Page 2 of 6
8. Commercial Project Application – changes:
• In ACA ONLY - Prevent user from unchecking Sitework permit type if Complete New Building
permit type is also checked.
• “Finish Out” permit type will only display as an option when Phased is “NO.”
• Update Inspections to Pending to allow scheduling when the Trade Work Permitted Custom
List Date for the corresponding Trade is updated with a Date in AA.
• Activate CPS Release Task to “CPS – Permanent Review Required” status and Permit Closure
Task to “COO Issuance Review Required” status and assign to Customer Advocate when all
inspections are closed. Staff will review for COO Issuance and if approved will close the
tasks which will generate Certificate of Occupancy and send CPS Permanent interface to
CPS.
• Building Addressing Inspection will be available for creating and scheduling on the
Commercial Building Permit.
• When “Building – Addressing” inspection is scheduled, it will be auto-assigned to the same
Addressing Planner who performed the Technical Review.
• The following items have been added to the “Special Inspection Details” Checklist:
• Fabricated Items
• Fabricated Type: Shop/Factory
• Fabricated Type: Field
• Fabricated Notes
• Technical Review – Sidewalk/Traffic has been updated to systematically assign via round
robin to Traffic Sidewalk Reviewer (if existing TIA Report) otherwise to “TCI Streets
Reviewer”
• Electrical inspections will default for Complete New Building when customer indicates
Electrical work is in scope.
• Retaining Wall Inspection will default for Minor Structure – Retaining Wall.
9. Certificate of Occupancy Application – changes:
a. Occupant Load and Occupant Group fields on the Application will be systematically updated
when COO Checklist is updated on a Building – COO or Fire – COO inspection.
• FFE Certificate will be systematically created when Custom List row is updated to Active.
10. Demolition Pedestrian Protection Application – changes:
• Permit Fee Waiver task will only activate if customer indicates Waiver Eligible as “YES.”
• Electrical Inspection will auto-default to be created on the permit when the customer
indicates Electrical Contractor will be required.
11. Limited Services Repair Application – changes:
• Question “Is this for a water softener or reverse osmosis?” is now required when requesting
Plumbing type. If customer indicates YES, WTT License type will be allowed.
• Print Shop Property Owner Letter file will be created systematically Mon-Fri.
12. Manufactured Home Application – changes:
• Technical Review – Zoning will only activate when updated manually by Staff.
13. MEP Trade Application – changes: