Electronic Document Review (EDR)
Submittal Requirements
Version 1.1
4/15/2015
Table of Contents
Introduction .................................................................................................................................................. 3
Electronic Document Review Submittals: ..................................................................................................... 4
Plans .......................................................................................................................................................... 4
Plat ............................................................................................................................................................ 4
Energy Code Documents ........................................................................................................................... 4
Forms ........................................................................................................................................................ 5
Correspondence ........................................................................................................................................ 5
Plan Revisions ........................................................................................................................................... 5
Submittal Standards: ..................................................................................................................................... 5
File format: ................................................................................................................................................ 5
Security: .................................................................................................................................................... 5
Scale: ......................................................................................................................................................... 6
Page Orientation: ...................................................................................................................................... 6
Naming: ..................................................................................................................................................... 6
Bookmarks: ............................................................................................................................................... 7
File Size:..................................................................................................................................................... 7
Compatibility: ............................................................................................................................................ 8
Guide to Forms Found on the City of Fort Worth Website: ......................................................................... 9
Plans Review Process: ................................................................................................................................... 9
Online Application: ................................................................................................................................... 9
Application Review: .................................................................................................................................. 9
Plan Review: .............................................................................................................................................. 9
Correction Notices, Customer Responses and Resubmittal of Revised Plans: ....................................... 10
Issue Permit ............................................................................................................................................ 10
Field Inspections ..................................................................................................................................... 11
2
Version 1.1
4/15/2015
Introduction
In the City Fort Worth’s ongoing efforts to improve our service and be more accessible to our customers,
The Planning and Development Department is proud to introduce Electronic Document Review as part
of our online permitting system. This new functionality allows citizens and customers to apply for
permits, pay most fees, upload documents for review, and receive/answer comments online for the
most common building permits and zoning/platting functions. Most applications can be completed
without ever coming to City Hall.
Each permit application will have specific required submittals. There are six main types of submittals
though not every permit requires every submittal. Below is a table that shows what should be included
in each type of submittals.
Please note: EDR submittal is not an expedited review. The same review process and time lines apply to
both EDR and hard copy submittals.
Information You Will Need:
In order to make an application online you will need the following information available:
Plan documents as outlined in the section below
Property Address
Contact information for the registered contractor associated with the project, or their
registration number
Site Contact Information The person the building inspectors will contact
Plans Exam Contact information the person who will work with Plans Exam staff
Your TDLR number for accessibility review if your project is over $50,000
Total Job Value construction cost
Square footage of the project
Estimated Cost the construction cost excluding mechanical, electrical, and plumbing work
Plan documents as outlined in the section below
3
Version 1.1
4/15/2015
Electronic Document Review Submittals:
EDR submittals should include the following content. All files should be PDF format and be named
according to the naming convention found in the “naming” section
EDR Submittals
Document description:
Included in which submittal type:
Site, Architectural, Mechanical, Electrical, Plumbing, Structural,
Civil, Landscape, and Urban Forestry plans. All plans should be
combined into a single document (include Page Bookmarks in PDF
Version 11) and be less than 256 MB.
Plans
Legible Certified Copy of the legally recorded plat
Plat
COMcheck, RESNET, IC3, Energy Star, or ASHRAE 90.1 Reports. A
separate report is necessary even if included in building plans.
Energy Code Documents
City of Fort Worth Permit Application, Zoning Use Verification
Form, Monotony Diagram, and similar City of Fort Worth Forms
Forms
Design professional letters, requested product information, and
similar informational documents
Correspondence
Revised plans in response to plan review comments in the same
format as originally submitted
Plan Revisions
Plans
Every application will require some sort of plan. The more complicated the project, the more involved
the required plan submittal will be. All building plans shall be contained within a single PDF file. Each
section of the application shall be bookmarked (see bookmark section for more info.) for easy referencing
during the plan review process. Please visit the City of Fort Worth website for a detailed list of what’s
required for your individual permit type. http://fortworthtexas.gov/planninganddevelopment/permits/
Plat
A scanned certified copy of the property’s legally recorded plat is required for any new structure or
expansion of an existing structure. The scan must be legible and include all portions of the plat.
Energy Code Documents
The energy code report is compared against the provided plans to determine if the proposed
construction complies with the adopted International Energy Conservation Code. The City of Fort Worth
accepts “Energy Star”, “REM/rate”, and IC3 Reports” for residential construction. More information
about each report is available on the internet by searching for the product name. The most common
option for commercial buildings is COMcheck, for approval of another program please contact the
Building Code Administrator at 817-392-7843.
4
Version 1.1
4/15/2015
Forms
The detailed project submittal documents will include the forms that various departments use to gather
information not available on the plans. Individual forms are available from the City of Fort Worth’s
website at
Correspondence
This submittal type is optional and should be used for letters or other written communications beyond
the plans.
Plan Revisions
Plan Revisions are distinct and different from the resubmission process that happens during the initial
review process. Plan Revisions are typically for required field changes or modifications during the course
of construction. Plan Revisions should only be uploaded after the plans have been reviewed and
approved.
Submittal Standards:
All digital files shall comply with the following standards. Deviation from the standards could cause
delays in the application process:
File format:
1. All digital document files must be MS-Windows (i.e. not Apple OS) compatible. This does not
mean that you cannot create the files on a MAC platform and convert them.
2. All digital documents shall be in Portable Document Format (PDF) and compatible with Adobe
Acrobat XI (11) Professional. Older versions of Acrobat may be used, but staff will provide corrections
in Acrobat 11 format only due to security restrictions. PDF’s shall be a first generation vector based
file (direct conversion from AutoCAD, ArchiCAD, MS Word, etc.). Scanned plans (i.e. plans,
elevations, sections, details) will not be accepted. However, scanned plats, correspondence, energy
code documents, and forms will fine.
Security:
Document security must allow city staff to mark up plans, create comments, and add or remove sheets
as necessary.
5
Version 1.1
4/15/2015
Scale:
Plans must be generated at a defined scale (i.e. ¼”= 1’, ½”= 1’, etc…) to allow staff to verify dimensions
and areas using the Adobe Acrobat measurement tools. Graphic scales may also be include but are not
required.
Page Orientation:
All plans must be set to landscape orientation with the top of the page at the top of the monitor. A
north arrow shall be included on all plans. Other submittal types may be set to either landscape or
portrait orientation with the top of the page at the top of the monitor.
Naming:
The files should be named based on street address, the submittal, and the type of submittal. For initial
submittals it would look like this:
123 Example Way SUB 1 Plans
123 Example Way SUB 1 Plat
123 Example Way SUB 1 Energy Code Documents
123 Example Way SUB 1 Forms
Subsequent resubmittals should follow the same protocol with the next higher submittal number:
123 Example Way SUB 2 Plans
123 Example Way SUB 2 Plat
123 Example Way SUB 2 Energy Code Documents
123 Example Way SUB 2 Forms
6
Version 1.1
4/15/2015
Bookmarks:
All plan sheets shall be contained in a single PDF File. To facilitate references during the plan review and
intake process each sheet should be bookmarked with the sheet number and title (see example). Please
ensure that the complete pages show prior to bookmarking by selecting. This can be done by selecting
this icon from the tool bar:
File Size:
All files to be uploaded must be less than 256 MB. Files should be reduced to the smallest size
possible to provide quick access to the files. To reduce file sizes within Acrobat 11 Pro, select “Save
As Other” then “Optimized PDF…”, settings “Mobile” with a “Make compatible with: Acrobat 10.0 or
later. If any of your files are larger, please contact the Planning and Development Department’s IT
staff (817.392.2303) or the Building Code Administrator (817.392.7843) for assistance prior to
submittal or resubmittal.
7
Version 1.1
4/15/2015
Compatibility:
The process described above under File Size must be followed to insure that the PDF files are as small as
possible, but also to ensure compatibility with the City’s process. To verify that your files are saved in
the appropriate compatibility, with the file open in Acrobat 10 (also called Acrobat X) or Acrobat 11
select File, and then Properties.
This will open the Document Properties window. Within this window select the Description tab. In
the lower portion of this window in the advanced box will be displayed the PDF Version which
the file is currently compatible with. Acrobat X is equivalent to Acrobat 10. This is the minimum.
Anything older will not work.
8
Version 1.1
4/15/2015
Guide to Forms Found on the City of Fort Worth Website:
The necessary forms to complete the Electronic Document Review Process are available on the City of
Fort Worth website at: http://fortworthtexas.gov/planninganddevelopment/dev.aspx?id=22224
A
Application
For Permit
Uploaded at time of application.
B
Required
Plans and
Documents
Explanation of what plans and documents are
required for each permit type
C
Required
Zoning forms
Forms with additional information necessary for
complete zoning review
Plans Review Process:
The outline below represents the typical process for and EDR application. The number of review cycles
will vary for each project depending on the corrections requested.
Online Application:
The customer provides all the necessary information and uploads the required plans to the City of Fort
Worth’s online permitting site through Accela Citizen Access (ACA). The same website can also be used
to track the progress of the application.
https://accela.fortworthtexas.gov/citizenaccess/
.
Application Review:
City of Fort Worth customer service staff will review the permit information and the submitted
documents for completeness. An email notification will be sent informing customers that their
application has been accepted for processing or additional information is required to proceed.
Plan Review:
The number of required reviews depends on the location of the project and the scope of work. All
reviews take place simultaneously and plan comments will be compiled at the end of each review cycle.
When each plan review cycle is complete, customers will be notified via email that their application is
approved or required revisions. Plan Review comments will provided as a combination of markup’s
9
Version 1.1
4/15/2015
directly on the submitted plans and a report that can be downloaded by clicking the
button in the permit record. Separate hold notes from each plan review discipline may be available
prior to the official notification. This allows the design team to begin working on corrections as soon as
possible. However, customers must coordinate the design team’s response and resubmit a complete set
of drawings to responding to all review comments and begin a new review cycle.
The progress of the reviews can be tracked anytime on ACA. Incomplete required reviews are indicated
by an hourglass icon and completed reviews are indicated by a check mark .
Correction Notices, Customer Responses and Resubmittal of Revised Plans:
To address plan review deficiencies, applicants must resubmit a complete set of plans through the ACA
portal. Once the plans have been processed the “Resubmit” action becomes available in the
Attachments section of the ACA permit record. Plan sets addressing correction requests must be
resubmitted though theResubmit” link associated with the plans in order to avoid processing delays.
A partial submittal of individual sheets is not permitted and will delay the review process. A complete set
is required to ensure that both the field drawing set and the City's record set remain current and identical
throughout the process. Resubmittals, if necessary, must be submitted in the same format and scale as
the original submission. All revisions shall be clouded and delta’d with an explanation from the
professional in a response letter which addresses all holds identified by the plans examiner.
Mid-plan review scope revisions which are voluntarily made by the applicant or the design team, and
which do not directly relate to plan review correction comments must be brought to the attention of the
plan review staff and detailed in the response to plan review correction comments letter. Mid-plan
review scope revisions can require significant process and handling changes and will impact the service
delivery timeline .
Issue Permit
When all plan review disciplines have approved the project the applicant will receive an email notifying
them that their permit is approved. Once all fees have been paid the permit will be issued by Planning
and Development Customer Service.
10
Version 1.1
4/15/2015
Field Inspections
After the permit is issued, the contractor must have a complete set of officially approved plans, with all
City of Fort Worth stamps, available for the inspector. The official plans will be the most recent
approved plans submitted to ACA and accepted by the City of Fort Worth.
11
Version 1.1
4/15/2015