type
Phase
Estimated
Completion
Fund Type
Fund
Status
(F/NF)
1 Ramah-Pine Hill School K-12 AZ TBD
Design-
Build
Mar-26 RFC F
2 Santa Rosa Ranch School K-8 AZ FAR
Design-
Build
Sep-24 RFC F
3 Atsa Biyaazh Community School K-6 NM FAR
Design-
Build
Nov-23 RFC F
4 Many Farms Community School K-8 NM PL93-638 Planning Jul-27 RFC F
Note 1: Phase is defined as one of the following: Planning, Design, Design-Build, Construction, or Complete.
Note 2: Fund Type is defined as Replacement Facilities Construction (RFC)
Note 3: F Project is Funded through the construction phase.
NF Project is Not Funded through the construction phase.
IA is also continuing planning of the facilities replacement projects at Pine Springs Day School, Aneth
Community School, Pierre Indian Learning Center, and Wa He Lut Indian School. 2024 and prior year
funds will fully fund the Wa He Lut School (2020 SA-CI) project and partially fund San Ildefonso Day
School (2020 SA-CI) project. Any remaining funds will be used for any required supplemental funding
and adjustments for existing projects, and for future projects identified through the SA-CI Program.
Subactivity – Replacement/New Employee Housing (2024: $4,000,000):
Program Overview:
IA continues to conduct need assessments of employee housing at BIE locations to identify and prioritize
2024 quarter projects using the Facility Condition Assessment (FCA) and Site Assessment-Capital
Investment (SA-CI) programs to comprehensively assess employee housing. IA identifies sites for
replacement/building new teacher housing at remote locations where alternative housing is limited or
current facilities are in critical need of replacement. The availability of adequate housing is an essential
component for the recruitment and retention of BIE teachers. There are currently 1,609 housing units at
87 sites for BIE housing. Of the 87 sites, 48 (55%) are rated in poor condition based on an overall
Facilities Condition Index (FCI) score of 0.1850 (>.10 is considered poor).
Subactivity - Employee Housing Repair (2024 $13,595,000; FTE: 1):
Program Overview:
IA maintains employee quarters consisting of single-family houses, duplex, triplex, and apartment units
for essential school employees as determined by the program. The Employee Housing Repair program
funds site-level and major repairs along with remediation of health and safety deficiencies.
Improvements and repairs support the Department of the Interior’s commitment to provide Federal
employees with safe, functional, energy efficient, and cost-effective living quarters. The program also
includes space reduction goals to eliminate uninhabitable or excess units.
Program Management [$706,000; FTE 1]:
Program Management funds are used for administrative costs associated with program oversight, project
management and inspections.
Quarters Improvement and Repair [$10,613,000]:
The Quarters Improvement and Repair (QI&R) program funds are used to correct safety and health
deficiencies and to address deferred maintenance and renovations of quarters units. Quarters Managers
have the responsibility to provide local support to the various site and agency housing managers within
their specific geographic area.
Quarters Emergency Repairs [$200,000]:
The Quarters Emergency Repairs program funds are used to address immediate threats to life, property or
health at BIE housing sites resulting from catastrophic failures, fire, wind, water damage, or other causes.
Funds are used to address failing utility systems, infrastructure, and restoration to a functional condition.
BIE-CONST-22
Quarters Environmental Projects [$776,000]:
The Quarters Environmental Projects program funds are used to assess, characterize, remediate and
monitor potential or actual releases of environmental contaminants. Work will include the upgrade and
replacement of fuel oil tanks, removal and disposal of contaminated soils and hazardous materials and
abatement of asbestos and lead-based paint, and sampling and analysis of environmental contaminants.
Quarters Demolition [$1,300,000]:
Quarters Demolition program funds are used for disposal of housing units identified as uninhabitable and
in an unacceptable condition. Disposal of uninhabitable housing reduces the Deferred Maintenance
(DM) backlog by eliminating the structures, and the associated DM, from the IA housing inventory.
Subactivity - Facilities Improvement and Repair (FI&R) (2024: $106,178,000; FTE: 13):
Program Overview:
The Facilities Improvement and Repair (FI&R) funds are used to improve the safety and functionality of
facilities on school campuses. IA will seek to maximize the utility and prolong the useful life of
education buildings by improving or rehabilitating facilities as part of a comprehensive approach that
includes major and minor facilities improvement, facility condition assessments, targeted projects, and
compliance activities.
Program Management [$8,578,000]:
Program Management provides for program and administrative management costs associated with the
execution of the program. The IA-Facilities Management System (IA-FMS) is funded in part from these
funds. Program Management funds support IA staff within the Office of Facilities, Property, and Safety
Management (OFPSM) who perform asset management, and staff from the Division of Facilities
Management and Construction (DFMC) who provide program oversight, direction, technical assistance,
and direct project management of high cost and complexity projects. Technical assistance is provided to
Tribal, BIA, and BIE customers to assist in planning, design, construction, renovation, and major
maintenance projects. In addition, experienced and knowledgeable teams perform program evaluations
to ensure facility construction and operation and maintenance programs conform to DOI and IA policy,
laws, and regulations. Program evaluation reviews help ensure safety and health standards are met, work
conforms to approved drawings and specifications, and Regions and Agencies are knowledgeable of IA
policy, processes, and best practices.
Advance Planning and Design [$5,000,000]:
Advance Planning and Design program funds provide for preliminary planning of schools on the
replacement school and replacement facilities listings and major improvement and repair projects
included in the Department’s Five-Year Deferred Maintenance and Capital Improvement plan. In 2022,
the FI&R program shifted to a centralized project planning model for designing major FI&R projects and
site planning. By applying funds in this manner, IA will ensure more effective transitioning from
planning to design and construction with improved control of overall project cost and time.
Major Improvement and Repair [$32,000,000]:
Major Improvement and Repair (MI&R) program funds support abatement of critical deficiencies
exceeding $250,000, but less than education facility replacement program consideration. Major FI&R
BIE-CONST-23
projects improve the safety and functionality of facilities and repair or replace major capital equipment,
and in doing so, move facilities and sites closer to a status of fair or a better condition as measured by the
FCI. Funds will be used to correct priority deficiencies, beginning with critical safety & health issues,
and as assessed using the IA Supplemental Project Scoring Guidelines for 5-year Capital Improvement
Planning. A list of current prioritized projects is presented to the IA Facilities Investment Review Board
(IA-FIRB) annually. Correction of these items is critical for IA’s compliance with accessibility
requirements; Environmental Protection Agency (EPA) requirements; National Fire Protection
Association (NFPA); and other life safety code requirements.
These projects will advance BIE’s ability to provide a healthy, safe, and positive environment for students
and staff, allow accessibility to up-to-date technologies and enhance student learning capabilities and will
improve the FCI of individual buildings and school sites. Additional expected outcomes include
improved costs and efficiencies through the design and installation of high-performance energy efficient
building systems.
Minor Improvement and Repair [$30,000,000]:
These funds are primarily for serious health and safety deficiencies existing in the backlog or identified in
an annual health and safety inspection with completed abatement plans that are not included in the annual
O&M program. BIE has some discretion to repair and replace other critical systems in accordance with
guidance provided by DFMC.
The deficiencies scheduled for correction are in the following categories: 1) critical health and safety
deficiencies, and 2) mechanical, electrical, and other building systems to include grounds improvements.
Funds for the abatement of identified deficiencies will be in accordance with accessibility requirements,
EPA requirements, National Fire Protection Association, and other applicable safety code requirements.
Prioritization of deficiencies for 2024 is based on project scoring criteria incorporated into the IA-FMS.
Final project lists will be developed using guidance provided by DFMC to the BIE and IA regional
facilities staff working with each school location to identify deficiencies. The work will be accomplished
by each location where feasible via Pub. L. 100-297 grants, Pub. L. 93-638 subpart J contracts, or FAR
contracts.
Facility Condition Assessments [$4,000,000]:
Funds are used to complete a comprehensive condition assessment and inventory validation of all IA-
owned real property assets on a three-year cycle. The IA real property portfolio for education facilities,
including academic and housing quarters, consists of approximately 22.7 million gross square feet
contained in over 3,648 facilities located at 179 locations in 23 States. The condition assessments
identify new and validate existing deficiencies in IA-FMS to facilitate the allocation of resources to help
maintain IA real property portfolio assets at an operational level, as well as extend the useful life of the
asset. Facilities inspections include standard elements identified such as fire and life safety, HVAC
systems, electrical systems, structural integrity, and other elements. Assets include building and housing
units, roads, recreation facilities, water and power facilities, storage facilities, garages (employee housing
and non-housing structures), and existing structure operation support systems, i.e., infrastructure of the
identified location.
BIE-CONST-24
Asset Disposal [$6,000,000]:
Funds are used for space reduction activities in the education program. The asset portfolio and Space
Management Plan (SMP), as derived from the DOI Asset Management Plan (AMP), contains a five-year
space reduction plan, which is the vehicle for implementing the space goals through consolidation,
colocation, and disposal of assets. The goal of space management is achieved by eliminating unnecessary
space while maintaining facilities to meet mission-related needs. The SMP identifies BIE-owned assets
nationwide which have been determined to be in excess of program needs and are not considered viable
for continued use by consolidation or renovation. Subsequently, these assets have been designated for
disposal via demolition or transfer.
Riverside Indian School
Emergency Repair [$6,000,000]:
Funds will be used as necessary to support the Emergency Reimbursement Program (ERP). IA has the
responsibility of providing safe facilities and when a facility related emergency occurs that presents an
immediate threat to life or property, IA must correct the situation as soon as possible. To do so, IA
established the ERP which is managed by DFMC. This program covers projects that are outside of
coverage from the Minor Improvement and Repair Program (MI&R).
Environmental Projects [$3,000,000]:
Funds will be used to continue efforts to abate environmental hazards in accordance with environmental
laws and regulations. Specifically, funds will be used to assess, characterize, remediate, and monitor
potential or actual releases of environmental contaminants at BIE-owned education facilities.
Environmental projects will include the upgrade or replacement of storage tanks, wastewater systems,
water systems, water towers or wells; removal and disposal of contaminated soils and hazardous or toxic
materials; abatement of asbestos and lead paint; and sampling and analysis of environmental
contaminants, including testing for and mitigation of radon gas. Compliance will minimize or eliminate
public exposure to environmental hazards. Material is properly handled by trained and qualified
contractors and disposed of at approved locations proximate to various project locations.
BIE-CONST-25
BIE-CONST-26
Portable Classroom Buildings [$5,000,000]:
Due to short-term variations in enrollment or when development of a new permanent facility is pending,
IA will construct, transport, repair, install, and relocate portable buildings at various sites. The work
may also include
constructing infrastructure associated with building utilities and vehicle and pedestrian
walkways necessary for completion and operation of the portable buildings.
Energy Program [$3,000,000]:
The energy program will continue to accomplish the legislative goals mandated by the following
documents:
Energy Policy Act of 2022 Pub. L. 109-58
Energy Independence and Security Act of 2007 (EISA), Pub. L. 110-140. Requirements for the
EISA Energy Assessments are incorporated in the Facility Condition Assessment Contract scope.
Department of Energy Federal Energy Management Program Energy Metering Guidance, issued
October 2022
The Federal Building Performance Standard, issued December 2022
Guiding Principles for Sustainable Federal Buildings, issued December 2020. Requirements for
the Sustainability Site Assessments are incorporated in the Facility Condition Assessment
Contract Scope.
The Federal Sustainability Plan, issued December 2021
Additionally, the Energy Program will support the governmental wide transition to fleet EVs by
installing EV charging stations. Locations will be determined by and coordinated with the IA Fleet
EV acquisition and distribution annual plan.
Education Telecommunications [$3,000,000]:
Funds will be used for the continued narrow band radio conversion mandated by 47 CFR Section 300,
which requires replacement of all Very High Frequency (VHF) and Ultra High Frequency (UHF)
systems. Infrastructure communications systems and radio mobile and portable unit improvements will
be provided to schools. Funds will be used for management administration, providing technical
assistance, and the immediate repair or replacement of unanticipated life/safety and other facility
deficiencies affected by the education telecommunication infrastructure. Examples of repairs include
repair or replacement of radio towers and base
stations or telephone switching systems and infrastructure.
BIE-CONST-27
Boiler Inspec
tions [$500,000]:
Funds will be used for inspections and repair of boilers for the BIE-funded
schools. Inspection of boilers are required to ensure that all boilers and pressure
vessels within IA facilities are inspected, operated and maintained by trained,
qualified and certified personnel in accordance with the National Board Inspection
Code and other applicable national or state codes, standards and regulations.
The National B
oard Inspection Code (NBIC), first published in 1945 as a guide for
chief inspectors, has become an internationally recognized standard, adopted by
most US and Canadian jurisdictions. The NBIC provides standards for the
installation, inspection, and repair and/or alteration of boilers, pressure vessels,
and pressure relief devices. IA and DFMC have adopted the NBIC as well as
other related national codes as part of its Boiler and Pressure Vessel Policy.
Seismic Saf
ety Data [$100,000]:
Funds will be used for structural design of buildings requiring seismic retrofitting. This program is in
compliance with provisions of Executive Order 12941, Seismic Safety of Existing Federally Owned or
Leased Buildings, which requires Federal agencies to assess and enhance the seismic safety of existing
buildings that were designed and constructed without adequate seismic design and construction methods.
Subactivity -
Tribal Colleges Facilities Improvement & Repair (2024: $16,000,000):
Program Overview:
Congress has recognized that many Tribal Colleges and Universities (TCUs) have significant unfunded
needs. The BIE and IA conducted Tribal Consultations with Tribal leaders and other stakeholders in May
2021 to request input on developing a methodology for determining TCU operating and maintenance
needs to inform future budget requests. As a result of the Tribal Consultations, the funds are equally
divided and distributed among the TCUs.
Boiler at Blackfeet
Dormitory in Montana
BIE-CONST-28
BUREAU OF INDIAN AFFAIRS
Project Data Sheet
Total Project Score/Ranking: 84
Planned Funding FY 2024: $TBD
Funding Source: Education Construction - Replacement School Appropriations
Project Identification
Project Title: Cheyenne-Eagle Butte (CEB) School
Project Number: TBD
Unit/Facility Name: Cheyenne-Eagle Butte (CEB) School
Region/Area/District: Great Plains Region
Congressional District: 01
State: SD
Project Justification
# DOI Asset Code Real Property Unique ID # API: FCI-Before:
1 35230000 : Bldg School N33R0801391 100 0.0000
2 35310000 : Bldg Dormitories/ Barracks A01R1202002 100 0.5349
3 35290000 : Bldg Other Institutional Uses A01R1202003 090 0.1470
4 35310000 : Bldg Dormitories/ Barracks A01R1202004 100 0.3977
5 35230000 : Bldg School A01R1202005 100 0.1485
6 35230000 : Bldg School A01R1202006 090 0.4176
7 35410400 : Bldg Warehouse Garage, Bus A01R1202008 048 0.2614
8 35410500 : Bldg Warehouse Shed Outbuilding A01R1202104 070 0.6496
9 40800600 : Bleacher Outside A1000340720000005 060 0.0195
10 35230000 : Bldg School A01R1202107 100 0.2622
11 35230000 : Bldg School A01R1202108 100 1.0000
12 35230000 : Bldg School A01R1202111 100 0.2913
13 Grounds/Site Work Maximo ID: AB108370 N/A N/A
NOTE: Future Year Phases to be submitted annually based on priority needs
Project Description:
Phase II – Design and Construction - Cheyenne-Eagle Butte School serves 937 students in grades K-12 and is
located in Eagle Butte, SD. This project replaces the current CEB campus, which consists of 12 permanent
structures and site/grounds work. A need for 30 Staff Quarters has been identified. Existing quarters will be
assessed to determine suitability for reuse. All new academic facilities will conform to the Federal Sustainable
Building requirements and be designed using Leadership in Energy & Environmental Design (LEED) guidelines
and green building products and will conserve water and energy resources to the greatest extent possible. Upon
completion of the new facility, the existing school buildings will be demolished or transferred.
Scope of Benefits (SB):
Project Selection Criteria / GAOA Strategy Alignment:
Restore & Protect High Visitation / Public Use Facilities
Improve ADA Accessibility
Expand Recreation Opportunities and Public Access
Remediate Poorest FCI Facilities
2.1 Reduce Deferred Maintenance
2.2 Leverage Funding / Pursue Partnering Opportunities
2.3 Reduce Annual Operating Costs
2.4 Replacement of Assets
3.1 Address Safety Issues
3.2 Protect Employees / Improve Retention
4.1 Modernize Infrastructure
Investment Strategy (IS):
The entire project would be considered capital improvement.
The current existing Deferred Maintenace Work Order (DMWO) list, upon completion of the project,
will be reduced to zero.
New facility will reduce the Operations and Maintenance (O&M) costs to those related to ongoing
maintenance of new equipment, which will provide a net reduction in O&M funding from current
levels.
Consequences of Failure to Act (CFA):
Without this project, operation and maintenance costs will continue to increase due to increasingly poor system
performance. Student performance will also continue to be impaired by inadequate facilities incapable of
addressing modern educational requirements.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.3862
API Rating: n/a 84
API/FCI Score: (20%) 20
SB Score: (40%) 40
IS Score: (20%) 13
CFA Score: (20%) 11
Total Score: (100%) 84
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled TBD Completed TBD
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work : $ 0 100
Capital Improvement Work: $ TBD 100
Total: $
BIE-CONST-29
TBD 100
BIE-CONST-30
Project Funding History (entire project):
History Dollars in thousands
Funded to Date:
FY 2021 GAOA Fundiing $ 2,400
FY 2023 Replacement School Funding $ 115,906
FY 2024 Education Construction Funding (this PDS): $ TBD
FY 2024 [FLREA/FLTP/Donation, etc.] Funding: $ 0
Future Funding to Complete Project: $ TBD
Total: $ TBD
Class of Estimate: C
Estimate Escalated to: FY 2023/Q2
Planning and Design Funds:
Planning Funds Received in FY 2021: $ 350,000
Design Funds Received Received in FY 2021: $ 2,050,000
Major Milestones
Construction Award/Start
Scheduled: TBD
Actual: TBD
Project Complete
Scheduled: FY 2028/Q2
Actual: TBD
Project Data Sheet
Prepared/Last Updated: 2/2023
DOI Approved: Yes
Annual Operations & Maintenance Costs $
Current: $ 1,254,000
Projected: $ 941,818
Net Change: -$ 312,182
BIE-CONST-31
BUREAU OF INDIAN AFFAIRS
Project Data Sheet
Total Project Score/Ranking: 78
Planned Funding FY 2024: $TBD
Funding Source: Replacement School Campus
Project Identification
Project Title: IE033 Cove Day School, School Replacement (RS)
Project Number: TBD
Unit/Facility Name: Cove Day School
Region/Area/District: Navajo Region
Congressional District: 01
State: AZ
Project Justification
DOI Asset Code Real Property Unique ID # API: FCI-Before:
1 35500200 : Bldg Pump House Well House A1000344520000004 100 0.0000
2 35600000 : Bldg Service N32R0500315 100 0.3936
3 35500200 : Bldg Pump House Well House N32R0501619 100 0.0000
4 35230000 : Bldg School N32R1601345 100 0.0598
5 35230000 : Bldg School N32R050308 100 0.2879
6 35230000 : Bldg School N32R0500316 100 0.8764
7 35230000 : Bldg School N32R0500317 100 0.0545
8 Location Cove Day School GROUNDS Maximo ID: AB108383 N/A N/A
Project Description:
Cove Day School, located Red Valley Arizona serves 52 students in grades K – 6. This project will replace the
current Cove Day School campus, which consists of 7 major buildings. All new academic facilities will
conform to the Federal Sustainable Building requirements and be designed using Leadership in Energy &
Environmental Design (LEED) Silver guidelines and green building products and will conserve water and
energy resources to the greatest extent possible. Upon completion of the new facilities, the existing school
buildings will be disposed of.
This includes major site infrastructure activities:
Replacement of water distribution system with new water main piping which will create a looped
network around the campus.
Replacement of sanitary sewer collection system.
Application of a varied approach to pavement repair, i.e., replacing what is beyond salvaging and
rehabilitating other pavements considered to be in serviceable condition.
Significant improvements to the athletic field areas.
Improvement to the overall site drainage and grading include removing debris piles that have
accumulated along curb gutters.
BIE-CONST-32
Scope of Benefits (SB):
Project Selection Criteria / Strategy Alignment:
1.1 Restore & Protect High Visitation / Public Use Facilities
1.2 Improve ADA Accessibility
1.3 Expand Recreation Opportunities and Public Access
1.4 Remediate Poorest FCI Facilities
2.1 Reduce Deferred Maintenance
2.2 Leverage Funding / Pursue Partnering Opportunities
2.3 Reduce Annual Operating Costs
2.4 Replacement of Assets
3.1 Address Safety Issues
3.2 Protect Employees / Improve Retention
4.1 Modernize Infrastructure
Investment Strategy (IS):
The entire project would be considered capital improvement.
The current existing Deffered Maintenace Work Order (DMWO) list, upon completion of the project,
will be reduced to zero.
New facility will reduce the Operations and Maintenance (O&M) costs to those related to ongoing
maintenance of new equipment, which will provide a net reduction in O&M funding from current
levels.
Consequences of Failure to Act (CFA):
Without this project operation and maintenance costs will continue to increase due to increasingly poor
system performance. Student performance will also continue to be impaired by inadequate facilities
incapable of addressing modern educational requirements.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.7001
API Rating: n/a 100
API/FCI Score: (20%) 20
SB Score: (40%) 40
IS Score: (20%) 10
CFA Score: (20%) 8
Total Score: (100%) 78
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled TBD Completed TBD
BIE-CONST-33
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work : $ 0 0
Capital Improvement Work: $ TBD 100
Total: $ TBD 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date:
FY 2024 A1112 Funding (this PDS): $ TBD
Future Funding to Complete Project: $ TBD
Total: $ TBD
Class of Estimate: D
Estimate Escalated to: TBD
Planning and Design Funds:
Planning Funds Received in FY 2024: $ TBD
Design Funds Received Received in FY 2024: $ TBD
Major Milestones
Construction Award/Start
Scheduled: FY 2023/Q4
Actual: FY 202#/Q#
Project Complete
Scheduled: FY 2025/Q4
Actual: FY 202#/Q#
Project Data Sheet
Prepared/Last Updated: 3/23
DOI Approved: Yes
Annual Operations & Maintenance Costs $
Current: $ 226,309
Projected: $ 169,732
Net Change: -$ 56,557
BIE-CONST-34
BUREAU OF INDIAN AFFAIRS
Project Data Sheet
Total Project Score/Ranking: 82
Planned Funding FY 2024: $TBD
Funding Source: RS A1112 Education Replacement School
Project Identification
Project Title: T’iis Nazbas Community School Full Campus Replacement School
Project Number:
Unit/Facility Name: IE153 T’iis Nazbas Community School
Region/Area/District: Navajo
Congressional District: 01
State: AZ
Project Justification
DOI Asset Code Real Property Unique ID # API: FCI-Before:
1 35300300 : Bldg Housing Multi- Family Plex N32R1000636 70 0.7487
2 35300300 : Bldg Housing Multi- Family Plex N32R1000637 70 0.6871
3 35300300 : Bldg Housing Multi- Family Plex N32R1000638 70 0.7133
4 35300300 : Bldg Housing Multi- Family Plex N32R1000639 70 0.7288
5 35300200 : Bldg Housing Single Family N32R1000640 80 0.8565
6 35500200 : Bldg Pump House Well House A1000345320000046 100 0.0057
7 35600000 : Bldg Service N32R1000644 100 0.4731
8 35600000 : Bldg Service N32R1000645 100 0.4529
9 35300300 : Bldg Housing Multi- Family Plex N32R1000646 70 0.5671
10 35801600 : Bldg Garage Detached N32R1000657 47 0.1419
11 35801600 : Bldg Garage Detached N32R1000659 37 0.1511
12 35500200 : Bldg Pump House Well House A1000345320000018 100 0.0982
13 35300200 : Bldg Housing Single Family N32R1000664 70 0.4065
14 35300200 : Bldg Housing Single Family N32R1000665 70 0.6409
15 35300200 : Bldg Housing Single Family N32R1000666 70 0.6189
16 35300200 : Bldg Housing Single Family N32R1000667 70 0.4786
17 35300200 : Bldg Housing Single Family N32R1000668 70 0.5284
18 35300200 : Bldg Housing Single Family N32R1000669 70 0.5556
19 35300200 : Bldg Housing Single Family N32R1000670 70 0.5088
20 35300200 : Bldg Housing Single Family N32R1000671 70 0.4550
21 35300200 : Bldg Housing Single Family N32R1000672 70 0.4248
22 35300300 : Bldg Housing Multi- Family Plex N32R1000673 70 0.3377
23 35300200 : Bldg Housing Single Family N32R1000675 70 0.5009
24 35300200 : Bldg Housing Single Family N32R1000676 70 0.5306
25 35300300 : Bldg Housing Multi- Family Plex N32R1000677 70 0.5764
26 35300200 : Bldg Housing Single Family N32R1000678 70 0.5195
27 35300200 : Bldg Housing Single Family N32R1000679 70 0.5080
28 35300200 : Bldg Housing Single Family N32R1000680 70 0.4687
29 35300200 : Bldg Housing Single Family N32R1000681 70 0.5383
BIE-CONST-35
30 35300200 : Bldg Housing Single Family N32R1000682 70 0.5331
31 35300300 : Bldg Housing Multi- Family Plex N32R1000683 70 0.5211
32 35300200 : Bldg Housing Single Family N32R1000685 70 0.5917
33 35300200 : Bldg Housing Single Family N32R1000686 70 0.3864
34 35300200 : Bldg Housing Single Family N32R1000687 70 0.3725
35 35300300 : Bldg Housing Multi- Family Plex N32R1000688 70 0.2877
36 Pump House Maximo ID: AB107539 100 0.2098
37 35600000 : Bldg Service N32R1000628 100 0.2364
38 35230000 : Bldg School N32R1000641 100 0.3938
39 35230000 : Bldg School N32R1000656 100 0.2291
40 35310000 : Bldg Dormitories/ Barracks N32R1000658 100 0.1459
41 35291400 : Bldg Dining Hall Cafeteria N32R1000660 100 0.0586
42 35230000 : Bldg School N32R1000661 100 0.0708
43 35800600 : Bldg Fire Station N32R100662 100 0.2244
44 35300600 : Bldg Housing Garage N32R1000674 37 0.4101
45 35300600 : Bldg Housing Garage N32R1000684 37 0.3545
46 35300600 : Bldg Housing Garage N32R1000689 37 0.4101
47 35290000 : Bldg Other Institutional Uses N32R1000736 100 0.1324
48
Location Tiis Nazbas Community School
GROUNDS
Maximo ID: AB108498 N/A N/A
Project Description:
T’iis Nazbas Community School, is a Navajo tribally controlled school serving 388 students in grades K – 8.
This project will replace the current Shonto campus, which consists of 7 major buildings and several smaller
support structures. All new academic facilities will conform to the Federal Sustainable Building requirements
and be designed using Leadership in Energy & Environmental Design (LEED) Silver guidelines and green
building products and will conserve water and energy resources to the greatest extent possible. Upon
completion of the new facilities, the existing school buildings will be disposed of.
This includes major site infrastructure activities:
Replacement of the 60-year-old water distribution system with new water main piping which will
create a looped network around the campus.
Replacement of the 60-year-old sanitary sewer collection system.
Application of a varied approach to pavement repair, i.e., replacing what is beyond salvaging and
rehabilitating other pavements considered to be in serviceable condition.
Significant improvements to the athletic field areas.
Improvement to the overall site drainage and grading include removing debris piles that have
accumulated along curb gutters.
Scope of Benefits (SB):
Project Selection Criteria / Strategy Alignment:
1.1 Restore & Protect High Visitation / Public Use Facilities
1.2 Improve ADA Accessibility
1.3 Expand Recreation Opportunities and Public Access
1.4 Remediate Poorest FCI Facilities
BIE-CONST-36
2.1 Reduce Deferred Maintenance
2.2 Leverage Funding / Pursue Partnering Opportunities
2.3 Reduce Annual Operating Costs
2.4 Replacement of Assets
3.1 Address Safety Issues
3.2 Protect Employees / Improve Retention
4.1 Modernize Infrastructure
Investment Strategy (IS):
The entire project would be considered capital improvement.
The current existing Deferred Maintenace Work Order (DMWO) list, upon completion of the project,
will be reduced to zero.
New facility will reduce the Operations and Maintenance (O&M) costs to those related to ongoing
maintenance of new equipment, which will provide a net reduction in O&M funding from current
levels.
Consequences of Failure to Act (CFA):
Without this project operation and maintenance costs will continue to increase due to increasingly poor
system performance. Student performance will also continue to be impaired by inadequate facilities
incapable of addressing modern educational requirements.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.2985
API Rating: n/a 92
API/FCI Score: (40%) 40
SB Score: (20%) 20
IS Score: (20%) 12
CFA Score: (20%) 10
Total Score: (100%) 82
Combined ranking factors = (0.40 x API/FCI score) + (0.20 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled TBD Completed TBD
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work : $ 0 0
Capital Improvement Work: $ TBD 100
Total: $ 0 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 0
BIE-CONST-37
FY 2024 A1112 Funding (this PDS): $ TBD
Future Funding to Complete Project: $ TBD
Total: $ TBD
Class of Estimate: D
Estimate Escalated to: FY 202# / Q#
Planning and Design Funds:
Planning Funds Received in FY 2024 $ TBD
Design Funds Received in FY 2024 $ TBD
Major Milestones
Construction Award/Start
Scheduled: FY 202#/Q#
Actual: FY 202#/Q#
Project Complete
Scheduled: FY 202#/Q#
Actual: FY 202#/Q#
Project Data Sheet
Prepared/Last Updated: 03/2023
DOI Approved: Yes
Annual Operations & Maintenance Costs $
Current: $ 1,293,324
Projected: $ 969,993
Net Change: +/-$ -323,331
BIE-CONST-38
BUREAU OF INDIAN AFFAIRS
Project Data Sheet
Total Project Score/Ranking: 75
Planned Funding FY 2024: $ TBD
Funding Source: RS A1112 Education Replacement School
Project Identification
Project Title: Full Campus Replacement School - Cottonwood Day School
Project Number: N35-23-001
Unit/Facility Name: Cottonwood Day School
Region/Area/District: Navajo
Congressional District: 01
State: AZ
Project Justification
# DOI Asset Code Real Property Unique ID # API: FCI-Before:
1 35230000 : Bldg School N35R0400606 100 0.3598
2 35500000 : Bldg Industrial N35R0400607 100 0.5279
3 35230000 : Bldg School N35R0400608 100 0.1170
4 35600000 : Bldg Service N35R0400609 100 0.1209
5 35410000 : Bldg Warehouses N35R0400610 70 0.1569
6 35500200 : Bldg Pump House Well House N35R0400611 100 0.1493
7 35230000 : Bldg School N35R0400612 100 0.1264
8 35300300 : Bldg Housing Multi- Family Plex N35R0400614 70 0.6126
9 35300300 : Bldg Housing Multi- Family Plex N35R0400615 70 0.0885
10 35300200 : Bldg Housing Single Family N35R0400617 70 0.0435
11 35300200 : Bldg Housing Single Family N35R0400618 70 0.0623
12 35300300 : Bldg Housing Multi- Family Plex N35R0400619 70 0.0435
13 35300200 : Bldg Housing Single Family N35R0400620 70 0.0502
14 35300200 : Bldg Housing Single Family N35R0400621 70 0.0502
15 35300200 : Bldg Housing Single Family N35R0400622 70 0.0540
16 35300200 : Bldg Housing Single Family N35R0400623 70 0.0502
17 35300300 : Bldg Housing Multi- Family Plex N35R0400624 70 0.0435
18 35300200 : Bldg Housing Single Family N35R0400625 70 0.0502
19 35300200 : Bldg Housing Single Family N35R0400626 70 0.0540
20 35300200 : Bldg Housing Single Family N35R0400627 70 0.0502
21 35300200 : Bldg Housing Single Family N35R0400628 70 0.0573
22 35300200 : Bldg Housing Single Family N35R0400629 70 0.0502
23 35300200 : Bldg Housing Single Family N35R0400630 70 0.0435
24 35300200 : Bldg Housing Single Family N35R0400631 70 0.0623
25 35300200 : Bldg Housing Single Family N35R0400632 70 0.0540
26 35300200 : Bldg Housing Single Family N35R0400633 70 0.0502
27 35300200 : Bldg Housing Single Family N35R0400634 70 0.1854
28 35300200 : Bldg Housing Single Family N35R0400637 70 0.0682
29 35300200 : Bldg Housing Single Family N35R0400638 70 0.0453
BIE-CONST-39
30 35230000 : Bldg School N35R0401721 100 0.1159
31 35410000 : Bldg Warehouses N35R040135906 70 1.2305
32 Grounds Site Work Maximo ID: AB108382 N/A N/A
Project Description:
Cottonwood Day School, located in Chinle, AZ, is a Bureau Operated school serving 174 students in grades
K – 8. This project will replace the current Cottonwood Day School campus, which consists of three major
buildings and several smaller support structures. All new academic facilities will conform to the Federal
Sustainable Building requirements and be designed using Leadership in Energy & Environmental Design
(LEED) Silver guidelines and green building products and will conserve water and energy resources to the
greatest extent possible. Upon completion of the new facilities, the existing school buildings will be disposed
of.
This includes major site infrastructure activities such as assessment and possible replacement of water
distribution system, electrical distribution, and vehicular circulation. A varied approach will be applied to
pavement repair, i.e., replacing what is beyond salvaging and rehabilitating other pavements considered to be in
serviceable condition. There will be significant improvements to the athletic field areas. Improvements to the
overall site drainage and grading will include removing debris piles that have accumulated along curb gutters.
Scope of Benefits (SB):
Project Selection Criteria / Strategy Alignment:
Restore & Protect High Visitation / Public Use Facilities
Improve ADA Accessibility
Expand Recreation Opportunities and Public Access
Remediate Poorest FCI Facilities
2.1 Reduce Deferred Maintenance
2.2 Leverage Funding / Pursue Partnering Opportunities
2.3 Reduce Annual Operating Costs
2.4 Replacement of Assets
3.1 Address Safety Issues
3.2 Protect Employees / Improve Retention
4.1 Modernize Infrastructure
Investment Strategy (IS):
The entire project would be considered capital improvement.
The current existing Deferred Maintenace Work Order (DMWO) list, upon completion of the project,
will be reduced to zero.
New facility will reduce the Operations and Maintenance (O&M) costs to those related to ongoing
maintenance of new equipment, which will provide a net reduction in O&M funding from current
levels.
BIE-CONST-40
Consequences of Failure to Act (CFA):
Without this project operation and maintenance costs will continue to increase due to increasingly poor system
performance. Student performance will also continue to be impaired by inadequate facilities incapable of
addressing modern educational requirements.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.5170
API Rating: n/a 77
API/FCI Score: (20%) 8
SB Score: (40%) 40
IS Score: (20%) 16
CFA Score: (20%) 11
Total Score: (100%) 75
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled 06/2024
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work : $ 0 100
Capital Improvement Work: $ TBD 100
Total: $ TBD 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 0
FY 2024 Education Construction Funding (this PDS): $ TBD
FY 2024 [FLREA/FLTP/Donation, etc.] Funding: $ 0
Future Funding to Complete Project: $ TBD
Total: $ TBD
Class of Estimate: D
Estimate Escalated to: FY 2027/Q1
Planning and Design Funds:
Planning Funds Received in FY 2024: $ TBD
Design Funds Received in FY 2024: $ TBD
Major Milestones
Construction Award/Start
Scheduled: TBD
Actual: TBD
BIE-CONST-41
Project Complete
Scheduled: TBD
Actual: TBD
Project Data Sheet
Prepared/Last Updated: 2/2023
DOI Approved: Yes
Annual Operations & Maintenance Costs $
Current: $ 524,609
Projected: $ 393,457
Net Change: -$ 131,152
BIE-CONST-42
BUREAU OF INDIAN AFFAIRS
Project Data Sheet
Total Project Score/Ranking: 68
Planned Funding FY 2024: $ TBD
Funding Source: RS A1112 Education Replacement School
Project Identification
Project Title: Full Campus Replacement - Little Wound Day School
Project Number: A06-23-002
Unit/Facility Name: Little Wound Day School
Region/Area/District: Great Plains
Congressional District: 01
State: SD
Project Justification
# DOI Asset Code Real Property Unique ID # API: FCI-Before:
1 35230000 : Bldg School A06R0500301 100 0.3165
2 35500000 : Bldg Industrial A06R0500320 100 0.2014
3 35300000 : Bldg Family Housing A06R0500326 70 0.0493
4 35300000 : Bldg Family Housing A06R0500327 70 0.1076
5 35300000 : Bldg Family Housing A06R0500330 70 0.2083
6 35300000 : Bldg Family Housing A06R0500331 60 0.2930
7 35300000 : Bldg Family Housing A06R0500332 60 0.3407
8 35300000 : Bldg Family Housing A06R0500333 60 0.2062
9 35300000 : Bldg Family Housing A06R0500334 60 0.1892
10 35300000 : Bldg Family Housing A06R0500335 60 0.2779
11 35300000 : Bldg Family Housing A06R0500336 60 0.2180
12 35300000 : Bldg Family Housing A06R0500337 60 0.2822
13 35300000 : Bldg Family Housing A06R0500338 60 0.3276
14 35300000 : Bldg Family Housing A06R0500339 60 0.2427
15 35300000 : Bldg Family Housing A06R0500340 60 0.2202
16 35300000 : Bldg Family Housing A06R0500341 60 0.1986
17 35300000 : Bldg Family Housing A06R0500342 60 0.1651
18 35300000 : Bldg Family Housing A06R0500343 60 0.3248
19 35300000 : Bldg Family Housing A06R0500344 90 0.1772
20 Multi-Family Housing
BUILDING \ QUARTERS \ MULFAMHS
Maximo ID: AB222869 70 0.0000
21 Multi-Family Housing
BUILDING \ QUARTERS \ MULFAMHS
Maximo ID: AB222870 70 0.0000
22 35300000 : Bldg Family Housing A06R0500346 100 0.2971
23 Office - BUILDING \ OFFICE Maximo ID: AB222871 100 0.0000
24 Office - BUILDING \ OFFICE Maximo ID: AB222872 100 0.0000
25 35300000 : Bldg Family Housing A06R0500347 100 0.4360
26 Office - BUILDING \ OFFICE Maximo ID: AB222873 100 0.0000
27 Office - BUILDING \ OFFICE Maximo ID: AB222874 100 0.0000
28 35230000 : Bldg School A06R0500349 100 0.2732
29 35300000 : Bldg Family Housing A06R0500350 60 0.2039
BIE-CONST-43
30
35300000 : Bldg Family Housing
A06R0500351
60
0.2454
31
35600000 : Bldg Service
A06R0500352
70
0.1555
32
35230000 : Bldg School
A06R0500353
100
0.0000
33
35230000 : Bldg School
A06R0500355
100
0.2593
34
35300000 : Bldg Family Housing
A06R0500356
70
0.0831
35
35300000 : Bldg Family Housing
A06R0500357
70
0.0858
36
35300000 : Bldg Family Housing
A06R0500358
70
0.2056
37
35300000 : Bldg Family Housing
A06R0500359
70
0.1063
38
35300000 : Bldg Family Housing
A06R0500360
70
0.1229
39
35300000 : Bldg Family Housing
A06R0500361
70
0.1066
40
35300000 : Bldg Family Housing
A06R0500362
70
0.1021
41
35300000 : Bldg Family Housing
A06R0500363
70
0.0777
42
35300000 : Bldg Family Housing
A06R0500364
70
0.1258
43
35300000 : Bldg Family Housing
A06R0500365
70
0.1259
44
35300000 : Bldg Family Housing
A06R0500366
70
0.1758
45
35300000 : Bldg Family Housing
A06R0500367
70
0.0743
46
35300000 : Bldg Family Housing
A06R0500368
70
0.1160
47
35300000 : Bldg Family Housing
A06R0500369
70
0.0751
48
35300000 : Bldg Family Housing
A06R0500370
70
0.0743
49
35300000 : Bldg Family Housing
A06R0500371
70
0.1587
50
35300000 : Bldg Family Housing
A06R0500372
70
0.1286
51
35300000 : Bldg Family Housing
A06R0500373
70
0.1901
52
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222875
70
0.0000
53
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222876
70
0.0000
54
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222877
70
0.0000
55
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222878
70
0.0000
56
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222879
70
0.0000
57
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222880
70
0.0000
58
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222881
70
0.0000
59
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222882
70
0.0000
60
35300000 : Bldg Family Housing
A06R0500374
70
0.1350
61
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222883
70
0.0000
62
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222884
70
0.0000
63
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222885
70
0.0000
64
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222886
70
0.0000
65
Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222887
70
0.0000
BIE-CONST-44
66 Apartment BUILDING \ QUARTERS \
APRTMENT
Maximo ID: AB222888 70 0.0000
67 35290000 : Bldg Other Institutional Uses A06R0500376 38 0.2507
68 35230000 : Bldg School A06R0500678 100 0.1407
69 35230000 : Bldg School A06R0542202 100 0.6252
70 35230000 : Bldg School A06R0578674 100 0.3585
71 35230000 : Bldg School A06R0579675 100 0.3770
72 35230000 : Bldg School A06R0580676 100 0.4651
73 35230000 : Bldg School A06R0581677 100 0.4242
74 35230500 : Bldg School Middle A1000349220000036 100 0.0094
75 Grounds/Site Work Maximo ID: AB108432 N/A N/A
Project Description:
Little Wound School, located in Kyle, SD, is a tribally controlled school serving 727 students in grades
K – 12. This project will replace the current Little Wound campus, which consists of one main building and
several smaller support structures. Staff quarters will be evaluated in the Planning phase to determine the long
term strategy of renovation or replacement. All new academic facilities will conform to the Federal Sustainable
Building requirements and be designed using Leadership in Energy & Environmental Design (LEED) Silver
guidelines and green building products and will conserve water and energy resources to the greatest extent
possible. Upon completion of the new facilities, the existing school buildings will be disposed of.
This includes major site infrastructure activities such as assessment and possible replacement of water
distribution system, electrical distribution, and vehicular circulation. A varied approach will be applied to
pavement repair, i.e., replacing what is beyond salvaging and rehabilitating other pavements considered to be in
serviceable condition. There will be significant improvements to the athletic field areas. Improvements to the
overall site drainage and grading will include removing debris piles that have accumulated along curb gutters.
Scope of Benefits (SB):
Project Selection Criteria / Strategy Alignment:
Restore & Protect High Visitation / Public Use Facilities
Improve ADA Accessibility
Expand Recreation Opportunities and Public Access
Remediate Poorest FCI Facilities
2.1 Reduce Deferred Maintenance
2.2 Leverage Funding / Pursue Partnering Opportunities
2.3 Reduce Annual Operating Costs
2.4 Replacement of Assets
3.1 Address Safety Issues
3.2 Protect Employees / Improve Retention
4.1 Modernize Infrastructure
Investment Strategy (IS):
The entire project would be considered capital improvement.
The current existing DMWO list, upon completion of the project, will be reduced to zero.
BIE-CONST-45
New facility will reduce the Operations and Maintenance costs to those related to ongoing maintenance
of new equipment, which will provide a net reduction in O&M funding from current levels.
Consequences of Failure to Act (CFA):
Without this project operation and maintenance costs will continue to increase due to increasingly poor system
performance. Student performance will also continue to be impaired by inadequate facilities incapable of
addressing modern educational requirements.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.2433
API Rating: n/a 74
API/FCI Score: (20%) 8
SB Score: (40%) 40
IS Score: (20%) 13
CFA Score: (20%) 7
Total Score: (100%) 68
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled 06/2024
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work : $ 0 100
Capital Improvement Work: $ TBD 100
Total: $ TBD 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 0
FY 2024 Education Construction Funding (this PDS): $ TBD
FY 2024 [FLREA/FLTP/Donation, etc.] Funding: $ 0
Future Funding to Complete Project: $ TBD
Total: $ TBD
Class of Estimate: D
Estimate Escalated to: FY 2027/Q1
Planning and Design Funds:
Planning Funds Received in FY 2024: $ TBD
Design Funds Received in FY 2044: $ TBD
Major Milestones
Construction Award/Start
BIE-CONST-46
Scheduled: TBD
Actual: FY TBD
Project Complete
Scheduled: TBD
Actual: TBD
Project Data Sheet
Prepared/Last Updated: 2/2023
DOI Approved: Yes
Annual Operations & Maintenance Costs $
Current: $ 1,156,391
Projected: $ 867,293
Net Change: -$ 289,098
BUREAU OF INDIAN AFFAIRS
Project Data Sheet
Total Project Score/Ranking: 80
Previous Funding: $30,830
Planned Funding FY 2024: $TBD
Funding Source: Replacement Facility Construction (RFC) and Facility Improvement & Repair (FI&R)
Project Identification
Project Title: Wa He Lut Indian School, School Replacement (RS)
Project Number: TBD
Unit/Facility Name: Wa He Lut Indian School
Region/Area/District: Northwest Region
Congressional District: 01
State: AZ
Project Justification
DOI Asset Code Real Property Unique ID # API: FCI-Before:
1 40800000 : All Other A1000351520000001 100 0.0223
2 35500200 : Bldg Pump House Well House A1000351520000005 100 0.0113
3 40710300 : Water Treatment Facility A1000351520000003 100 0.3061
4 35230400 : Bldg School Elementary A1000351520000000 100 0.3020
5 35291100 : Bldg Gymnasium A1000351520000002 100 0.3286
6 35230400 : Bldg School Elementary A1000351520000006 100 0.0904
7 35410700 : Bldg Warehouse Warehouse A1000351520000004 70 0.0000
8
School grounds are located next to the
Nisqually River
GROUNDS
Maximo ID: AB108520 N/A N/A
Project Description:
Wa He Lut Indian School, located in Olympia, Washington is a Northwest Region tribally controlled school
serving 115 students in grades K – 8. This project will partially replace and renovate the current Wa He Lut
Indian School campus, which consists of 7 major buildings and several smaller support structures. All
renovated and replaced academic facilities will conform to the Federal Sustainable Building requirements and
be designed using Leadership in Energy & Environmental Design (LEED) Silver guidelines and green
building products and will conserve water and energy resources to the greatest extent possible. Upon
completion of the new facilities, the existing school buildings that have been replaced will be disposed of.
This includes major site infrastructure activities such as: Replacement of the water distribution system with
new water main piping which will create a looped network around the campus. Replacement of sanitary sewer
collection and electrical distribution system. Application of a varied approach to pavement repair, i.e.,
replacing what is beyond salvaging and rehabilitating other pavements considered to be in serviceable
condition. Significant improvements to the athletic field areas. Improvement to the overall site drainage and
grading include removing debris piles that have accumulated along curb gutters.
BIE-CONST-47
BIE-CONST-48
Scope of Benefits (SB):
Project Selection Criteria / Strategy Alignment:
1.1 Restore & Protect High Visitation / Public Use Facilities
1.2 Improve ADA Accessibility
1.3 Expand Recreation Opportunities and Public Access
1.4 Remediate Poorest FCI Facilities
2.1 Reduce Deferred Maintenance
2.2 Leverage Funding / Pursue Partnering Opportunities
2.3 Reduce Annual Operating Costs
2.4 Replacement of Assets
3.1 Address Safety Issues
3.2 Protect Employees / Improve Retention
4.1 Modernize Infrastructure
Investment Strategy (IS):
The entire project would be considered capital improvement.
Deffered Maintenace Work Order (DMWO) list, upon completion of the project, will be reduced to
zero.
New facility will reduce the Operations and Maintenance (O&M) costs to those related to ongoing
maintenance of new equipment, which will provide a net reduction in O&M funding from current
levels.
Consequences of Failure to Act (CFA):
Without this project operation and maintenance costs will continue to increase due to increasingly poor
system performance. Student performance will also continue to be impaired by inadequate facilities
incapable of addressing modern educational requirements.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.3051
API Rating: n/a 96
API/FCI Score: (20%) 20
SB Score: (40%) 40
IS Score: (20%) 14
CFA Score: (20%) 6
Total Score: (100%) 80
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled 4/25
BIE-CONST-49
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work : $ TBD TBD
Capital Improvement Work: $ TBD TBD
Total: $ TBD TBD
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 30,830
FY 2024 A1114 & A1116 Funding (this PDS): $ TBD
Future Funding to Complete Project: $ 0
Total: $ TBD
Class of Estimate: D
Estimate Escalated to: FY22/Q4
Planning and Design Funds:
Planning Funds Received in FY 2024:* $ TBD
Design Funds Received in FY 2024:* $ TBD
Major Milestones
Construction Award/Start
Scheduled: FY 2025/Q4
Actual: FY 202#/Q#
Project Complete
Scheduled: FY 2027/Q4
Actual: FY 202#/Q#
Project Data Sheet
Prepared/Last Updated: 3/23
DOI Approved: Yes
Annual Operations & Maintenance Costs $
Current: $ 279,779
Projected: $ 209,834
Net Change: -$ 69,945
BIE-CONST-50
BUREAU OF INDIAN AFFAIRS
Project Data Sheet
Total Project Score/Ranking: 77
Planned Funding FY 2024: $TBD
Planned Funding FY 2025: $TBD
Planned Funding FY 2026: $TBD
Funding Source: Replacement Facility Construction (RFC) and Facility Improvement & Repair (FI&R)
Project Identification
Project Title: San Ildefonso Day School, RFC & FI&R
Project Number: TBD
Unit/Facility Name: IE131 San Ildefonso Day School
Region/Area/District: Navajo Region
Congressional District: 01
State: AZ
Project Justification
DOI Asset Code Real Property Unique ID # API: FCI-Before:
1 35290000 : Bldg Other Institutional Uses M25R1300709 100 0.0336
2 Other Maximo ID: AB107452 100 0.0000
3 School, Other, Boarding Maximo ID: AB107453 100 0.2151
4 35230000 : Bldg School M25R1300701 100 0.2781
5 35410000 : Bldg Warehouses M25R1300707 100 0.5557
6 35230000 : Bldg School M25R1300710 100 0.0464
7 35230000 : Bldg School M25R1300711 100 0.0394
8
Location San Ildefonso Day School
GROUNDS
Maximo ID: AB108479 N/A N/A
Project Description:
San Ildefonso Day School, located on the San Ildefonso Pueblo in New Mexico serves 35 students in grades K
– 6. This project will replace the current San Ildefonso Day School campus, which consists of 7 major
buildings and several smaller support structures. All new academic facilities will conform to the Federal
Sustainable Building requirements and be designed using Leadership in Energy & Environmental Design
(LEED) Silver guidelines and green building products and will conserve water and energy resources to the
greatest extent possible. Upon completion of the new facilities, the existing school buildings will be disposed
of.
This includes major site infrastructure activities:
Replacement of water distribution, sanitary sewer, and electrical distribution systems.
Application of a varied approach to pavement repair, i.e., replacing what is beyond salvaging and
rehabilitating other pavements considered to be in serviceable condition.
Significant improvements to the athletic field areas.
Improvement to the overall site drainage and grading include removing debris piles that have
accumulated along curb gutters.
BIE-CONST-51
Scope of Benefits (SB):
Project Selection Criteria / Strategy Alignment:
1.1 Restore & Protect High Visitation / Public Use Facilities
1.2 Improve ADA Accessibility
1.3 Expand Recreation Opportunities and Public Access
1.4 Remediate Poorest FCI Facilities
2.1 Reduce Deferred Maintenance
2.2 Leverage Funding / Pursue Partnering Opportunities
2.3 Reduce Annual Operating Costs
2.4 Replacement of Assets
3.1 Address Safety Issues
3.2 Protect Employees / Improve Retention
4.1 Modernize Infrastructure
Investment Strategy (IS):
The entire project would be considered capital improvement.
Deffered Maintenace Work Order (DMWO) list, upon completion of the project, will be reduced to
zero.
New facility will reduce the Operations and Maintenance (O&M) costs to those related to ongoing
maintenance of new equipment, which will provide a net reduction in O&M funding from current
levels.
Consequences of Failure to Act (CFA):
Without this project operation and maintenance costs will continue to increase due to increasingly poor
system performance. Student performance will also continue to be impaired by inadequate facilities
incapable of addressing modern educational requirements.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.2538
API Rating: n/a 100
API/FCI Score: (20%) 20
SB Score: (40%) 40
IS Score: (20%) 12
CFA Score: (20%) 5
Total Score: (100%) 77
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled 6/26
BIE-CONST-52
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work : $ TBD TBD
Capital Improvement Work: $ TBD TBD
Total: $ TBD TBD
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 0
FY 2024 A1114 & A1116 Funding (this PDS): $ TBD
Future Funding to Complete Project: $ TBD
Total: $ TBD
Class of Estimate: D
Estimate Escalated to: FY22/Q4
Planning and Design Funds:
Planning Funds Received in FY 2024: $ TBD
Design Funds Received in FY 2024: $ TBD
Major Milestones
Construction Award/Start
Scheduled: FY 2025/Q4
Actual: FY 202#/Q#
Project Complete
Scheduled: FY 2028/Q4
Actual: FY 202#/Q#
Project Data Sheet
Prepared/Last Updated: 3/23
DOI Approved: Yes
Annual Operations & Maintenance Costs $
Current: $ 109,449
Projected: $ 82,087
Net Change: -$ 27,362
Legacy Restoration Fund (GAOA)
BIE-GAOA-1
National Parks and Public Land Legacy Restoration Fund (LRF)
Great American Outdoors Act
Bureau of Indian Education
Program Overview
The Great American Outdoors Act (GAOA) is historic legislation that combines a financial commitment
to conservation and recreation for future generations with a significant investment in the facilities needed
to carry out Interior’s important mission, including the care and maintenance of America’s national
treasures. This investment provides an unprecedented opportunity to address the Department of the
Interior’s deferred maintenance backlog and restore deteriorating assets. To do so effectively requires
investment prioritization and a sound program execution and management strategy.
The Department of the Interior is responsible for administering and implementing GAOA’s National
Parks and Public Land Legacy Restoration Fund (LRF) program, which is shared with the U.S. Forest
Service. For fiscal years 2021 through 2025, Congress authorized up to $1.9 billion annually to be
deposited in the LRF Fund for projects that address deferred maintenance. The annual deposit is equal to
50 percent of energy development revenues from oil, gas, coal, alternative, or renewable energy on
Federal land and water credited, covered, or deposited into the Treasury as miscellaneous receipts under
Federal law in the preceding fiscal year.
BIE GAOA LRF Program
The BIE’s FY 2024 GAOA LRF list builds upon a total campus replacement project derived from the
2019 SA-CI list at Shonto Preparatory School by investing a second year of funding in the school’s
quarters for teachers and staff. BIE’s FY 2024 list also requests funding to commence a total campus
replacement of Kinteel Residential Campus starting with replacing the dormitory, bus shelter, and
maintenance shop. The estimated deferred maintenance addressed for Shonto Preparatory School
Quarters is approximately $5.2 million, and the estimated deferred maintenance addressed for Kinteel
Residential Campus is approximately $11.3 million, for a total amount of $16.5 million. These deferred
maintenance figures are based on deferred work orders at each site that will be retired by the construction
of the new campuses. These deferred maintenance addressed estimates reflect work orders that BIE
expects to close at project completion. These estimates are for all fiscal years that the projects are to be
funded and they are not prorated by specific fiscal year.
FY 2023 Planned Accomplishments
The BIE’s FY 2023 GAOA LRF list is comprised of a total campus replacement project at Shonto
Preparatory School and replacement and major renovation and additional new units of employee quarters
at Wounded Knee District School. The Shonto Preparatory School projects will address approximately
$48.3 million in deferred maintenance, and the Wounded Knee Quarters project is expected to address
approximately $4.4 million, for a total deferred maintenance addressed of $52.7 million.
BIE-GAOA-2
BIE GAOA Legacy Restoration Fund Projects
FY 2024 Bureau of Indian Education Allocation Summary Table
(Dollars in Thousands)
Budget Authority/Activity Amount
FY 2024 Allocation (estimate) 95,000
FY 2024 Sequestration (estimate) -5,415
FY 2024 Previously Unavailable (from FY 2023) 5,415
FY 2024 Proposed Projects 95,000
Total Available/Unallocated (estimate) 0
Selection Process
BIE focuses its strategy on three priority areas to identify projects: accelerate the completion of the
Replacement Construction and Facility Improvement and Repair (FI&R) backlog; demolition of unsafe
and uninhabitable buildings and provide for safe campus environments; and Quarters Improvement and
Repair, which significantly affects the health and retention of school staff that reside in these quarter
units. The FY 2024 project list meets the Assistant Secretary-Indian Affairs (AS-IA) and BIE’s vision to
improve the safety and overall condition of education facilities, address the deferred maintenance
backlog, protect critical resources, and provide environments conducive to learning.
Indian Affairs (IA) selects school locations for consideration using the Education Site Assessment Capital
Investment (SA-CI) Program according to the following criteria:
Facility Condition Index (FCI) of >0.10 (Poor Condition); or
Facilities that are 50 years of age or older; and
75% or more of students are educated in portable facilities; and
Not already addressed by another program (FI&R, Facility Replacement, No Child Left Behind).
BIE Process - IA followed the September 2021 Indian Affairs Manual (80 IAM 11) “Education
Construction Site Assessment and Capital Investment Program” process for completing holistic
assessments and recommending actions to the IA Facilities Investment Review Board (FIRB) for
approval. GAOA LRF Projects were selected, prioritized, and approved by the FIRB according to
program needs.
Project List
Consistent with Congressional direction, BIE submits the following Legacy Restoration Fund projects as
part of the FY 2024 Budget process. Detailed project data sheets will be submitted separately for each
identified project. The project lists below have been thoroughly considered and vetted and are considered
ready for implementation in FY 2024. The Department will keep Congress informed should the
circumstances of a specific project change during the course of the FY 2024 Budget process.
The FY 2024 project list below assumes the full $1.9 billion allowable for deposit into the Legacy
Restoration Fund is realized. Because determination of the deposit relies on the amount of qualifying
BIE-GAOA-3
energy revenue collected in the prior year, the actual amount available for FY 2024 projects will not be
finalized until the start of FY 2024. Projects listed below are ranked and prioritized. BIE will select and
implement projects based on the prioritized list below until the LRF allocation is exhausted net of the
mandatory funding sequester (5.7% of funding) and previously unavailable (sequestration “pop up”).
Projects not funded with the FY 2024 allocation may be considered for FY 2025 implementation.
FY 2024 Bureau of Indian Education GAOA LRF Project List
(Dollars in Thousands)
Unique
ID Priority
Station or
Unit Name Project/Activity Title State
Cong.
District
Funding
Estimate
Estimated
DM
Addressed
E014 1 Shonto
Preparatory
School
Shonto Preparatory School
Employee Housing New
(Replacement) or
Improvement Repair
AZ AZ01 27,364 5,211
E015 2 Kinteel
Residential
Campus
New School Construction NM NM03 49,300 11,331
Program Administration
(Indirect Costs)
2,850
Contingency Fund 15,486
Total 95,000** 16,542*
*Estimated deferred maintenance numbers reflect the maintenance and repair work that will be addressed upon
completion of the project, not within the funding year.
**Total amount is net of FY 2024 sequestration and previously unavailable (sequestration “pop-up”).
FY 2024 Planned Accomplishments
Shonto Preparatory School Employee Housing New (Replacement) or Improvement Repair:
FY 2024 GAOA LRF funding will complete funding for the Shonto Preparatory Quarters, located in the
Navajo region. This project will consist of the replacements and major renovations of employee quarters
resulting in approximately $5.2 million of deferred maintenance addressed and is anticipated to reduce
operating costs and improve energy efficiency going forward.
Kinteel Residential Campus:
FY 2024 GAOA LRF funding will partially fund the total campus replacement of Kinteel Residential
Campus. The BIE estimates approximately $11.3 million of deferred maintenance will be retired at the
completion of this project and is anticipated to reduce operating costs and improve energy efficiency
going forward. In addition to substantially reducing BIE’s deferred maintenance backlog, this project will
also improve energy efficiency and safety while providing an educational environment conducive to
learning, in accordance with BIE’s project selection criteria.
Permanent Appropriations
DEPARTMENT OF THE INTERIOR
BUREAU OF INDIAN EDUCATION
PERMANENT APPROPRIATIONS
14-8361 Gifts and Donations
BIE-PERM-1
GIFTS AND DONATIONS
(Dollars in thousands)
Account
2022
Enacted
2023
Enacted
2024
Fixed
Costs
(+/-)
2024
Internal
Transfers
(+/-)
2024
Program
Changes
(+/-)
2024
Request
Change
from
2023
Enacted
(+/-)
Gifts and Donations
925
1,000
1,000
0
FTE
6
7
7
0
Total Requirements
925
1,000
1,000
0
Total FTE
6
7
7
0
Gifts and Donati
ons ($1,000,000 / 7 FTE)
Overview
Donations and contributed funds. ——The Secretary of the Interior may accept donations of funds or
other property, and may use the donated property in accordance with the terms of the donation in
furtherance of any programs authorized by other provision of law for the benefit of Indians (25 U.S.C.
451). 
BIE-PERM-2
Appendices
Program Descriptions Table
Description of BIE Programs
(This table only outlines existing funds through 2023 within individual program elements. Descriptions do not include any funding that is being requested in FY 2024.)
Func.
Area
Title Description
OPERATION OF INDIAN EDUCATION PROGRAMS
BUREAU OF INDIAN
EDUCATION
Education is critical to ensuring a viable and prosperous future for tribal
communities and supports the Department’s effort to serve these
communities. The BIE serves approximately 45,000 students in 183 schools
and dormitories located in 23 states. BIE operates two colleges at the post-
secondary level, administers grants for 29 Tribally operated colleges, and
funds two tribal technical colleges.
Elementary and Secondary
(forward funded)
A0E30
ISEP Formula Funds The ISEP formula funds serve as the primary funding source for educational
programs at BIE-funded elementary and secondary schools. These funds
are the single largest component of BIE funding and are provided directly to
schools. Funds cover the majority of the costs of running elementary and
secondary education programs including teacher and administrative salaries,
basic instruction, gifted and talented programs, residential programs, food
services, and summer programs.
A0E31
ISEP Program Adjustments The ISEP Program Adjustments funding enables BIE-funded schools to
respond to specific findings of need or deficiencies, provide safe and secure
programs, security contracts, and behavioral health services.
A0E43
Education Program
Enhancements
The Education Program Enhancement subactivity enables BIE to provide
services and necessary resources to meet the unique needs and priorities of
individual tribes and their schools, by providing school improvement
initiatives, native language programs, and teacher retention and recruitment.
A0E47
Tribal Education Departments This program aims to build the capacity of Tribal Education Departments
(TEDs) so they can coordinate educational services within reservations to
serve all tribal members better. The program creates opportunities to
strengthen TED's engagement with other school systems operating within
tribal reservations. The program works to strengthen the management and
oversight of the education programs, including BIE-funded schools, school
operations, adult education, scholarships, and other programs funded by the
tribe and other Federal agencies under their jurisdiction. The first step for
many tribes is adopting and updating tribal education codes to align a tribal
education vision with policy. The goal is to prioritize tribes with more than
three BIE-funded schools on their reservation to establish a Tribally
managed school system.
A0E32
Student Transportation The BIE Transportation funds are used to pay for bus leases, fuel,
maintenance, vehicle replacement, driver salaries, and staff training for bus
drivers and transportation managers. In addition, BIE Transportation funds
also cover the commercial costs of transporting students to boarding schools
within the BIE school system at the beginning and end of each school year;
some students are provided an additional round trip home at mid-year.
Appendix 1-1
Description of BIE Programs
(This table only outlines existing funds through 2023 within individual program elements. Descriptions do not include any funding that is being requested in FY 2024.)
A0E33
Early Childhood and Family
Development
The program offers support for Family and Child Education (FACE) sites
and early childhood activities. Funds assist tribes in addressing the
achievement gap for Indian children up to five years of age primarily
located on rural reservations by teaching preschoolers and their families the
skills needed to begin school. In addition, the preschool program will
provide school readiness for standard-based kindergarten and establish
parent engagement between home and school.
A0E34
Tribal Grant Support Costs Tribal Grant Support Costs are designed to ensure that BIE provides the
necessary administrative costs that accompany the operation and
management of Tribally controlled elementary or secondary educational
programs. Tribes operating BIE-funded schools use these funds to cover the
overhead costs of running a school, meet legal requirements, and carry out
support functions that BIE would otherwise provide directly.
Elementary/Secondary
Programs
A0E35
Facilities Operations Schools are operated and maintained to ensure their continued safety and
usefulness for educational purposes. The program funds operational
expenses for educational facilities at BIE-funded schools and dorms it has in
the school system. The everyday costs of operating BIE-funded schools are
electricity, heating fuels, communications, grounds maintenance, vehicle
rental (excluding school buses), refuse collection, custodial services, pest
control, water, sewer service, fire/intrusion monitoring, and operations
program administration.
A0E45
Facilities Maintenance Funds requested for Facilities Maintenance will be used to conduct
preventive, routine cyclic, and unscheduled maintenance for all school
buildings, equipment, utility systems, and ground structures.
A0E37
Juvenile Detention Center
Education
The Juvenile Detention Education program is designed to meet the
education and health-related needs of American Indian and Alaska Native
youth detained or incarcerated in BIA-funded juvenile detention centers for
an extended period of time. This subactivity coordinates with the student’s
home, Indian Health Service, and the Office of Tribal Justice Support to
allow for the continuous education of the student in the core subjects of
math and language arts during the student’s absence from school.
A0E90
Johnson-O'Malley Assistance
Grants (TPA)
The majority of American Indian and Alaska Native students attend public
schools. JOM grants provide these students with resources that help them
stay in school and increase their chances of success. Typically, these funds
offer remedial instruction, counseling, and cultural programs and cover
small but important needs such as school supplies and items that enable
recipients to participate in curricular and extra-curricular programs.
Post Secondary Programs
(forward funded)
Appendix 1-2
Description of BIE Programs
(This table only outlines existing funds through 2023 within individual program elements. Descriptions do not include any funding that is being requested in FY 2024.)
A0E38
Haskell and SIPI (forward
funded)
The BIE’s two directly operated post-secondary institutions serve Indian
students from federally recognized tribes throughout the country. Haskell
and SIPI utilize these funds to pay for administrative, instructional,
dormitory, and other support staff and supplies, materials, textbooks, and
food. Haskell and SIPI also use these funds to provide residential, athletic,
and other student support services. In addition to funding from the BIE,
Haskell and SIPI are eligible for Department of Education funds (both
individual student funds and institutional funds), U.S. Department of
Agriculture funding, and competitive grants from Federal, public, and
private agencies.
A0E44
Tribal Colleges and
Universities (forward funded)
The Tribal Colleges and Universities address the needs of some of the most
economically depressed regions in Indian Country. The colleges are
primarily located on remote reservations and serve American Indian
communities with limited access to other post-secondary institutions.
Chartered by tribal governing bodies and governed by local boards of
regents, TCUs are predominantly two-year institutions that successfully
overcome longstanding barriers to Indian higher education. The tribal
colleges strictly adhere to the standards of mainstream accreditation
associations.
A0E48
Tribal Technical Colleges
(Forward Funded)
Tribal Technical Colleges (forward funded) program provides funding for
United Tribes Technical College (UTTC) and Navajo Technical University
(NTU). The program supports core functions (e.g., classroom instruction
and school operations) at the two colleges partially funded by BIE. Tribal
technical colleges provide resources and facilities to teach community
members the skills they need to succeed in the workforce and overcome
barriers to Indian higher education while supporting economic development
on their reservations.
Post Secondary Programs
A0E92
Tribal Colleges & Universities
Supplements (TPA)
Tribes may choose to direct Tribal Priority Allocations (TPA) funds to
supplement the operation of their Tribal Colleges and Universities. Funds
are used for policy development, curriculum additions, and general program
operations designed to meet the specific needs of their community members.
A0E93
Scholarships and Adult
Education (TPA)
The Scholarships and Adult Education program addresses Indian
Education's objectives to : 1) improve communities’ quality of life by
developing economies, 2) improve the success of students at each
educational level by providing financial assistance for eligible students, and
3) increase students engagement with Science, Technology, Engineering,
and Mathematics (STEM) related initiatives. The program further supports
the commitment to expand educational opportunities for students.
Appendix 1-3
Description of BIE Programs
(This table only outlines existing funds through 2023 within individual program elements. Descriptions do not include any funding that is being requested in FY 2024.)
A0E40
Special Higher Education
Scholarships
The Special Higher Education Scholarships Program (SHEP) supports the
BIE’s goals for education through supplemental financial assistance to
Indian students for graduate-level study. Emphasis is placed on students
pursuing law, education, medicine, natural resources, engineering, business
administration, and social work. The Loan for Service Program is designed
to provide financial assistance through loans to eligible Native American
degree candidates who seek employment with BIE, BIA, or a federally
recognized tribe upon graduation. A “service payback” (employment)
agreement allows recipients to agree to work for BIE, BIA, or federally
recognized tribe to repay their loans. Each academic year of funding
requires one year of service. The program is designed to bring professionals
to Native communities.
A0E46
Science Post Graduate
Scholarship Fund
The Science Post-Graduate Scholarship Fund (SPGSF) program provides
funding and awards for post-secondary and post-graduate-level fellowships
and training opportunities. These awards are provided in science,
technology, engineering, and mathematics (STEM), such as agricultural,
geological, biological, life sciences, computing, communications,
networking, information technology, and biomedical programs.
Education Management
A0E50
Education Program
Management
The Education Program Management (EPM) provides oversight of the
Headquarters office in Washington, D.C., BIE Albuquerque Center, ADD
offices, and a field organization of fifteen Education Resource Centers
(ERC). Central management provides policy direction and exercises line
authority over ERC and two BIE funded post-secondary institutions. In
addition, BIE management provides oversight to local on-reservation day
and boarding schools, off-reservation residential schools, and peripheral
dormitories housing students attending public schools. Leadership and
support services carried out by BIE EPM staff includes: data collection,
analysis, reporting, coordinated fiscal management, risk assessments with
corrective actions, targeted monitoring activities, major fiscal repairs,
technical assistance, budget execution and formulation, and financial and
accounting functions.
A0E41
Education IT The BIE information technology (IT) requirements encompass the multiple
and varied needs of students, administrators, teachers, and Headquarters
staff. This program funds BIE IT infrastructure, including the Educational
Native American Network (ENAN), which provides the technical
infrastructure that connects BIE locations and the Internet and the Native
American Student Information System (NASIS), a web-based application
for BIE data collection and analysis. The program also addresses the
increasing need for bandwidth and support of high-cost special fiber
construction efforts, as well as the increasing monthly circuit costs for
schools in remote locations. In addition, the program supports distant
learning by enhancing BIE educational technology in deploying a standard
Education Learning Management System (eLMS) across BIE-operated
schools and ensuring students have functional laptops and equipment to
obtain a Wi-Fi signal.
CONSTRUCTION
Appendix 1-4
Description of BIE Programs
(This table only outlines existing funds through 2023 within individual program elements. Descriptions do not include any funding that is being requested in FY 2024.)
EDUCATION
CONSTRUCTION
The Education Construction program provides safe, functional, energy-
efficient, and universally accessible facilities through improvements and
repairs to Indian schools. The Education Construction program supports
education goals by rehabilitating reservation schools to provide an
environment conducive to quality educational achievement and improved
opportunities for Indian students.
A1112
Replacement School
Construction
The Replacement School Construction program replaces entire school
campuses in poor condition prioritized on a school replacement list.
A1116
Replacement Facility
Construction
Funds are used to replace individual facilities on school campuses when
replacing the entire school campus is not warranted.
A1110
Replacement/New Employee
Housing
This program addresses the need and availability of adequate housing, an
essential component for the recruitment and retention of BIE teachers.
A1113
Employee Housing Repair The Employee Housing Repair program funds site level and major repairs
along with remediation of health and safety deficiencies and complies with
the Department of the Interior’s commitment to providing Federal
employees with living quarters that are safe, functional, energy-efficient,
and cost-effective. The program includes space reduction goals to eliminate
uninhabitable or excess units.
A1114
Facilities Improvement and
Repair (FI&R)
Funds are used to improve the safety and functionality of facilities. The BIE
seeks to maximize the use of existing educational facilities by improving or
rehabilitating these facilities in place of new construction.
A1111
Tribal Colleges FI&R Funds are provided to address significant unfunded facilities improvement
and repairs at Tribal Colleges and Universities (TCUs).
Appendix 1-5
Tribal Priority Allocations by
Location
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
ACTIVITY
SubActivity
GREAT
PLAINS
REGION
TOTAL
Flandreau
Santee Sioux
Tribe
Cheyenne
River Sioux
Tribe
Three
Affiliated
Tribes of Fort
Berthold
Spirit Lake
Tribe
Oglala Sioux
Tribe of Pine
Ridge
Rosebud
Sioux Tribe
Yankton
Sioux Tribe
Ponca Tribe
of Nebraska
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 1,449 36 27 62 83 496 227 6 5
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 4,693 2 3 45 1 1,255 908 260
Tribal Colleges & Universities Supplements (TPA) 714 74 353 194
TOTAL, TPA BASE FUNDING 6,857 38 30 182 83 2,104 1,329 266 5
ACTIVITY
SubActivity
Sisseton-
Wahpeton Oyate
of The Lake
Traverse
Reservation
Standing
Rock Sioux
Tribe
Turtle
Mountain
Band of
Chippewa
Indians
Trenton
Indian Service
Area
Omaha Tribe
of Nebraska
Santee Sioux
Nation
Winnebago
Tribe
Crow Creek
Sioux Tribe
Lower Brule
Sioux Tribe
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 87 128 98 13 91 15 29 41 5
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 319 33 1,520 144 117 87
Tribal Colleges & Universities Supplements (TPA) 93
TOTAL, TPA BASE FUNDING 406 160 1,711 13 91 160 29 158 92
Appendix-2-1
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
ACTIVITY
SubActivity
SOUTHERN
PLAINS
REGION
TOTAL
Iowa Tribe of
Kansas and
Nebraska
Prairie Band
of Potawatomi
of Kansas
Cheyenne and
Arapaho
Tribes of
Oklahoma
ANADARKO
AGENCY
Wichita and
Affiliated
Tribes of
Oklahoma
Caddo Nation
of Oklahoma
Comanche
Nation,
Oklahoma
Apache Tribe
of Oklahoma
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 245 9 15 159 1
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 3,126 520 240 3 323 823 204
TOTAL, TPA BASE FUNDING 3,371 9 15 679 240 4 323 823 204
ACTIVITY
SubActivity
Kiowa Indian
Tribe of
Oklahoma
Otoe-
Missouria
Tribe of
Oklahoma
Pawnee
Nation of
Oklahoma
Iowa Tribe of
Oklahoma
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 6 23 23 8
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 795 147 8 63
TOTAL, TPA BASE FUNDING 802 170 31 71
Appendix-2-2
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
ACTIVITY
SubActivity
ROCKY
MOUNTAIN
REGION
TOTAL
Blackfeet
Tribe Crow Tribe
Fort Belknap
Community
Council
Assiniboine
and Sioux
Tribes - Fort
Peck
Northern
Cheyenne
Tribe, Inc.
Northern
Arapaho
Tribe
Eastern
Shoshone
Tribe
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 806 192 139 68 144 86 88 89
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 2,458 576 448 3 417 530 273 212
Tribal Colleges & Universities Supplements (TPA) 359 359
TOTAL, TPA BASE FUNDING 3,623 768 587 71 561 975 360 301
Appendix-2-3
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
WEST-CENTRAL AGENCY
ACTIVITY
SubActivity
ALASKA
REGION
TOTAL
WEST-
CENTRAL
ALASKA
AGENCY
Native Village
of Akhiok
Chickaloon
Native Village
Native Village
of Kluti-Kaah
Village of Old
Harbor
Native Village
of Port Lions
Qagan
Tayagungin
Tribe
(Sand Point)
Sun'aq Tribe
of Kodiak
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 854 321 2 29 9 4 29
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 637 253 11 22 40 23 27
TOTAL, TPA BASE FUNDING 1,490 574 13 29 31 40 27 27 29
BETHEL AGENCY
ACTIVITY
SubActivity
Village of
Aniak
Village of
Chefornak
Emmonak
Village
Native Village
of Hooper
Bay
Village of
Kalskag
Native Village
of
Kongiganak
Village of
Kotlik
Native Village
of
Kwigillingok
Native Village
of Marshall
Native Village
of Goodnews
Bay
Native Village
of Napaskiak
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 27 8 0.2
13 7 8 7 2 10 7 10
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 18
TOTAL, TPA BASE FUNDING 27 8 0.2
13 7 8 7 20 10 7 10
ACTIVITY
SubActivity
Nunakauyar-
miut Tribe
Newtok
Traditional
Council
Native Village
of Nightmute
Native Village
of
Nunapitchuk
Village of
Ohogamiut
Iqugmiut
Traditional
Council
(Russian
Mission)
Algaaciq
Native Village
(St. Mary's)
Native Village
of Tununak
Umkumiute
Native Village
Native Village
of
Chuathbaluk
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 17 9 0.4 4 9 10 9 4 1 5
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 0.4 25
TOTAL, TPA BASE FUNDING 17 9 0.4
4 9 10 34 4 1 5
Appendix-2-4
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
FAIRBANKS AGENCY
ACTIVITY
SubActivity
FAIRBANKS
AGENCY
Village of
Anaktuvuk
Pass Arctic Village
Native Village
of Atqasuk
(Atkasook)
Chalkyitsik
Village
Village of Dot
Lake
Organized
Village of
Grayling
Holy Cross
Village
Hughes
Village Huslia Village
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 193 2 6
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 32 3 10 18 3 10 13 8 1
TOTAL, TPA BASE FUNDING 225 3 10 18 3 12 6 13 8 1
ACTIVITY
SubActivity
McGrath
Native Village
Northway
Village
Native Village
of Point Hope
Rampart
Village
Village of
Venetie
Fairbanks
Native
Association,
Inc.
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 10 9 1 3 30
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 9 12
TOTAL, TPA BASE FUNDING 10 9 1 12 12 30
NOME AGENCY
ACTIVITY
SubActivity
Native Village
of Kiana
Native Village
of Kivalina
Native Village
of Noatak
Native Village
of Selawik
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 12 0.2
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 21 16
TOTAL, TPA BASE FUNDING 12 0.2 21 16
SOUTHEAST AGENCY
ACTIVITY
SubActivity
SOUTHEAST
AGENCY
Angoon
Community
Association
(IRA)
Craig Tribal
Association
Wrangell
Cooperative
Association
Douglas
Indian
Association
(IRA)
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 1 27
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 0.5 12 30 19
TOTAL, TPA BASE FUNDING 0.5 1 12 30 46
Appendix-2-5
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
ACTIVITY
SubActivity
MIDWEST
REGION
TOTAL
Sac & Fox
Tribe of
Mississippi In
Iowa
Minnesota
Chippewa
Tribe
Bad River
Band of
Chippewa
Indians
Lac Courte
Oreilles
Lac Du
Flambeau
Chippewa
Red Cliff
Band of
Chippewa
Upper Sioux
Indian
Community
Lower Sioux
Indian
Community
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 678 38 277 46 80 52 1 9 11
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 672 187
TOTAL, TPA BASE FUNDING 1,351 38 277 46 80 240 1 9 11
ACTIVITY
SubActivity
Shakopee
Mdewakanton
Sioux
Community
Menominee
Indian Tribe
of Wisconsin
Hannahville
Indian
Community
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 14 135 15
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 485
TOTAL, TPA BASE FUNDING 14 620 15
Appendix-2-6
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
ACTIVITY
SubActivity
EASTERN
OKLAHOMA
REGION
TOTAL
Ottawa Tribe
of Oklahoma
Peoria Tribe
of Indians of
Oklahoma
Muscogee
(Creek)
Nation,
Oklahoma
Seminole
Nation of
Oklahoma
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 954 830 124
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 549 21 62 466
TOTAL, TPA BASE FUNDING 1,503 21 62 830 590
Appendix-2-7
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
ACTIVITY
SubActivity
WESTERN
REGION
TOTAL
Colorado
River Indian
Tribes
White
Mountain
Apache Tribe
Tohono
O'odham
Nation of
Arizona
Pascua Yaqui
Tribe of
Arizona
San Carlos
Apache Tribe
Fallon Paiute-
Shoshone
Tribe
Fort
McDermott
Paiute-
Shoshone
Tribe
Lovelock
Paiute Tribe
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 1,293 57 265 144 157 348 25 1 2
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 2,699 147 422 844 879 1
Tribal Colleges & Universities Supplements (TPA) 146 146
TOTAL, TPA BASE FUNDING 4,139 204 688 1,134 157 1,227 25 1 2
ACTIVITY
SubActivity
Pyramid Lake
Paiute Tribe
Reno-Sparks
Indian Colony
Summit Lake
Paiute Tribe
Walker River
Paiute Tribe
Yerington
Paiute Tribe
Yomba
Shoshone
Tribe
Skull Valley
Band of
Goshute Tribe
Ute Indian
Tribe of The
Uintah &
Ouray
Reservation
Cocopah
Indian Tribe
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 40 24 26 18 3 79 18
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 9 107 2 69 12
Tribal Colleges & Universities Supplements (TPA)
TOTAL, TPA BASE FUNDING 40 24 9 26 125 3 2 148 30
ACTIVITY
SubActivity
Quechan Tribe
of the Fort Yuma
Indian
Reservation
Te-Moak
Tribe of
Western
Shoshone
Hopi Tribe of
Arizona
SOUTHERN
PAIUTE
AGENCY
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 51 27 10
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 62 110 34
Tribal Colleges & Universities Supplements (TPA)
TOTAL, TPA BASE FUNDING 113 137 10 34
Appendix-2-8
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
ACTIVITY
SubActivity
PACIFIC
REGION
TOTAL
Guidiville
Rancheria
NORTHERN
CALIFORNIA
AGENCY
Pauma Band of
Luiseno Mission
Indians
Santa Ynez Band
of Chumash
Mission Indians
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 10 0.4
8 2
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 7 7
TOTAL, TPA BASE FUNDING 16 0 7 8 2
Appendix-2-9
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
ACTIVITY
SubActivity
SOUTHWEST
REGION
TOTAL
Pueblo of
Acoma
Pueblo of
Isleta
Pueblo of
Sandia
Pueblo of
Santa Ana
Pueblo of
Santo
Domingo Pueblo of Zia
Pueblo of
Laguna
NORTHERN
PUEBLOS
AGENCY
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 518 74 59 0 27 81 20 45
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 1,573 134 121 4 44 155 77 51
TOTAL, TPA BASE FUNDING 2,092 208 181 5 71 237 98 45 51
ACTIVITY
SubActivity Pueblo of Nambe
Southern Ute
Tribe
Ute Mountain
Tribe
Jicarilla
Apache
Nation
Ramah
Navajo School
Board
Pueblo of San
Ildefonso
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 19 42 64 3
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 40 69 127 272 367 35
TOTAL, TPA BASE FUNDING 40 89 169 337 370 35
Appendix-2-10
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
ACTIVITY
SubActivity
NAVAJO
REGION
TOTAL
Navajo Nation
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 3,866 3,866
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 13,581 13,581
TOTAL, TPA BASE FUNDING 17,447 17,447
Appendix-2-11
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
ACTIVITY
SubActivity
NORTHWEST
REGION
TOTAL
Confederated
Tribes of the
Colville
Reservation
Northwestern
Band of
Shoshoni
Nation
Coeur D'
Alene Tribe of
the Coeur D'
Alene
Reservation
Nez Perce
Tribal
Executive
Committee
Confederated
Tribes of The
Chehalis
Reservation
Hoh Indian
Tribe Quileute Tribe
Burns-Paiute
Tribe of the
Burns Paiute
Indian Colony
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 466 91 19 7 14 16 9
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 1,389 332 61 9 365 23 13 42 37
TOTAL, TPA BASE FUNDING 1,855 423 61 28 373 38 13 59 46
ACTIVITY
SubActivity
Confederated
Tribes of The
Warm Springs
Reservation,
Tribal Council
Nooksack
Indian Tribal
Council
Puyallup Tribal
Council
Upper Skagit
Indian Tribe
of Washington
Yakama
Nation Spokane Tribe
Kalispel
Indian
Community
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 89 19 5 191 1 5
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 13 26 44 21 402 0.5
TOTAL, TPA BASE FUNDING 102 45 44 26 593 1 5
Appendix-2-12
TPA - BASE FUNDING
FY 2023 ENACTED
Dollars in Thousands ($000)
ACTIVITY
SubActivity
EASTERN
REGION
TOTAL
Passamaquoddy
Tribe - Indian
Township
Reservation
Miccosukee
Tribe of
Indians
Narragansett
Indian Tribe
Mi'kmaq
Nation
Mashpee
Wampanoag
Tribe
REGIONAL
DIRECTOR -
EASTERN
REGION
Coushatta
Tribe of
Louisiana
Shinnecock
Indian Nation
of Southampton
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 489 4 46 23 0.2
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 946 0.5
0.1 23 2 0.1 78 0.3
TOTAL, TPA BASE FUNDING 1,435 4 0.1 68 23 2 0.1 78 0.3
ACTIVITY
SubActivity
Seneca Nation of
New York
Onondaga Nation
of New York
St. Regis
Mohawk
Tribe
NEW YORK
AGENCY
Seminole
Tribe of
Florida
Mississippi
Band of
Choctaw
Indians
ELEMENTARY & SECONDARY PROGRAMS
Johnson-O'Malley Assistance Grants (TPA) 170 1 121 91 33
POST SECONDARY PROGRAMS
Scholarships & Adult Education (TPA) 137 0.2
104 65 150 386
TOTAL, TPA BASE FUNDING 307 1 225 65 241 418
Appendix-2-13
OIEP Funding Distributions
Appendix 3-1
DEPARTMENT OF THE INTERIOR
BUREAU OF INDIAN EDUCATION
Appendix 1.-Operation of Indian Education Programs Funding Distributions
Funding Distribution
1
Page
1. ISEP
2
Funding (School Year 2022-2023) ......................................................................... Appendix 3-2
2.
ISEP Contingency Funds (School Year 2022-2023) .................................................. Appendix 3-8
3.
Student Transportation (School Year 2022-2023) ........................................................ ...Appendix 3-16
4.
FACE
3
Programs (School Year 2022-2023) ................................................................... Appendix 3-24
5.
Safe and Secure Schools (School Year 2022-2023) ........................................................ Appendix 3-27
1
School Year shown is latest available data.
2
ISEP Indian School Equalization Program.
3
FACE Family and Child Education
Appendix 3-2
Distributio
n of ISEP Funds for School Year 2022-2023
The distribution of Indian School Equalization Program (ISEP) Funds for School Year 2022-2023,
reflects distribution of the ISEP funding to each school for the most recent school year. Allocation to
individual schools is determined by formula and funds are available to the schools in July for the
forthcoming school year. As allowed by law, a portion of the total funding is withheld from the initial
distribution as a reserve to cover any ISEP appeals or school emergencies. All funds remaining after
resolution of appeals and emergency distributions are subsequently distributed to the schools using the
distribution formula. A detailed report of the distribution of the reserved (contingency) funds is contained
in Appendix 1-8.
Appendix 3-3
Distribution of ISEP Funds for School Year 2022 -2023*
School Name State
Three
Year
Average
ADM
Three
Year
Average
WSU
ISEP Funding
1 Black Mesa Community School AZ 65.62 86.62 544,250
2 Blackwater Community School AZ 386.21 445.22 2,797,290
3 Casa Blanca Day School AZ 364.02 418.37 2,628,620
4 Chilchinbeto Community School Inc. AZ 164.63 187.72 1,179,440
5 Cottonwood Day School AZ 240.08 267.71 1,682,040
6 Cove Day School AZ 39.57 58.34 366,570
7 Dennehotso Boarding School AZ 208.15 278.54 1,750,090
8 Dilcon Community School AZ 200.49 315.38 1,981,550
9 Dishchii'bikoh Community School AZ 681.54 785.69 4,936,510
10 First Mesa Elementary School AZ 169.21 192.8 1,211,360
11 Gila Crossing Day School AZ 529.71 596.62 3,748,580
12 Greasewood Springs Community School AZ 208.53 331.91 2,085,410
13 Greyhills High School AZ 345.7 478.7 3,007,650
14 Havasupai Elementary School AZ 85.56 110.43 693,850
15 Hopi Day School AZ 176.34 216.42 1,359,790
16 Hopi High School AZ 670.83 732.63 4,603,130
17 Hotevilla Bacavi Community School AZ 181.07 209.54 1,316,560
18 Hunters Point Boarding School AZ 193.46 286.52 1,800,230
19 Jeehdeez'a Elementary School AZ 158.57 237.03 1,489,240
20 John F. Kennedy Day School AZ 262.83 290.46 1,824,980
21 Kaibeto Boarding School AZ 297.54 378.33 2,377,030
22 Kayenta Boarding School AZ 402.89 584.06 3,669,670
23
Keams Canyon Elementary School (formerly
Keams Canyon Boarding School)
AZ 155.23 172.76 1,085,450
24 Kin Dah Lichi'i Olta (Kinlichee) AZ 161.74 180.76 1,135,710
25 Kinlani Bordertown (Flagstaff) Dormitory AZ 137.71 200.53 1,259,950
26 Leupp Boarding School AZ 150.36 239.63 1,505,590
27 Little Singer Community School AZ 103.41 122.31 768,450
28 Lukachukai Boarding School AZ 401.45 557.92 3,505,390
29 Many Farms Community School, Inc. AZ 367.77 552.59 3,471,920
30 Many Farms High School AZ 538.9 737.38 4,632,980
31 Moencopi Day School AZ 132.98 156.93 985,970
32
Naa tsis' aan (Navajo Mountain) Boarding
School
AZ 103 173.36 1,089,220
33 Nazlini Boarding School AZ 125.29 191.97 1,206,100
34 Pine Springs Day School AZ 77.64 99.83 627,230
35 Pinon Community School AZ 43.9 192.11 1,207,030
36 Red Rock Day School AZ 172.99 197.68 1,242,040
37 Rock Point Community School AZ 531.75 588.47 3,697,380
38 Rocky Ridge Boarding School AZ 117.49 170.24 1,069,600
Appendix 3-4
39
Rough Rock Community School
AZ
188.24
292.56
1,838,170
40
Salt River Day School
AZ
411.74
460.04
2,890,410
41
San Simon School
AZ
375.62
466.44
2,930,620
42
Santa Rosa Day School
AZ
159.01
189.69
1,191,820
43
Santa Rosa Ranch School
AZ
90.41
122.3
768,450
44
Seba Dalkai Boarding School
AZ
91.48
151.77
953,570
45
Second Mesa Day School
AZ
289.64
333.02
2,092,340
46
Shonto Preparatory School
AZ
438.43
623.89
3,919,920
47
Theodore Roosevelt School
AZ
158.41
247.69
1,556,260
48
T'iis Nazbas (Teecnospos) Community School
AZ
161.17
271.14
1,703,590
49
Tiisyaatin Residential Hall
AZ
120
198.93
1,249,900
50
Tohono O'Odham High School
AZ
153.65
156.23
981,590
51
Tonalea (Red Lake) Day School
AZ
218.71
244.74
1,537,700
52
Tuba City Boarding School
AZ
1,611.11
1998.15
12,554,370
53
Wide Ruins Community School
AZ
119.3
203.58
1,279,070
54
Winslow Residential Hall
AZ
110.33
170.83
1,073,350
55
Noli School
CA
154.68
169.38
1,064,170
56
Sherman Indian High School
CA
528
1,221.82
7,676,690
57
Ahfachkee Day School
FL
200.12
224.93
1,413,260
58
Miccosukee Indian School
FL
187.749
208.15
1,307,810
59
Meskwaki (Sac & Fox) Settlement School
IA
353.81
423.95
2,663,680
60
Coeur d'Alene Tribal School
ID
134.97
156.44
982,910
61
Sho-Ban School District No. 512
ID
146.94
164.51
1,033,620
62
Kickapoo Nation School
KS
49.69
73.37
460,960
63
Chitimacha Day School
LA
133.49
147.48
926,640
64
Sipayek Elementary School (formerly Beatrice
Rafferty School)
ME 140.89 156.36 982,430
65
Indian Island School
ME
91.75
111.76
702,170
66
Indian Township School
ME
114.21
130.05
817,120
67
Hannahville Indian School
MI
192.96
231.72
1,455,900
68
Joseph K. Lumsden Bahweting Anishnabe
School
MI 447.61 521.61 3,277,250
69
Bug-O-Nay-Ge Shig School
MN
151.4
190.32
1,195,760
70
Circle of Life Academy
MN
242.82
280.15
1,760,160
71
Fond Du Lac Ojibwe School
MN
158.89
205.35
1,290,210
72
Nay Ah Shing School
MN
178.08
212.19
1,333,190
73
Bogue Chitto Elementary School
MS
309.09
352.59
2,215,320
74
Choctaw Central High School
MS
739.76
1,062.55
6,675,980
75
Choctaw Central Middle School
MS
265.68
304.31
1,911,980
76
Conehatta Elementary School
MS
263.09
308.44
1,937,930
77
Pearl River Elementary School
MS
715.25
830.82
5,220,020
78
Red Water Elementary School
MS
215.63
251.97
1,583,130
79
Standing Pine Elementary School
MS
164.49
195.7
1,229,560
80
Tucker Elementary School
MS
170
197.24
1,239,280
81
Blackfeet Dormitory
MT
99
124.51
782,300
Appendix 3-5
82
Northern Cheyenne (Busby) Tribal Schools at
Busby Montana
MT 264.6 299.41 1,881,210
83
Two Eagle River School
MT
128.32
152.96
961,070
84
Cherokee Central Schools
NC
1,473.97
1,640.25
10,305,660
85
Circle of Nations School (Wahpeton)
ND
106.56
279.51
1,756,160
86
Dunseith Day School
ND
312.33
373.13
2,344,420
87
Mandaree Day School
ND
258.72
300.98
1,891,040
88
Ojibwa Indian School
ND
328.1
366
2,299,580
89
Standing Rock Community Grant School
ND
779.74
940.65
5,910,100
90
Tate Topa Tribal School (Four Winds)
ND
609.45
705.63
4,433,490
91
Theodore Jamerson Elementary School
ND
170.38
193.26
1,214,270
92
Turtle Mountain Elementary & Middle School
ND
1,246.64
1,446.52
9,088,480
93
Turtle Mountain High School
ND
722.85
797.26
5,009,200
94
Twin Buttes Day School
ND
43.11
56.78
356,730
95
White Shield School
ND
184.99
234.29
1,472,020
96
Alamo Navajo Community School
NM
416.29
467.03
2,934,370
97
Atsa' Biya azh Community (Shiprock Elem.)
School
NM 337.98 360.99 2,268,100
98
Baca/Dlo'Ay Azhi Community School
NM
372.46
441.17
2,771,850
99
Beclabito Day School
NM
59.01
79.77
501,190
100
Bread Springs Day School
NM
142.42
159.02
999,100
101
Chi-Chi'il-Tah / Jones Ranch
NM
134.3
180.09
1,131,480
102
Ch'ooshgai Community School
NM
381.78
593.2
3,727,070
103
Crystal Boarding School
NM
144.12
203.91
1,281,190
104
Dibe Yazhi Habitiin Olta, Inc
NM
148.83
170.36
1,070,390
105
Dzilth-Na-O-Dith-Hle Community School
NM
207.27
349.03
2,192,950
106
Haak'u Community Academy
NM
221.53
228.29
1,434,370
107
Hanaa'dli Community School/Dormitory
(Huerfano) Inc.
NM 9.87 125.18 786,510
108
Isleta Elementary School
NM
137.24
151.21
950,070
109
Jemez Day School
NM
189.56
210.73
1,324,040
110
Jicarilla Dormitory
NM
8
23.75
149,220
111
Kha'p'o Community School
NM
132.4
147.48
926,600
112
Kinteel Residential, Inc. (Aztec)
NM
87.67
131.69
827,430
113
Laguna Elementary School
NM
298.14
340.7
2,140,640
114
Laguna Middle School
NM
142.98
166.95
1,048,950
115
Lake Valley Navajo School
NM
46.83
97.62
613,350
116
Mariano Lake Community School
NM
170.02
241.94
1,520,090
117
Mescalero Apache School
NM
756.98
843.15
5,297,530
118
Na'Neelzhiin Ji'Olta (Torreon)
NM
228.33
270.6
1,700,180
119
Navajo Preparatory School
NM
368.36
692.33
4,349,930
120
Nenahnezad Boarding School
NM
232.16
367.43
2,308,580
121
Ohkay O'Wingeh Community School
NM
95.78
120.19
755,170
122
Ojo Encino Day School
NM
200.51
223.08
1,401,590
123
Pine Hill Schools
NM
398.33
457.22
2,872,710
124
Pueblo Pintado Community School
NM
235.67
375.63
2,360,120
Appendix 3-6
125
San Felipe Pueblo Elementary School
NM
403.27
449.15
2,821,990
126
San Ildefonso Day School
NM
26.45
41.32
259,630
127
Sanostee Day School
NM
54.32
76.01
477,590
128
Santa Fe Indian School
NM
1,003.78
1,813.64
11,395,070
129
Shiprock Alternative (Reservation) Dormitory
NM
68
113.64
714,000
130
Shiprock Northwest (Alternative) High School
NM
257.58
285.49
1,793,710
131
Taos Day School
NM
115.39
136.64
858,490
132
Te Tsu Geh Oweenge Day School (Tesuque)
NM
53.11
70.59
443,540
133
T'iists'oozi' bi'o'lta (Crownpoint)
NM
439.24
567.02
3,562,610
134
To'haali' (Toadlena) Community School
NM
125.26
203.78
1,280,370
135
To'Hajiilee-He (Canoncito)
NM
396.1
452.97
2,845,990
136
Tse'ii'ahi' (Standing Rock) Community School
NM
131.75
147.47
926,530
137
T'Siya Day School (Zia)
NM
61.13
79.93
502,220
138
Wingate Elementary School
NM
529.29
889.65
5,589,650
139
Wingate High School
NM
625.38
1,161.69
7,298,910
140
Duckwater Shoshone Elementary School
NV
13.14
27.02
169,790
141
Pyramid Lake High School
NV
141.01
176.12
1,106,560
142
Chickasaw Children's Village (Carter)
OK
70.67
125.95
791,320
143
Eufaula Dormitory
OK
75.33
129.15
811,470
144
Jones Academy
OK
63.65
343.86
2,160,470
145
Riverside Indian School
OK
684.04
1,430.91
8,990,400
146
Sequoyah High School
OK
531.02
707.98
4,448,240
147
Chemawa Indian School
OR
478.38
1,047.55
6,581,730
148
American Horse School
SD
331.62
428.42
2,691,760
149
Cheyenne-Eagle Butte School
SD
1,097.67
1,269.82
7,978,300
150
Crazy Horse School
SD
346.8
419.84
2,637,870
151
Crow Creek Reservation High School
SD
340.4
531.94
3,342,160
152
Crow Creek Sioux Tribal Elementary School
SD
214.34
259.36
1,629,580
153
Enemy Swim Day School
SD
187.53
218.47
1,372,650
154
Flandreau Indian School
SD
318.11
692.81
4,352,920
155
Little Eagle Grant School (Tatanka Iyotaka
Wakanyeja Oti)
SD 96.08 114.28 718,020
156
Little Wound Day School
SD
1,050.29
1,199.33
7,535,390
157
Loneman Day School
SD
282.86
378.94
2,380,860
158
Lower Brule Day School
SD
388.83
455.04
2,858,990
159
Marty Indian School
SD
315.24
517.54
3,251,700
160
Pierre Indian Learning Center
SD
203.81
520.06
3,267,560
161
Pine Ridge School
SD
1,095.19
1,338.16
8,407680
162
Porcupine Day School
SD
182.24
222.35
1,396,980
163
Rock Creek Day School
SD
54.24
72.4
454,910
164
Sicangu Owayawa Oti (Rosebud Dormitory)
SD
140.67
222.53
1,398,180
165
St. Francis Indian School
SD
828.95
1,010.38
6,348,230
166
Takini School
SD
213.09
259.04
1,627,530
167
Tiospa Zina Tribal School
SD
704.44
802.34
5,041,080
168
Tiospaye Topa School
SD
205.13
243.29
1,528,590
169
Wounded Knee School District
SD
190.45
240.8
1,512,950
Appendix 3-7
170
Aneth Community School
UT
153.47
224.02
1,407,540
171
Richfield Dormitory
UT
100.67
166.03
1,043,190
172
Sevier Richfield**
UT
131.15
137.65
864,880
173
Chief Leschi School System (Puyallup)
WA
760.64
836.05
5,252,900
174
Lummi High School
WA
154.11
171.47
1,077,320
175
Lummi Tribal School System
WA
279.31
312.92
1,966,100
176
Muckleshoot Tribal School
WA
607.74
673.07
4,228,920
177
Paschal Sherman Indian School
WA
130.61
237.64
1,493,090
178
Quileute Tribal School
WA
96.69
122.09
767,070
179
Wa He Lut Indian School
WA
143.54
171.93
1,080,210
180
Yakama Tribal School
WA
179.54
191.43
1,202,770
181
Lac Courte Oreilles Ojibwa School
WI
352.82
430.21
2,703,030
182
Menominee Tribal School
WI
252.44
286.34
1,799,090
183
Oneida Nation Schools
WI
549.83
603.26
3,790,280
184
St. Stephens Indian School
WY
328.53
376.11
2,363,100
TOTAL
436,376,270
Notes:
* Due to funds held in reserve pending resolution of appeals, and for emergencies, the total funding
reflected above will not balance to the total funds available. Any funds remaining resolution of appeals
will be issued to schools per the ISEP distribution formula.
** The BIE is required to pay tuition to Sevier Public Schools for out of State students residing at
Richfield Dormitory. It is not considered part of the BIE school system.
Appendix 3-8
Distributi
on of FY 2022-2023 ISEP Contingency Funds
The distribu
tion of FY 2022-2023 Indian School Equalization Program (ISEP) Contingency Funds
reflects final distribution of the prior school years’ ISEP, funds held in reserve to cover any ISEP count
appeals or school emergencies. Additionally, the appendix identifies the amount, recipient, and reason for
every emergency distribution. The remaining balance of the reserved funds were distributed to the schools
as determined by the ISEP formula.
Appendix 3-9
Distribution of ISEP Funds for School Year 2022-2023
School Name State
Three
Year
Average
ADM
Three
Year
Average
WSU
ISEP
Funding
Purpose
1 Black Mesa Community School AZ 48.35 82.86
5,500
Distribution per the ISEP formula.
2 Blackwater Community School AZ 386.21 445.22
28,250
Distribution per the ISEP formula.
3 Casa Blanca Day School AZ 364.02 418.37
26,550
Distribution per the ISEP formula.
4 Chilchinbeto Community School Inc. AZ 164.63 187.72
11,910
Distribution per the ISEP formula.
5 Cottonwood Day School AZ 205.53 293.29
16,990
Distribution per the ISEP formula.
6 Cove Day School AZ 26.09 51.29
3,700
Distribution per the ISEP formula.
7 Dennehotso Boarding School AZ 208.15 278.54
17,680
Distribution per the ISEP formula.
8 Dilcon Community School AZ 153.21 311.49
20,010
Distribution per the ISEP formula.
9 Dishchii'bikoh Community School AZ 681.54 785.69
49,860
Distribution per the ISEP formula.
10 First Mesa Elementary School AZ 169.21 192.8
12,240
Distribution per the ISEP formula.
11 Gila Crossing Day School AZ 529.71 596.62
37,860
Distribution per the ISEP formula.
12 Greasewood Springs Community School AZ 177.93 366.58
21,060
Distribution per the ISEP formula.
13 Greyhills High School AZ 222.47 470.76
30,380
Distribution per the ISEP formula.
14 Havasupai Elementary School AZ 85.56 110.43
7,010
Distribution per the ISEP formula.
15 Hopi Day School AZ 176.34 216.42
13,730
Distribution per the ISEP formula.
16 Hopi High School AZ 670.83 732.63
46,490
Distribution per the ISEP formula.
17 Hotevilla Bacavi Community School AZ 181.07 209.54
13,300
Distribution per the ISEP formula.
18 Hunters Point Boarding School AZ 161.43 289.47
18,180
Distribution per the ISEP formula.
19 Jeehdeez'a Elementary School AZ 158.57 237.03
15,040
Distribution per the ISEP formula.
20 John F. Kennedy Day School AZ 262.83 290.46
18,430
Distribution per the ISEP formula.
21 Kaibeto Boarding School AZ 232.93 382.09
24,010
Distribution per the ISEP formula.
22 Kayenta Boarding School AZ 332.83 600.7
37,070
Distribution per the ISEP formula.
23
Keams Canyon Elementary School (formerly
Keams Canyon Boarding School)
AZ 155.23 172.76 10,960 Distribution per the ISEP formula.
24 Kin Dah Lichi'i Olta (Kinlichee) AZ 161.74 180.76
11,470
Distribution per the ISEP formula.
Appendix 3-10
25
Kinlani Bordertown (Flagstaff) Dormitory
AZ
128.33
205.33
12,730
Distribution per the ISEP formula.
26
Leupp Boarding School
AZ
118.48
259
15,210
Distribution per the ISEP formula.
27
Little Singer Community School
AZ
82.12
121.29
7,760
Distribution per the ISEP formula.
28
Lukachukai Boarding School
AZ
349.01
595.49
35,410
Distribution per the ISEP formula.
29
Many Farms Community School, Inc.
AZ
282.42
539.23
35,070
Distribution per the ISEP formula.
30
Many Farms High School
AZ
373.49
769.88
46,800
Distribution per the ISEP formula.
31
Moencopi Day School
AZ
128.14
188.6
9,960
Distribution per the ISEP formula.
32
Naa tsis' aan (Navajo Mountain) Boarding
School
AZ 84.79 177.33 11,000 Distribution per the ISEP formula.
33
Nazlini Boarding School
AZ
102.58
188.52
12,180
Distribution per the ISEP formula.
34
Pine Springs Day School
AZ
77.64
99.83
6,340
Distribution per the ISEP formula.
35
Pinon Dormitory
AZ
104.17
186.44
12,190
Distribution per the ISEP formula.
36
Red Rock Day School
AZ
172.99
197.68
12,550
Distribution per the ISEP formula.
37
Rock Point Community School
AZ
531.75
588.47
37,350
Distribution per the ISEP formula.
38
Rocky Ridge Boarding School
AZ
101.94
182.9
10,800
Distribution per the ISEP formula.
39
Rough Rock Community School
AZ
169.11
345.58
18,570
Distribution per the ISEP formula.
40
Salt River Day School
AZ
411.74
460.04
29,190
Distribution per the ISEP formula.
41
San Simon School
AZ
375.62
466.44
29,600
Distribution per the ISEP formula.
42
Santa Rosa Day School
AZ
159.01
189.69
12,040
Distribution per the ISEP formula.
43
Santa Rosa Ranch School
AZ
90.41
122.3
7,760
Distribution per the ISEP formula.
44
Seba Dalkai Boarding School
AZ
81.27
161.44
9,630
Distribution per the ISEP formula.
45
Second Mesa Day School
AZ
289.64
333.02
21,130
Distribution per the ISEP formula.
46
Shonto Preparatory School
AZ
346.42
621.89
39,590
Distribution per the ISEP formula.
47
Tohono O'Odham High School
AZ
153.65
156.23
9,910
Distribution per the ISEP formula.
48
Tonalea (Red Lake) Day School
AZ
218.71
244.74
15,530
Distribution per the ISEP formula.
49
Theodore Roosevelt School
AZ
114.35
225.29
15,720
Distribution per the ISEP formula.
50
T'iis Nazbas (Teecnospos) Community School
AZ
138.56
291.18
17,210
Distribution per the ISEP formula.
51
Tiisyaatin Residential Hall
AZ
120
198.93
12,620
Distribution per the ISEP formula.
52
Tuba City Boarding School
AZ
1,611.11
1998.15
126,800
Distribution per the ISEP formula.
53
Wide Ruins Community School
AZ
109.49
216.82
12,920
Distribution per the ISEP formula.
Appendix 3-11
54
Winslow Residential Hall
AZ
110.33
176.53
10,840
Distribution per the ISEP formula.
55
Sherman Indian High School
CA
352.47
1,201.11
77,540
Distribution per the ISEP formula.
56
Noli School
CA
154.68
169.38
10,750
Distribution per the ISEP formula.
57
Ahfachkee Day School
FL
134.58
202.96
14,270
Distribution per the ISEP formula.
58
Miccosukee Indian School
FL
135.2
198.41
13,210
Distribution per the ISEP formula.
59
Meskwaki (Sac & Fox) Settlement School
IA
353.81
423.95
26,900
Distribution per the ISEP formula.
60
Coeur d'Alene Tribal School
ID
108.93
164.06
9,930
Distribution per the ISEP formula.
61
Sho-Ban School District No. 512
ID
146.94
164.51
10,440
Distribution per the ISEP formula.
62
Kickapoo Nation School
KS
32.61
66.85
4,660
Distribution per the ISEP formula.
63
Chitimacha Day School
LA
102.51
144.04
9,360
Distribution per the ISEP formula.
64
Beatrice Rafferty School
ME
109.2
153.4
9,920
Distribution per the ISEP formula.
65
Indian Island School
ME
91.75
111.76
7,090
Distribution per the ISEP formula.
66
Indian Township School
ME
114.21
130.05
8,250
Distribution per the ISEP formula.
67
Hannahville Indian School
MI
137.17
221.54
14,710
Distribution per the ISEP formula.
68
Joseph K. Lumsden Bahweting Anishnabe
School
MI 447.61 521.61 33,100 Distribution per the ISEP formula.
69
Bug-O-Nay-Ge Shig School
MN
111.83
189.8
12,080
Distribution per the ISEP formula.
70
Circle of Life Academy
MN
242.82
280.15
17,780
Distribution per the ISEP formula.
71
Fond Du Lac Ojibwe School
MN
158.89
205.35
13,030
Distribution per the ISEP formula.
72
Nay Ah Shing School
MN
178.08
212.19
13,470
Distribution per the ISEP formula.
73
Choctaw Central High School
MS
523.69
1,028.88
67,430
Distribution per the ISEP formula.
74
Choctaw Central Middle School
MS
181.05
284.98
19,310
Distribution per the ISEP formula.
75
Conehatta Elementary School
MS
215.49
320.69
19,570
Distribution per the ISEP formula.
76
Red Water Elementary School
MS
172.62
256.27
15,990
Distribution per the ISEP formula.
77
Tucker Elementary School
MS
136.56
204.86
12,520
Distribution per the ISEP formula.
78
Standing Pine Elementary School
MS
164.49
195.70
12,420
Distribution per the ISEP formula.
79
Bogue Chitto Elementary School
MS
309.09
352.59
22,380
Distribution per the ISEP formula.
80
Pearl River Elementary School
MS
715.25
830.82
52,720
Distribution per the ISEP formula.
81
Blackfeet Dormitory
MT
99.00
165.91
7,900
Distribution per the ISEP formula.
Appendix 3-12
82
Northern Cheyenne (Busby) Tribal Schools at
Busby Montana
MT 264.60 299.41 19,000 Distribution per the ISEP formula.
83
Two Eagle River School
MT
128.32
152.96
9,710
Distribution per the ISEP formula.
84
Cherokee Central Schools
NC
1.037.37
1,541.70
104,090
Distribution per the ISEP formula.
85
Circle of Nations School (Wahpeton)
ND
74.31
259.1
17,740
Distribution per the ISEP formula.
86
Dunseith Day School
ND
312.33
373.13
23,680
Distribution per the ISEP formula.
87
Mandaree Day School
ND
258.72
300.98
19,100
Distribution per the ISEP formula.
88
Ojibwa Indian School
ND
260.21
375.07
23,230
Distribution per the ISEP formula.
89
Standing Rock Community Grant School
ND
779.74
940.65
59,690
Distribution per the ISEP formula.
90
Tate Topa Tribal School (Four Winds)
ND
609.45
705.63
44,780
Distribution per the ISEP formula.
91
Theodore Jamerson Elementary School
ND
170.38
193.26
12,270
Distribution per the ISEP formula.
92
Twin Buttes Day School
ND
35.13
60.49
3,600
Distribution per the ISEP formula.
93
Turtle Mountain Elementary & Middle School
ND
1,246.64
1,446.52
91,790
Distribution per the ISEP formula.
94
Turtle Mountain High School
ND
722.85
797.26
50,600
Distribution per the ISEP formula.
95
White Shield School
ND
184.99
234.29
14,870
Distribution per the ISEP formula.
96
Alamo Navajo Community School
NM
416.29
467.03
29,640
Distribution per the ISEP formula.
97
Atsa' Biya azh Community (Shiprock Elem.)
School
NM 337.98 360.99 22,910 Distribution per the ISEP formula.
98
Baca/Dlo'Ay Azhi Community School
NM
372.46
441.17
28,000
Distribution per the ISEP formula.
99
Beclabito Day School
NM
59.01
79.77
5,060
Distribution per the ISEP formula.
100
Bread Springs Day School
NM
142.42
159.02
10,090
Distribution per the ISEP formula.
101
Chi-Chi'il-Tah / Jones Ranch
NM
111.05
192.26
11,430
Distribution per the ISEP formula.
102
Ch'ooshgai Community School
NM
318.62
617.66
37,650
Distribution per the ISEP formula.
103
Crystal Boarding School
NM
123.26
214.92
12,940
Distribution per the ISEP formula.
104
Dibe Yazhi Habitiin Olta, Inc
NM
132.16
195.1
10,810
Distribution per the ISEP formula.
105
Dzilth-Na-O-Dith-Hle Community School
NM
177.07
349.41
22,150
Distribution per the ISEP formula.
106
Haak'u Community Academy
NM
182.05
240.07
14,490
Distribution per the ISEP formula.
107
Hanaa'dli Community School/Dormitory
(Huerfano) Inc.
NM 65.93 128.51 7,940 Distribution per the ISEP formula.
108
Isleta Elementary School
NM
137.24
151.21
9,600
Distribution per the ISEP formula.
109
Jemez Day School
NM
189.56
210.73
13,370
Distribution per the ISEP formula.
Appendix 3-13
110
Jicarilla Dormitory
NM
8
23.75
1,620
Distribution per the ISEP formula.
111
Kha'p'o Community School
NM
105.84
142.33
9,360
Distribution per the ISEP formula.
112
Kinteel Residential, Inc. (Aztec)
NM
87.67
145.49
8,360
Distribution per the ISEP formula.
113
Laguna Elementary School
NM
208.23
301.08
21,620
Distribution per the ISEP formula.
114
Laguna Middle School
NM
142.98
166.95
10,600
Distribution per the ISEP formula.
115
Lake Valley Navajo School
NM
38.99
102.13
6,200
Distribution per the ISEP formula.
116
Mariano Lake Community School
NM
143.65
260.07
15,350
Distribution per the ISEP formula.
117
Mescalero Apache School
NM
544.91
806.9
53,510
Distribution per the ISEP formula.
118
Na'Neelzhiin Ji'Olta (Torreon)
NM
228.33
270.6
17,170
Distribution per the ISEP formula.
119
Navajo Preparatory School
NM
232.4
667.01
43,940
Distribution per the ISEP formula.
120
Nenahnezad Boarding School
NM
182.31
361.52
23,320
Distribution per the ISEP formula.
121
Ohkay O'Wingeh Community School
NM
80.94
123.71
7,630
Distribution per the ISEP formula.
122
Ojo Encino Day School
NM
200.51
223.08
14,160
Distribution per the ISEP formula.
123
Pine Hill Schools
NM
282.48
450.8
29,020
Distribution per the ISEP formula.
124
Pueblo Pintado Community School
NM
196.46
409.5
23,840
Distribution per the ISEP formula.
125
San Felipe Pueblo Elementary School
NM
403.27
449.15
28,500
Distribution per the ISEP formula.
126
San Ildefonso Day School
NM
23.17
44.34
2,620
Distribution per the ISEP formula.
127
Sanostee Day School
NM
48.15
86.46
4,820
Distribution per the ISEP formula.
128
Santa Fe Indian School
NM
685
1,807.40
115,100
Distribution per the ISEP formula.
129
Shiprock Alternative (Reservation) Dormitory
NM
68
119.16
7,210
Distribution per the ISEP formula.
130
Shiprock Northwest (Alternative) High School
NM
257.58
285.49
18,120
Distribution per the ISEP formula.
131
Taos Day School
NM
115.39
136.64
8,670
Distribution per the ISEP formula.
132
Te Tsu Geh Oweenge Day School (Tesuque)
NM
53.11
70.59
4,480
Distribution per the ISEP formula.
133
T'iists'oozi' bi'o'lta (Crownpoint)
NM
358.81
572.23
35,980
Distribution per the ISEP formula.
134
To'haali' (Toadlena) Community School
NM
108.71
223.67
12,930
Distribution per the ISEP formula.
135
To'Hajiilee-He (Canoncito)
NM
313.27
479.11
28,750
Distribution per the ISEP formula.
136
Tse'ii'ahi' (Standing Rock) Community School
NM
131.75
147.47
9,360
Distribution per the ISEP formula.
137
T'Siya Day School (Zia)
NM
61.13
79.93
5,070
Distribution per the ISEP formula.
138
Wingate Elementary School
NM
418.28
909.09
56,460
Distribution per the ISEP formula.
139
Wingate High School
NM
433.58
1,216.98
73,720
Distribution per the ISEP formula.
Appendix 3-14
140
Pyramid Lake High School
NV
83.21
156.34
11,180
Distribution per the ISEP formula.
141
Duckwater Shoshone Elementary School
NV
13.14
27.02
1,720
Distribution per the ISEP formula.
142
Chickasaw Children's Village (Carter)
OK
70.67
125.95
7,990
Distribution per the ISEP formula.
143
Eufaula Dormitory
OK
75.33
129.15
8,200
Distribution per the ISEP formula.
144
Jones Academy
OK
155.9
358.99
21,820
Distribution per the ISEP formula.
145
Riverside Indian School
OK
475.29
1,456.21
90,810
Distribution per the ISEP formula.
146
Sequoyah High School
OK
359.93
726.86
44,930
Distribution per the ISEP formula.
147
Chemawa Indian School
OR
322.12
1,070.08
66,480
Distribution per the ISEP formula.
148
American Horse School
SD
331.62
428.42
27,190
Distribution per the ISEP formula.
149
Cheyenne-Eagle Butte School
SD
801.24
1,312.72
80,580
Distribution per the ISEP formula.
150
Crazy Horse School
SD
260.31
414.24
26,640
Distribution per the ISEP formula.
151
Crow Creek Reservation High School
SD
230.95
530.31
33,760
Distribution per the ISEP formula.
152
Crow Creek Sioux Tribal Elementary School
SD
214.34
259.36
16,460
Distribution per the ISEP formula.
153
Enemy Swim Day School
SD
187.53
218.47
13,860
Distribution per the ISEP formula.
154
Flandreau Indian School
SD
318.11
692.81
43,970
Distribution per the ISEP formula.
155
Little Eagle Grant School (Tatanka Iyotaka
Wakanyeja Oti)
SD 96.08 114.28
7,250
Distribution per the ISEP formula.
156
Little Wound Day School
SD
1,050.29
1,199.33
76,110
Distribution per the ISEP formula.
157
Lower Brule Day School
SD
388.83
455.04
28,880
Distribution per the ISEP formula.
158
Loneman Day School
SD
282.86
378.94
24,050
Distribution per the ISEP formula.
159
Marty Indian School
SD
216.74
483.88
32,840
Distribution per the ISEP formula.
160
Pierre Indian Learning Center
SD
162.31
523.11
33,000
Distribution per the ISEP formula.
161
Pine Ridge School
SD
770.6
1,340.18
84,920
Distribution per the ISEP formula.
162
Porcupine Day School
SD
182.24
222.35
14,110
Distribution per the ISEP formula.
163
Rock Creek Day School
SD
47.09
79.54
4,600
Distribution per the ISEP formula.
164
Sicangu Owayawa Oti (Rosebud Dormitory)
SD
140.67
228.12
14,120
Distribution per the ISEP formula.
165
St. Francis Indian School
SD
828.95
1,010.38
64,120
Distribution per the ISEP formula.
166
Takini School
SD
213.09
259.04
16,440
Distribution per the ISEP formula.
167
Tiospa Zina Tribal School
SD
704.44
802.34
50,920
Distribution per the ISEP formula.
168
Tiospaye Topa School
SD
205.13
243.29
15,440
Distribution per the ISEP formula.
Appendix 3-15
* The BIE is required to pay tuition to Sevier Public Schools for out of State students who reside at Richfield Dormitory. It is not considered part of
the BIE school system.
** Due to funds held in reserve pending resolution of appeals, and for emergencies, the total funding reflected above will not balance to the total
funds available. Any funds remaining after resolution of appeals will be issued to schools per the ISEP distribution formula.
169
Wounded Knee School district
SD
190.45
240.8
15,280
Distribution per the ISEP formula.
170
Aneth Community School
UT
133.76
246.89
14,220
Distribution per the ISEP formula.
171
Richfield Dormitory
UT
100.67
162.03
10,540
Distribution per the ISEP formula.
172
Sevier Richfield*
UT
131.15
137.65
8,740
Distribution per the ISEP formula.
173
Chief Leschi School System (Puyallup)
WA
592.88
877.01,
53,060
Distribution per the ISEP formula.
174
Lummi High School
WA
94.04
159.15
10,880
Distribution per the ISEP formula.
175
Lummi Tribal School System
WA
279.31
312.92
19,860
Distribution per the ISEP formula.
176
Muckleshoot Tribal School
WA
436.49
651.68
42,710
Distribution per the ISEP formula.
177
Paschal Sherman Indian School
WA
109.37
263.86
15,080
Distribution per the ISEP formula.
178
Quileute Tribal School
WA
62.97
109.46
7,750
Distribution per the ISEP formula.
179
Wa He Lut Indian School
WA
143.54
171.93
10,910
Distribution per the ISEP formula.
180
Yakama Tribal School
WA
179.54
191.43
12,150
Distribution per the ISEP formula.
181
Lac Courte Oreilles Ojibwa School
WI
261.92
424.27
27,300
Distribution per the ISEP formula.
182
Menominee Tribal School
WI
252.44
286.34
18,170
Distribution per the ISEP formula.
183
Oneida Nation Schools
WI
549.83
603.26
38,280
Distribution per the ISEP formula.
184
St. Stephens Indian School
WY
328.53
376.11
23,870
Distribution per the ISEP formula.
TOTAL
4,407,730
Appendix 3-16
Distribut
ion of FY 2022 -2023 Transportation Funds
The distribution of Student Transportation Funds for School Year 2022-2023 reflects distribution of transportation funding to each school for the
most recent school year. Allocations to individual schools is based on the number of miles traveled by school vehicles transporting students
to/from school and the estimated commercial costs of transporting boarding students. Commercial cost estimates are based on the most recent
actual costs.
Appendix 3-17
Distribution of Student Transportation of School Year 2022-2023
School Name State
Per Day
Miles
Boarding
Miles Per
Trip
Charter/
Commercial
Costs
Annual Air
Costs
Total
Transportation
Funds
1 Black Mesa Community School AZ 675.80 - - 0 466,483
2 Blackwater Community School AZ 312.40 - - 0 215,637
3 Casa Blanca Day School AZ 319.87 - - 0 220,796
4 Chilchinbeto Day School AZ 180.33 - - 0 124,476
5 Cottonwood Day School AZ 614.00 - - 0 423,825
6 Cove Day School AZ 180.40 - - 0 124,524
7 Dennehotso Boarding School AZ 319.53 87.00 - 0 221,896
8 Dilcon Community School AZ 458.40 180.80 - 0 319,192
9 Dishchii`bikoh Community School AZ 484.67 - - 0 334,552
10 First Mesa Elementary School (Polacca) AZ 265.80 - - 0 183,473
11 Gila Crossing Day School AZ 187.80 - - 0 129,632
12 Greasewood Springs Community School, Inc AZ 422.00 132.00 - 0 293,318
13 Greyhills High School AZ 554.00 267.00 - 0 386,504
14 Hopi Day School AZ 144.33 - - 0 99,626
15 Hopi Jr/High School AZ 2,665.44 - - 0 1,839,869
16 Hotevilla Bacavi Community School AZ 187.60 - - 0 129,494
17 Hunters Point Boarding School AZ 285.80 139.20 - 0 199,414
18 Jeehdeez`a Elementary School AZ 312.80 - - 0 215,916
19 John F. Kennedy Day School AZ 588.00 - - 0 405,878
20 Kaibeto Boarding School AZ 354.40 189.20 - 0 247,533
21 Kayenta Boarding School AZ 812.00 381.20 - 0 566,345
22 Keams Canyon Boarding School AZ 353.60 - - 0 244,079
23 Kin Dah Lichi'i Olta (Kinlichee) AZ 584.07 - - 0 403,168
24 Kinlani Dormitory AZ 14.67 - - 0 10,126
25 Leupp Boarding School AZ 429.20 - - 0 296,263
26 Little Singer Community School AZ 511.60 - - 0 353,141
Appendix 3-18
27
Lukachukai Community School
AZ
400.00
102.40
-
0
277,678
28
Many Farms Community School; Inc.
AZ
448.33
256.00
-
0
313,395
29
Many Farms High School
AZ
1,060.40
747.00
-
0
743,419
30
Moencopi Day School
AZ
99.67
-
-
0
68,796
31
Naa tsis' aan (Navajo Mountain) Boarding
School
AZ 80.00 126.00 - 0 57,154
32
Nazlini Boarding School
AZ
296.00
86.40
-
0
205,645
33
Pine Springs Day School
AZ
550.80
-
-
0
380,200
34
Pinon Community School
AZ
442.40
1,223.00
-
0
324,135
35
Red Rock Day School
AZ
300.00
-
-
0
207,081
36
Rock Point Community School
AZ
758.40
-
-
0
523,500
37
Rocky Ridge Boarding School
AZ
347.60
-
-
0
239,937
38
Rough Rock Community School
AZ
734.67
408.00
-
0
513,378
39
Salt River Day School
AZ
177.08
-
-
0
122,230
40
San Simon School
AZ
680.20
-
-
0
469,521
41
Santa Rosa Day School
AZ
286.73
-
-
0
197,921
42
Santa Rosa Ranch School
AZ
566.00
-
-
0
390,692
43
Seba Dalkai Boarding School
AZ
419.73
121.40
-
0
291,589
44
Second Mesa Day School
AZ
379.27
-
-
0
261,798
45
Shonto Preparatory School
AZ
993.27
314.00
-
0
690,437
46
Theodore Roosevelt School
AZ
201.67
956.00
-
0
153,871
47
T'iis Nazbas (Teecnospos) Community
School
AZ 330.93 167.00 - 0 230,992
48
Tiisyaakin Residential Hall (Holbrook)
AZ
0.00
435.00
-
0
6,673
49
Tohono O'odham High School
AZ
817.27
-
-
0
564,136
50
Tonalea (Red Lake) Day School
AZ
422.00
-
-
0
291,293
51
Tuba City Boarding School
AZ
1,650.60
-
-
0
1,139,357
52
Wide Ruins Community School
AZ
348.67
-
-
0
240,676
53
Winslow Residential Hall
AZ
14.00
924.80
-
0
23,850
54
Noli School
CA
1,630.33
-
-
0
1,125,365
Appendix 3-19
55
Sherman Indian High School
CA
-
7,606.00
46,497.00
790,523
1,162,946
56
Ahfachkee Day School
FL
158.97
-
-
0
109,729
57
Miccosukee Indian School
FL
188.00
-
-
0
129,770
58
Meskwaki (Sac & Fox) Settlement School
IA
129.13
-
-
0
89,134
59
Coeur d'Alene Tribal School
ID
464.00
-
-
0
320,285
60
Sho-Ban School District No. 512
ID
270.67
-
-
0
186,835
61
Kickapoo Nation School
KS
865.87
-
-
0
597,683
62
Chitimacha Day School
LA
8.67
-
-
0
5,985
63
Beatrice Rafferty School
ME
200.00
-
-
0
138,054
64
Indian Island School
ME
57.33
-
-
0
39,573
65
Indian Township School
ME
456.67
-
-
0
315,225
66
Hannahville Indian School
MI
731.33
-
-
0
504,814
67
Joseph K. Lumsden Bahweting Anishnabe
School
MI 602.00 - - 0 415,544
68
Bug-O-Nay-Ge Shig School
MN
1,673.60
-
-
0
1,155,233
69
Circle Of Life Academy
MN
774.33
-
-
0
534,495
70
Fond Du Lac Ojibway School
MN
1,093.33
-
-
0
754,691
71
Nay Ah Shing School
MN
343.67
-
-
0
237,225
72
Boque Chitto Elementary School
MS
246.00
-
-
0
169,806
73
Choctaw Central High School
MS
1,422.00
308.00
-
0
986,289
74
Conehatta Elementary School
MS
126.00
-
-
0
86,974
75
Red Water Elementary School
MS
288.00
-
-
0
198,797
76
Standing Pine Elementary School
MS
116.00
-
-
0
80,071
77
Tucker Elementary School
MS
102.00
-
-
0
70,407
78
Northern Cheyenne (Busby) Tribal Schools at
Busby Montana
MT 858.33 - - 0 592,478
79
Two Eagle River School
MT
429.47
-
-
0
296,450
80
Cherokee Central School
NC
1,151.33
-
-
0
794,727
81
Circle of Nations (Wahpeton) Indian
Boarding School
ND - 4,667.00 86,291 56,648 214,527
Appendix 3-20
82
Dunseith Day School
ND
403.07
-
-
0
278,226
83
Mandaree Day School
ND
246.67
-
-
0
170,268
84
Ojibwa Indian School
ND
452.00
-
-
0
312,001
85
Standing Rock Community School
ND
1,609.33
-
-
0
1,110,870
86
Tate Topa Tribal School (Four Winds)
ND
592.33
-
-
0
408,867
87
Theodore Jamerson Elementary School
ND
75.00
-
-
0
51,770
88
Turtle Mt. Elem. & Middle Schoo
ND
1,559.67
-
-
0
1,076,591
89
Twin Buttes Day School
ND
147.33
-
-
0
101,697
90
White Shield School
ND
354.00
-
-
0
244,355
91
Alamo Navajo School
NM
347.60
-
-
0
239,937
92
Baca/Dlo'Ay Azhi Community School
NM
370.40
-
-
0
255,675
93
Beclabito Day School
NM
336.40
-
-
0
232,206
94
Bread Springs Day School
NM
204.40
-
-
0
141,091
95
Chi-Ch'il-Tah / Jones Ranch
NM
277.60
-
-
0
191,618
96
Ch'ooshgai (Chuska) Community School
NM
606.80
257.00
-
0
422,797
97
Crystal Boarding School
NM
278.80
-
-
0
192,447
98
Dibe Yazhi Habitiin Olta, Inc
NM
277.00
-
-
0
191,204
99
Dzilth-na-o-dith-hle Community
NM
454.80
179.00
-
0
316,747
100
Haak'u Community Academy (Sky City)
NM
175.00
-
-
0
120,797
101
Hanaa'dli Community School/Dormitory
(Huerfano) Inc.
NM 151.33 - - 0 104,458
102
Isleta Elementary School
NM
101.60
-
-
0
70,131
103
Jemez Day School
NM
28.87
-
-
0
19,928
104
Kha'p'o (Santa Clara Day School)
NM
23.60
-
-
0
16,288
105
Kinteel Residential Campus, INC
NM
-
292.00
-
0
4,479
106
Laguna Middle School
NM
270.00
-
-
0
186,372
107
Lake Valley Navajo School
NM
94.00
119.00
-
0
66,711
108
Mariano Lake Community School
NM
203.80
133.00
-
0
142,882
109
Mescalero Apache School
NM
589.33
-
-
0
406,796
110
Na'Neelzhiin Ji'Olta (Torreon)
NM
334.40
-
-
0
230,826
Appendix 3-21
111 Navajo Preparatory School NM 131.33 1,295.00 - 0 110,517
112 Nenahnezad Boarding School NM 273.20 63.00 - 0 189,545
113 Ohkay O'Wingeh Community School NM 48.67 - - 0 33,595
114 Ojo Encino Day School NM 400.40 - - 0 276,383
115 Pine Hill Schools NM 395.29 - - 0 272,856
116 Pueblo Pintado Community School NM 390.00 221.00 - 0 272,647
117 San Felipe Day School NM 145.00 - - 0 100,086
118 San Ildefonso Day School NM 63.33 - - 0 43,715
119 Sanostee Day School NM 234.00 - - 0 161,523
120 Santa Fe Indian School NM 804.00 1,737.00 58,754 6,949 639,607
121 Shiprock Northwest High School
1
NM 831.27 573,799
122 Taos Day School NM 63.00 - - 0 43,487
123
T'iists'oozi' Bi'o'lta (Crownpoint Community
School)
NM 559.20 194.00 - 0 388,980
124 To'haali' (Toadlena) Community School NM 474.80 - - 0 327,739
125 To'Hajiilee-He (Canoncito) NM 506.13 - - 0 349,363
126
Tse'ii'ahi' (Standing Rock) Community
School
NM 319.60 - - 0 220,610
127
T'Siya Elementary & Middle School
(formerly Zia Day School)
NM 75.15 - - 0 51,874
128 Wingate Elementary School NM 272.00 193.00 - 0 190,713
129 Wingate High School NM 178.33 1,310.00 - 0 143,190
130 Duckwater Shoshone Elementary School NV 35.33 - - 0 24,387
131 Pyramid Lake High School NV 2,736.00 - - 0 1,888,574
132 Chickasaw Children's Village (Carter) OK - 1,308.00 - 0 20,064
133 Eufaula Dormitory OK - 1,255.00 - 0 19,251
134 Jones Academy OK - 8,313.00 - 271,858 399,374
135 Riverside Indian School OK - 3,785.00 13,022 843,090 914,171
136 Sequoyah High School OK 450.67 2,481.00 - 0 349,140
137 Chemawa Indian School OR - 4,330.00 - 843,415 909,834
Appendix 3-22
138
American Horse School
SD
728.40
-
-
0
502,791
139
Cheyenne-Eagle Butte School
SD
670.33
-
-
0
462,708
140
Crazy Horse School
SD
985.07
-
-
0
679,963
141
Crow Creek Reservation High School
SD
484.33
1,429.00
-
0
356,238
142
Enemy Swim Day School
SD
750.67
-
-
0
518,164
143
Flandreau Indian School
SD
-
6,276.00
-
308,403
404,672
144
Little Wound Day School
SD
1,906.67
-
-
0
1,316,114
145
Loneman Day School
SD
700.00
-
-
0
483,188
146
Lower Brule Day School
SD
262.00
-
-
0
180,850
147
Marty Indian School
SD
567.20
2,840.00
-
0
435,176
148
Pierre Indian Learning Center
SD
-
1,558.00
44,570
0
68,469
149
Pine Ridge School
SD
1,126.80
-
-
0
777,792
150
Porcupine Day School
SD
980.00
-
-
0
676,463
151
Rock Creek Day School
SD
215.33
-
-
0
148,635
152 Sicangu Owayawa Oti (Rosebud Dormitory) SD - 785.00 - 0 12,041
153
Sitting Bull (Little Eagle) School
SD
58.00
-
-
0
40,036
154
St. Francis Indian School
SD
1,138.40
-
-
0
785,801
155
Takini School
SD
607.68
-
-
0
419,462
156
Tiospa Zina Tribal School
SD
695.67
-
-
0
480,199
157
Tiospaye Topa School
SD
460.33
-
-
0
317,751
158
Wounded Knee School District
SD
531.60
-
-
0
366,947
159
Aneth Community School
UT
281.73
-
-
0
194,469
160
Richfield Dormitory
UT
-
1,942.00
49,050
0
78,839
161
Sevier Richfield
UT
52.00
-
-
0
35,894
162
Chief Leschi School System (Puyallup)
WA
1,086.33
-
-
0
749,859
163
Lummi Tribal School System
WA
840.00
-
-
0
579,825
164
Muckleshoot Tribal School
WA
1,451.33
-
-
0
1,001,807
165
Paschal Sherman Indian School
WA
539.60
1,232.00
-
0
391,367
166
Quileute Tribal School
WA
249.00
-
-
0
171,877
167
Wa He Lut Indian School
WA
735.33
-
-
0
507,575
Appendix 3-23
168
Yakama Tribal School
WA
340.00
-
-
0
234,691
169
Lac Courte Oreilles Ojibwa School
WI
495.33
-
-
0
341,911
170
Menominee Tribal School
WI
557.00
-
-
0
384,479
171
Oneida Tribal School
WI
468.00
-
-
0
323,046
172
St. Stephens Indian School
WY
385.67
-
-
0
266,216
TOTAL
79,712.86
63,351
298,184
3,120,886
59,616,000
1
Shiprock Alternative funding is combined and entered under Shiprock Northwest High School.
Appendix 3-24
Distributio
n of FACE funds for School Year 2022-2023
Distribution of Early Childhood Development funds to the 53 schools that participate in the Family and
Child Education (FACE) program for preschool American Indian children and their families. The
program addresses the achievement gap for Indian children primarily located on rural reservations by
teaching the skills needed to begin school successfully.
Appendix 3-25
Number of FACE Participants at Sites During SY 2022 -2023 (Estimates from 2021-2022)
Site STATE Adults Children
Total
Unduplicated
Participants
1
FUNDS
2
Alamo Navajo Community School
NM
56
50
106
$327,300
American Horse School
SD
32
44
76
$327,300
Aneth Community School
UT
30
33
63
$327,300
Atsa' Biya azh Community (Shiprock
Elem.) School
NM 32 36 68 $327,300
Baca/Dlo'Ay Azhi Community School
NM
32
43
75
$327,300
Beclabito Day School
NM
21
20
41
$327,300
Blackwater Community School
AZ
24
23
47
$327,300
Bread Springs Day School
NM
57
62
119
$327,300
Casa Blanca Day School
AZ
10
15
25
$327,300
Cherokee Central Elementary School
3
NC
TBD
TBD
TBD
$327,300
Chief Leschi School System (Puyallup)
WA
59
61
120
$327,300
Choctaw Agency School (Pearl River)
MS
44
64
108
$327,300
Ch'ooshgai Community School
3
NM
TBD
TBD
TBD
$327,300
Cove Day School
AZ
14
16
30
$327,300
Dunseith Day School
ND
43
53
96
$327,300
Dzilth-Na-O-Dith-Hle Community School
NM
44
53
97
$332,300
Enemy Swim Day School
SD
32
51
83
$327,300
Fond Du Lac Ojibwe School
MN
29
33
62
$327,300
Gila Crossing Day School
AZ
40
58
98
$327,300
Greasewood Springs Community School
AZ
19
26
45
$327,300
Haak'u Community Academy
NM
14
21
35
$327,300
Hanaa'dli Coimmunity School
NM
21
21
42
$327,300
Hannahville Indian School
MI
61
68
129
$332,300
Jeehdeez'a Elementary School
3
AZ
TBD
TBD
TBD
$327,300
Kayenta Boarding School
AZ
19
27
46
$327,300
Kha'p'o' Community School
NM
30
31
61
$327,300
Kin Dah Lichi'l' Olta' Inc
AZ
31
42
73
$327,300
Lac Courte Oreilles
WI
17
27
44
$327,300
Leupp Boarding School
AZ
32
36
68
$327,300
Little Singer Community School
AZ
41
43
84
$327,300
Little Wound Day School
SD
21
23
44
$327,300
Many Farms Community School, Inc.
AZ
58
70
128
$332,300
Mariano Lake Community School
NM
15
20
35
$327,300
Na'Neelzhiin Ji'Olta (Torreon)
NM
11
16
27
$327,300
Nazlini Community School
AZ
37
43
80
$327,300
Menominee Tribal School
4
MN
TBD
TBD
TBD
$289,000
Ojo Encino Day School
3
NM
TBD
TBD
TBD
$327,300
Oneida Nation Schools
WI
46
55
101
$327,300
Pine Hill Schools (Ramah Navajo School)
NM
43
34
77
$327,300
Pine Ridge School
SD
44
30
74
$327,300
Pueblo Pintado Community School
NM
13
15
28
$327,300
Rough Rock Community School
AZ
29
10
39
$327,300
Appendix 3-26
Salt River Day School AZ 21 18 39 $327,300
St. Francis Indian School SD 34 38 72 $327,300
Tate Topa Tribal School (Four Winds) ND 29 42 71 $327,300
Theodore Jamerson Elementary School ND 25 33 58 $327,300
T'iis Nazbas (Teecnospos) Community
School
AZ 37 47 84 $327,300
T'iists'oozi' bi'o'lta (Crownpoint) NM 37 54 91 $327,300
Tohaali' Community School NM 0 $327,300
To'Hajiilee-He (Canoncito) NM 31 33 64 $327,300
Tse'ii'ahi' (Standing Rock) Community
School NM 26 30 56 $327,300
Wide Ruins Community School
3
AZ TBD TBD TBD $327,300
Wingate Elementary School NM 42 41 83 $327,300
TOTAL 1,483 1,709 3,192 $17,323,600
1. The child count is from School Year 2020-2021. The final count for School Year 2021-2022 will
not be available until June 2023.
2. Current School Year 2021-2022 dollar amounts include a base distribution of $289,000 and $8,300
for a language and culture program. An additional $30,000 for the increase in the overall cost of
living and salaries totaling $327,300 per site. BIE holds a portion of total allocation for admin
expenses.
3. The final count for these schools will not be available until May 2023.
4. New school to the FACE program.
Appendix 3-27
Distributi
on of Safe and Secure Funds for School Year 2022-2023
Funding was provided in FY 2022-2023 to school programs that were identified as having high safety and
security issues. Through training, technical assistance and identification of the safety and security needs,
schools began to implement changes that were identified on their campuses. These schools utilize the
funds provided to advance a safe learning environment for both students and staff. Additional funds were
provided to support police and security services at off-reservation boarding schools with unique at risk
student populations and proximity to urban centers.
Appendix 3-28
Distribution of Safe and Secure Funds for School Year 2022 - 2023
School Name State
Three
Year
Average
ADM
Three
Year
Average
WSU
Funding
1 Dishchii'bikoh Community School AZ 480.2 737.78 45,000
2 Hopi Jr./Sr. High School AZ 670.83 732.63 45,000
3 Many Farms High School AZ 538.9 737.38 45,000
4 Salt River Day School AZ 355.47 496.15 4,000
5 Noli School CA 125.25 193.53 45,000
6 Sherman Indian High School CA 355.56 1,211.83 200,000
7
Joseph K. Lumsden Bahweting Anishnabe
School
MI 313.11 467.11 45,000
8 Choctaw Agency Schools MS 2,157.58 3,426.76 139,000
9 Two Eagle River School MT 82.65 149.17 4,000
10 Cherokee Central High School NC 1,473.97 1,640.25 45,000
11 Circle of Nations School (Wahpeton) ND 80.65 286.17 45,000
12 Standing Rock Community Grant School ND 629.83 1,037.64 45,000
13 Tate Topa Tribal School (Four Winds) ND 505.09 737.7 45,000
14 Mescalero Apache School NM 524.18 777.51 45,000
15 Wingate Elementary School NM 430.75 943.19 45,000
16 Wingate High School NM 446.39 1,271.86 45,000
17 Jones Academy OK 165.42 382.11 4,000
18 Riverside Indian School OK 470.51 1,481.55 200,000
19 Chemawa Indian School OR 315.91 1,046.72 200,000
20 Cheyenne-Eagle Butte School SD 818.39 1,345.17 45,000
21 Flandreau Indian School SD 223.54 710.3 200,000
22 Little Wound Day School SD 726.7 1,173.74 45,000
23 Pine Ridge School SD 755.45 1,357.43 45,000
24 St. Francis Indian School SD 651.92 1,097.92 45,000
25 Tiospa Zina Tribal School SD 520.35 813.04 45,000
26 Chief Leschi School System (Puyallup) WA 636.96 944.67 45,000
27 Paschal Sherman Indian School WA 117.28 274.3 45,000
28 Lac Courte Oreilles Ojibwa School WI 258.96 422.02 45,000
TOTAL 1,851,000