214A Foundation-SlabInspectionChecklist181223
13.
□ □ Footings including interior pier footings are constructed per the approved plans.
CRC Chapter 4
14.
□ □ All forms completed and adequately braced. CRC §R404.1.3.3.6
15.
□ □ The bottoms of footings are stepped on slopes over 10%. CRC §R403.1.5 &
CRC §R403.1
16.
□ □ Above 5,000 ft. elevation: Bottoms of exterior footings & piers shall extend below the
required frost depth. (18” minimum depth for 5001’-7000’, 24” minimum depth for
7001’-8000’) Table R301.2, as amended by PCC 15.04.360.
17.
□ □ The footings/piers are keyed into undisturbed soil a minimum of 12” or a compaction
report is provided. CRC §R403.1.4
18.
□ □ The top of the stem wall which supports wood framing and sheathing is at least 8” above
finished grade or preservative treated per CRC §R317.2
19.
□ □ Mud, loose dirt, rocks, debris, snow, and ice are removed from footings. CRC §R403
20.
□ □ All reinforcing steel is tied in place, including slab dowels. CRC §R403
Size and grade of rebar is per plans. Reinforcement is adequately supported.
Min. 3” clearance to earth on all sides. Min. 1½” clear to outside and ¾” to inside forms.
Splices are a minimum 40 bar diameters or per approved plans. Reinforcing is free of
scale and rust and is clean.
21.
□ □ Hold-down bolts, anchor bolts and hold-down straps are secured in place for all shear
walls. Bolts have sufficient projection for 2x or 3x sill plate. CRC §R403 Size, spacing
and locations are per the approved plans. All other anchor bolts shall be allowed to be
wet set and shall be on site at time of inspection.
22.
□ □ Two-pour foundation (if applicable) is addressed on plans.
23.
□ □ Raised Foundation at all exterior doors, and where concrete to wood is placed against
building the foundations shall be raised/extended. No concrete to wood allowed at
landings/patios. If raised foundation detail is not included in the approved plans, the
engineer of record shall provide the contractor with an approved detail of the raised
foundation prior to inspection.
24.
□ □ Anchor bolts and washers in contact with pressure-treated and fire-retardant-treated wood
are galvanized. CRC §R317.3 Exception: #1, ½” diameter or greater steel bolts.
25.
□ □ Column bases are set in place or on job site. CRC §R109.1.1
26.
□ □ Provisions for an underfloor access are provided. CRC §R408.4
Minimum 18” x 24” for through the floor access 16” x 24” for through the wall access.
27. □ □
Sleeve for waste piping is installed through foundation. CPC §312.10
28.
□ □ Piping shall be protected against direct contact with concrete and shall not be directly
embedded in concrete. CPC §312.2 Waste and water piping systems shall be completed
and on test.
29. □ □
Waste plumbing laying on the ground is adequately bedded for the